decommission-validated-system
Acerca de
Esta habilidad guía a los desarrolladores a través de la desmantelación controlada de un sistema validado, asegurando el cumplimiento de las normativas de retención de datos. Maneja pasos clave como la validación de migración de datos, la estrategia de archivado y la revocación de acceso. Úsela al reemplazar o retirar un sistema debido al fin de su vida útil, la discontinuación del soporte o cambios regulatorios.
Instalación rápida
Claude Code
Recomendadonpx skills add pjt222/agent-almanac -a claude-code/plugin add https://github.com/pjt222/agent-almanacgit clone https://github.com/pjt222/agent-almanac.git ~/.claude/skills/decommission-validated-systemCopia y pega este comando en Claude Code para instalar esta habilidad
Documentación
Decommission Validated System
Controlled retirement of validated sys + preserve data integrity + meet retention reqs.
Use When
- Validated sys replaced
- EOL no replacement (biz proc eliminated)
- Vendor discontinues support
- Consolidation → single platform
- Reg / biz changes → obsolete
In
- Required: Sys (name, ver, valid status)
- Required: Retention reqs (21 CFR Part 11, GLP, GCP)
- Required: Replacement sys (if applic) + migration scope
- Optional: Current valid doc pkg
- Optional: Data vol + fmt inventory
- Optional: Biz owner + stakeholders
Do
Step 1: Retention Reqs
How long + what form:
# Data Retention Assessment
## Document ID: DRA-[SYS]-[YYYY]-[NNN]
### Regulatory Retention Requirements
| Regulation | Data Type | Retention Period | Format Requirements |
|-----------|-----------|-----------------|-------------------|
| 21 CFR 211 (GMP) | Batch records, test results | 1 year past product expiry or 3 years after distribution | Readable, retrievable |
| 21 CFR 58 (GLP) | Study data and records | Duration of study + retention agreement | Original or certified copy |
| ICH E6 (GCP) | Clinical trial records | 2 years after last marketing approval or formal discontinuation | Accessible for inspection |
| 21 CFR Part 11 | Electronic records | Per predicate rule | Original format or validated migration |
| EU Annex 11 | Computerized system records | Per applicable GxP | Readable and available |
| Tax/financial | Financial records | 7-10 years (jurisdiction-dependent) | Readable |
### System Data Inventory
| Data Category | Volume | Format | Retention Required Until | Disposition |
|---------------|--------|--------|------------------------|-------------|
| [e.g., Batch records] | [e.g., 50,000 records] | [e.g., Database + PDF reports] | [Date] | Migrate / Archive / Destroy |
| [e.g., Audit trail] | [e.g., 2M entries] | [e.g., Database] | [Same as parent records] | Archive |
| [e.g., User data] | [e.g., 200 profiles] | [e.g., LDAP/Database] | [Employment + 2 years] | Anonymise and archive |
Got: Every cat has retention + fmt + disposition.
If err: Unclear reqs → consult regulatory + legal. Default longest applic.
Step 2: Migration Plan (If Applic)
Data → replacement:
# Data Migration Plan
## Document ID: DMP-[SYS]-[YYYY]-[NNN]
### Migration Scope
| Source | Target | Data Category | Records | Migration Method |
|--------|--------|---------------|---------|-----------------|
| [Old system] | [New system] | [Category] | [Count] | ETL / Manual / API |
### Data Mapping
| Source Field | Source Format | Target Field | Target Format | Transformation |
|-------------|-------------|-------------|---------------|---------------|
| [e.g., test_result] | FLOAT(8,2) | [e.g., result_value] | DECIMAL(10,3) | Precision conversion |
| [e.g., operator_id] | VARCHAR(20) | [e.g., user_id] | UUID | Lookup table mapping |
### Validation Approach
| Check | Method | Acceptance Criteria |
|-------|--------|-------------------|
| Record count reconciliation | Source count vs target count | 100% match |
| Field-level comparison | Sample 5% of records, all fields | 100% match after transformation |
| Checksum verification | Hash source vs target for key fields | Checksums match |
| Business rule validation | Verify key calculations in target | Results match source |
| Audit trail continuity | Verify historical audit trail migrated | All entries present with original timestamps |
Got: Plan w/ mapping + transforms + validation → proves integrity.
If err: Migration valid fails → do NOT decommission. Fix + re-validate.
Step 3: Archival Strategy
Data → archive (not migrate):
# Archival Strategy
### Archive Format
| Consideration | Decision | Rationale |
|--------------|----------|-----------|
| Format | [PDF/A, CSV, XML, database backup] | [Why this format survives the retention period] |
| Medium | [Network storage, cloud archive, tape, optical] | [Durability and accessibility] |
| Encryption | [Yes/No — method if yes] | [Security vs long-term accessibility trade-off] |
| Integrity verification | [SHA-256 checksums, periodic verification schedule] | [Prove archive is uncorrupted] |
### Archive Verification
- [ ] Archived data is readable without the source system
- [ ] All required data categories are included in the archive
- [ ] Checksums recorded at time of archival
- [ ] Archive can be searched and retrieved within [defined SLA, e.g., 5 business days]
- [ ] Periodic integrity checks scheduled (annually)
### Archive Access
| Role | Access Level | Authorisation |
|------|-------------|--------------|
| QA Director | Read access to all archived data | Standing authorisation |
| Regulatory Affairs | Read access for inspection support | Standing authorisation |
| System Owner (former) | Read access for business queries | Request-based |
| External auditors | Read access, supervised | Per audit plan |
Got: Archive readable + searchable + verifiable w/o orig sys.
If err: Can't read indep of src sys → not compliant. Export → open std fmt (PDF/A, CSV) pre-decomm.
Step 4: Execute
# Decommission Checklist
## Document ID: DC-[SYS]-[YYYY]-[NNN]
### Pre-Decommission
- [ ] All stakeholders notified of decommission date and data disposition
- [ ] Data migration completed and validated (if applicable)
- [ ] Data archive created and verified (if applicable)
- [ ] Final backup of complete system taken and stored separately
- [ ] All open change requests resolved or transferred
- [ ] All open CAPAs resolved or transferred to successor system
- [ ] All active users informed and redirected to replacement system (if applicable)
### Decommission Execution
- [ ] User access revoked for all accounts
- [ ] System removed from production environment
- [ ] Network connections disconnected
- [ ] Licenses returned or terminated
- [ ] System entry removed from active system inventory
- [ ] System moved to "Decommissioned" status in compliance architecture
### Post-Decommission
- [ ] Validation documentation archived (URS, VP, IQ/OQ/PQ, TM, VSR)
- [ ] SOPs retired or updated to remove references to decommissioned system
- [ ] Training records archived
- [ ] Change control records archived
- [ ] Audit trail archived
- [ ] Decommission report completed and approved
### Decommission Report
| Section | Content |
|---------|---------|
| System description | Name, version, purpose, GxP classification |
| Decommission rationale | Why the system is being retired |
| Data disposition summary | What data went where (migrated, archived, destroyed) |
| Validation evidence | Migration validation results, archive verification |
| Residual risk | Any ongoing data retention obligations |
| Approval | System owner, QA, IT signatures |
Got: Decomm = controlled + documented + approved. Not "turn it off".
If err: Any item incomplete → doc exception + QA approval before proceeding.
Check
- Retention reqs assessed all cats
- Migration validated w/ counts + sampling + checksums (if applic)
- Archive in fmt readable w/o src sys
- Archive integrity verified w/ checksums
- All user access revoked
- Valid docs archived w/ retention period
- SOPs updated to remove decomm sys refs
- Decomm report approved: sys owner + QA + IT
Traps
- Premature decomm: Turn off pre-migration valid → permanent data loss. Complete valid first.
- Unreadable archives: Proprietary fmt needs orig sys → defeats purpose. Use open fmts.
- Forgotten audit trails: Archive data but not audit trail → no provenance. Always archive trails w/ parent records.
- Orphaned SOPs: SOPs still ref decomm sys → user confusion + compliance gaps. Update / retire all.
- No periodic archive verify: Archives degrade. No integrity checks → loss undetected until inspection.
→
design-compliance-architecture— update sys inventory post-decommmanage-change-control— decomm = major change → change controlwrite-validation-documentation— migration valid follows same IQ/OQwrite-standard-operating-procedure— retire/update SOPsprepare-inspection-readiness— archived data accessible for inspections
Repositorio GitHub
Habilidades relacionadas
evaluating-llms-harness
PruebasEsta Skill de Claude ejecuta el benchmark lm-evaluation-harness para evaluar modelos de lenguaje en más de 60 tareas académicas estandarizadas como MMLU y GSM8K. Está diseñada para que los desarrolladores comparen la calidad de los modelos, realicen seguimiento del progreso del entrenamiento o reporten resultados académicos. La herramienta admite varios backends, incluidos modelos de HuggingFace y vLLM.
cloudflare-cron-triggers
PruebasEsta habilidad proporciona conocimiento integral para implementar Cron Triggers de Cloudflare y programar Workers mediante expresiones cron. Cubre la configuración de tareas periódicas, trabajos de mantenimiento y flujos de trabajo automatizados, manejando problemas comunes como expresiones cron inválidas y inconvenientes de zonas horarias. Los desarrolladores pueden utilizarla para configurar manejadores programados, probar activadores cron e integrar con Workflows y Green Compute.
webapp-testing
PruebasEsta habilidad de Claude proporciona un kit de herramientas basado en Playwright para probar aplicaciones web locales mediante scripts de Python. Permite verificación de frontend, depuración de interfaz de usuario, captura de pantallas y visualización de registros, mientras gestiona los ciclos de vida del servidor. Úsela para tareas de automatización de navegadores, pero ejecute los scripts directamente en lugar de leer su código fuente para evitar contaminación del contexto.
finishing-a-development-branch
PruebasEsta habilidad ayuda a los desarrolladores a completar el trabajo terminado verificando que las pruebas pasen y luego presentando opciones estructuradas de integración. Guía el flujo de trabajo para fusionar, crear PRs o limpiar ramas después de que se completa la implementación. Úsala cuando tu código esté listo y probado para finalizar sistemáticamente el proceso de desarrollo.
