Decommission Validated System
Controlled retirement of validated sys + preserve data integrity + meet retention reqs.
Use When
- Validated sys replaced
- EOL no replacement (biz proc eliminated)
- Vendor discontinues support
- Consolidation → single platform
- Reg / biz changes → obsolete
In
- Required: Sys (name, ver, valid status)
- Required: Retention reqs (21 CFR Part 11, GLP, GCP)
- Required: Replacement sys (if applic) + migration scope
- Optional: Current valid doc pkg
- Optional: Data vol + fmt inventory
- Optional: Biz owner + stakeholders
Do
Step 1: Retention Reqs
How long + what form:
# Data Retention Assessment
## Document ID: DRA-[SYS]-[YYYY]-[NNN]
### Regulatory Retention Requirements
| Regulation | Data Type | Retention Period | Format Requirements |
|-----------|-----------|-----------------|-------------------|
| 21 CFR 211 (GMP) | Batch records, test results | 1 year past product expiry or 3 years after distribution | Readable, retrievable |
| 21 CFR 58 (GLP) | Study data and records | Duration of study + retention agreement | Original or certified copy |
| ICH E6 (GCP) | Clinical trial records | 2 years after last marketing approval or formal discontinuation | Accessible for inspection |
| 21 CFR Part 11 | Electronic records | Per predicate rule | Original format or validated migration |
| EU Annex 11 | Computerized system records | Per applicable GxP | Readable and available |
| Tax/financial | Financial records | 7-10 years (jurisdiction-dependent) | Readable |
### System Data Inventory
| Data Category | Volume | Format | Retention Required Until | Disposition |
|---------------|--------|--------|------------------------|-------------|
| [e.g., Batch records] | [e.g., 50,000 records] | [e.g., Database + PDF reports] | [Date] | Migrate / Archive / Destroy |
| [e.g., Audit trail] | [e.g., 2M entries] | [e.g., Database] | [Same as parent records] | Archive |
| [e.g., User data] | [e.g., 200 profiles] | [e.g., LDAP/Database] | [Employment + 2 years] | Anonymise and archive |
Got: Every cat has retention + fmt + disposition.
If err: Unclear reqs → consult regulatory + legal. Default longest applic.
Step 2: Migration Plan (If Applic)
Data → replacement:
# Data Migration Plan
## Document ID: DMP-[SYS]-[YYYY]-[NNN]
### Migration Scope
| Source | Target | Data Category | Records | Migration Method |
|--------|--------|---------------|---------|-----------------|
| [Old system] | [New system] | [Category] | [Count] | ETL / Manual / API |
### Data Mapping
| Source Field | Source Format | Target Field | Target Format | Transformation |
|-------------|-------------|-------------|---------------|---------------|
| [e.g., test_result] | FLOAT(8,2) | [e.g., result_value] | DECIMAL(10,3) | Precision conversion |
| [e.g., operator_id] | VARCHAR(20) | [e.g., user_id] | UUID | Lookup table mapping |
### Validation Approach
| Check | Method | Acceptance Criteria |
|-------|--------|-------------------|
| Record count reconciliation | Source count vs target count | 100% match |
| Field-level comparison | Sample 5% of records, all fields | 100% match after transformation |
| Checksum verification | Hash source vs target for key fields | Checksums match |
| Business rule validation | Verify key calculations in target | Results match source |
| Audit trail continuity | Verify historical audit trail migrated | All entries present with original timestamps |
Got: Plan w/ mapping + transforms + validation → proves integrity.
If err: Migration valid fails → do NOT decommission. Fix + re-validate.
Step 3: Archival Strategy
Data → archive (not migrate):
# Archival Strategy
### Archive Format
| Consideration | Decision | Rationale |
|--------------|----------|-----------|
| Format | [PDF/A, CSV, XML, database backup] | [Why this format survives the retention period] |
| Medium | [Network storage, cloud archive, tape, optical] | [Durability and accessibility] |
| Encryption | [Yes/No — method if yes] | [Security vs long-term accessibility trade-off] |
| Integrity verification | [SHA-256 checksums, periodic verification schedule] | [Prove archive is uncorrupted] |
### Archive Verification
- [ ] Archived data is readable without the source system
- [ ] All required data categories are included in the archive
- [ ] Checksums recorded at time of archival
- [ ] Archive can be searched and retrieved within [defined SLA, e.g., 5 business days]
- [ ] Periodic integrity checks scheduled (annually)
### Archive Access
| Role | Access Level | Authorisation |
|------|-------------|--------------|
| QA Director | Read access to all archived data | Standing authorisation |
| Regulatory Affairs | Read access for inspection support | Standing authorisation |
| System Owner (former) | Read access for business queries | Request-based |
| External auditors | Read access, supervised | Per audit plan |
Got: Archive readable + searchable + verifiable w/o orig sys.
If err: Can't read indep of src sys → not compliant. Export → open std fmt (PDF/A, CSV) pre-decomm.
Step 4: Execute
# Decommission Checklist
## Document ID: DC-[SYS]-[YYYY]-[NNN]
### Pre-Decommission
- [ ] All stakeholders notified of decommission date and data disposition
- [ ] Data migration completed and validated (if applicable)
- [ ] Data archive created and verified (if applicable)
- [ ] Final backup of complete system taken and stored separately
- [ ] All open change requests resolved or transferred
- [ ] All open CAPAs resolved or transferred to successor system
- [ ] All active users informed and redirected to replacement system (if applicable)
### Decommission Execution
- [ ] User access revoked for all accounts
- [ ] System removed from production environment
- [ ] Network connections disconnected
- [ ] Licenses returned or terminated
- [ ] System entry removed from active system inventory
- [ ] System moved to "Decommissioned" status in compliance architecture
### Post-Decommission
- [ ] Validation documentation archived (URS, VP, IQ/OQ/PQ, TM, VSR)
- [ ] SOPs retired or updated to remove references to decommissioned system
- [ ] Training records archived
- [ ] Change control records archived
- [ ] Audit trail archived
- [ ] Decommission report completed and approved
### Decommission Report
| Section | Content |
|---------|---------|
| System description | Name, version, purpose, GxP classification |
| Decommission rationale | Why the system is being retired |
| Data disposition summary | What data went where (migrated, archived, destroyed) |
| Validation evidence | Migration validation results, archive verification |
| Residual risk | Any ongoing data retention obligations |
| Approval | System owner, QA, IT signatures |
Got: Decomm = controlled + documented + approved. Not "turn it off".
If err: Any item incomplete → doc exception + QA approval before proceeding.
Check
- Retention reqs assessed all cats
- Migration validated w/ counts + sampling + checksums (if applic)
- Archive in fmt readable w/o src sys
- Archive integrity verified w/ checksums
- All user access revoked
- Valid docs archived w/ retention period
- SOPs updated to remove decomm sys refs
- Decomm report approved: sys owner + QA + IT
Traps
- Premature decomm: Turn off pre-migration valid → permanent data loss. Complete valid first.
- Unreadable archives: Proprietary fmt needs orig sys → defeats purpose. Use open fmts.
- Forgotten audit trails: Archive data but not audit trail → no provenance. Always archive trails w/ parent records.
- Orphaned SOPs: SOPs still ref decomm sys → user confusion + compliance gaps. Update / retire all.
- No periodic archive verify: Archives degrade. No integrity checks → loss undetected until inspection.
→
design-compliance-architecture— update sys inventory post-decommmanage-change-control— decomm = major change → change controlwrite-validation-documentation— migration valid follows same IQ/OQwrite-standard-operating-procedure— retire/update SOPsprepare-inspection-readiness— archived data accessible for inspections
GitHub リポジトリ
関連スキル
evaluating-llms-harness
テストこのClaudeスキルは、lm-evaluation-harnessを実行し、MMLUやGSM8Kなど60以上の標準化学術タスクでLLMをベンチマークします。開発者がモデルの品質を比較し、トレーニングの進捗を追跡し、学術的な結果を報告するために設計されています。このツールはHuggingFaceやvLLMモデルを含む様々なバックエンドをサポートしています。
cloudflare-cron-triggers
テストこのスキルは、cron式を使用してWorkersをスケジュールするためのCloudflare Cron Triggersの実装に関する包括的な知識を提供します。定期的なタスクの設定、メンテナンスジョブ、自動化されたワークフローの構築を網羅し、無効なcron式やタイムゾーン問題といった一般的な課題への対処法も含みます。開発者はこれを使用して、スケジュールされたハンドラーの設定、cronトリガーのテスト、WorkflowsやGreen Computeとの連携を構成できます。
webapp-testing
テストこのClaude Skillは、Playwrightベースのツールキットを提供し、Pythonスクリプトを通じてローカルWebアプリケーションのテストを可能にします。フロントエンドの検証、UIデバッグ、スクリーンショット撮影、ログ表示を実現し、サーバーライフサイクルを管理します。ブラウザ自動化タスクにご利用いただけますが、コンテキストの汚染を避けるため、スクリプトのソースコードを読むのではなく直接実行してください。
finishing-a-development-branch
テストこのスキルは、開発者がテストの合格を確認し、構造化された統合オプションを提示することで、完成した作業を仕上げることを支援します。実装が完了した後のマージ、PR作成、ブランチの整理といったワークフローを案内します。コードが準備できてテスト済みの際に使用し、開発プロセスを体系的に完了させましょう。