정보
콘텐츠 마이그레이션 스킬은 SEO, 사용자 북마크, 통합 기능을 보존하면서 콘텐츠를 플랫폼, 도메인 또는 URL 구조 간에 이동시키는 데 도움을 줍니다. 이 스킬은 CMS 마이그레이션, 사이트 통합, URL 재구성 프로젝트를 위해 설계되었습니다. 이 스택 독립적 도구는 깨진 링크를 방지하고 사이트 가치를 유지하기 위해 마이그레이션 계획 수립과 실행을 지원합니다.
빠른 설치
Claude Code
추천npx skills add rampstackco/claude-skills -a claude-code/plugin add https://github.com/rampstackco/claude-skillsgit clone https://github.com/rampstackco/claude-skills.git ~/.claude/skills/content-migrationClaude Code에서 이 명령을 복사하여 붙여넣어 스킬을 설치하세요
문서
Content Migration
Move content from one platform, domain, or URL structure to another without breaking SEO, user bookmarks, or downstream integrations. Stack-agnostic.
When to use
- Migrating from one CMS to another (e.g., WordPress to a headless setup)
- Consolidating multiple sites into one
- Splitting one site into multiple
- Changing URL structures
- Domain migration (one brand to another, mergers, rebrands)
- Migrating from a custom build to a platform (or vice versa)
- Content audit-driven cleanup as part of a larger move
When NOT to use
- A net-new site with no existing content (no migration needed)
- Single-page edits or content updates within an existing site (use
content-and-copy) - Performance or technical SEO improvements without URL changes (use
seo-technical) - Routine content audits (use
seo-content-audit)
Required inputs
- The source: current platform, current URL structure, current content inventory
- The destination: target platform, target URL structure, target capabilities
- The reason for migration (drives priority of what to preserve)
- Constraints (timeline, budget, downtime tolerance)
- Stakeholders (SEO, content, dev, comms, support)
The framework: 6 phases
Every content migration follows the same arc. Skipping a phase is how migrations go badly.
Phase 1: Inventory
You can't migrate what you don't know. Build a complete map of what exists.
For each piece of content:
- URL
- Title
- Content type (article, landing page, product, doc, etc.)
- Status (live, draft, archived, scheduled)
- Last modified
- Author or owner
- Traffic (last 12 months), or state the gap per the data-availability rule
- Backlinks (top external referrers)
- Internal links pointing to it
- Embedded assets (images, video, downloads)
Pull from: CMS export, XML sitemap, server logs, analytics, search console, backlink tool.
The inventory is a spreadsheet. It's the source of truth for the rest of the migration.
Phase 2: Audit and decide
For each piece of content, decide:
- Keep: migrate as-is
- Update: migrate with edits (refresh, expand, fix)
- Merge: combine with another piece, redirect both old URLs to the new
- Redirect: don't migrate; redirect to a related page
- Delete: don't migrate, no redirect (use sparingly; only for clearly low-value pages)
This is seo-content-audit work. The migration is the time to do it; not the time to skip it.
For each "Update" or "Merge," document the specific changes.
Phase 3: Map URLs
The URL map is the most important migration artifact.
| Old URL | New URL | Status code | Reason |
|---|---|---|---|
| /old/path | /new/path | 301 | Direct equivalent |
| /old/page-1, /old/page-2 | /new/merged | 301 | Merged content |
| /old/deprecated | /related/replacement | 301 | Closest replacement |
| /old/junk | (none) | 410 | Intentionally gone |
Rules:
- 301 (permanent redirect) for content that has a new home
- 410 (gone) for intentionally deleted content
- Avoid 404 (not found) where 410 is more accurate
- Never redirect everything to the homepage; specific is always better
- Map every URL with traffic or backlinks; lower-priority URLs can be patterned
For domain migrations, use a 1:1 path mapping by default (old.com/page → new.com/page) with specific overrides where structure changes.
Phase 4: Build and stage
Build the destination. Don't skip a staging environment.
- Set up the new platform with the new content
- Implement the URL map (most platforms support a redirect file or rule)
- Verify a representative sample of redirects work
- Test critical user flows (signup, purchase, contact)
- Validate analytics, monitoring, and integrations
- Test from search engine perspective: robots.txt, sitemap, canonicals
If possible, get the destination crawled by Google before the cutover, so it's already indexed when redirects flip.
Phase 5: Cut over
The actual switch. Plan it like a launch (and use launch-runbook alongside this skill).
Pre-cutover:
- Comms to stakeholders (date, expected impact)
- Comms to users if downtime expected
- Support team prepped for likely questions
- Lower DNS TTL the day before (1-3 days for safety)
- Backup of source platform (in case rollback is needed)
Cutover:
- Redirect rules go live
- DNS changes go live
- New sitemap submitted to search engines
- Old sitemap removed or updated
- Internal links audited and updated to point to new URLs (where possible)
- Status page or banner if user-visible disruption
Immediately post-cutover:
- Smoke test top 50 pages from the inventory
- Verify redirects are 301 (not 302)
- Verify search console for errors
- Watch real-time traffic for unexpected drops
- Watch error logs for missing assets, broken integrations
Phase 6: Monitor and recover
The migration isn't done at cutover. The next 30-90 days reveal problems.
Watch:
- Traffic: expect a temporary drop (10-30% is common); should recover in 4-8 weeks. A persistent drop beyond that is a problem.
- Indexing: new URLs should be crawled and indexed. Check coverage in search console.
- Rankings: track top keywords. A position drop is normal; a position cliff is a sign of a redirect or canonical problem.
- Backlinks: check that linked-from-elsewhere pages still resolve to the right destination.
- 404s: any URL getting 404s that should have been redirected? Add to the map.
- User reports: support tickets, social media. Are users finding their old links?
Common 30-day fixes:
- Add missed redirects from 404 patterns
- Update internal links you missed
- Re-submit sitemap if indexing stalls
- Investigate and fix any crawl errors
Workflow
Step 1: Set the scope
What's in scope? What's out? Write it down. Migrations expand if not bounded.
Step 2: Build the inventory
Pull every URL, traffic, backlinks, internal links. The spreadsheet is the artifact.
Step 3: Decide per piece
Keep, update, merge, redirect, delete. Document decisions.
Step 4: Map URLs
The complete redirect map. Reviewed by SEO and content stakeholders.
Step 5: Build the destination
In a staging environment. Real content (or representative content). Real redirects.
Step 6: Test
- Sample of redirects (top 20 by traffic, top 20 by backlinks, edge cases)
- Critical flows (signup, checkout, contact)
- Analytics and monitoring
- Search-engine perspective (robots.txt, sitemap, canonicals)
Step 7: Cut over
Following the cutover checklist. Have rollback ready.
Step 8: Monitor
Daily for the first week. Weekly for the first month. Monthly through 90 days.
Step 9: Document the result
What worked. What didn't. Lessons. (See after-action-report.)
Failure patterns
No URL inventory. Migration team thinks they have everything. They don't. Old PDFs, archived posts, marketing landing pages with backlinks. Build the inventory.
302 redirects instead of 301. 302 is temporary. SEO equity doesn't reliably pass. Use 301 unless you have a specific reason.
Redirecting everything to the homepage. "We'll let users find their way." They won't. They'll bounce. Map specifically.
Long redirect chains. /a → /b → /c → /d. Each hop loses a little equity and adds latency. Collapse to /a → /d.
Forgetting non-HTML URLs. PDFs, images, downloads. They have URLs too. They have backlinks too. Include in the map.
Forgetting query strings. /page?id=123 is a different URL than /page. Patterns or specific maps for query string variants.
Ignoring trailing slashes. /page and /page/ are different to most servers. Pick one canonical form. Redirect the other.
No staging. The first time the migration runs is in production. Things break. Stage and test.
Stage that's too different from production. Different DNS, different CDN, different platform. Tests pass on staging, fail on production. Stage as close to prod as feasible.
Leaving the source live. Two sites serving the same content. Duplicate content, split equity, user confusion. Take down the source after confirming the destination is solid.
Leaving the source domain unrenewed. Domain expires, redirects break, traffic dies. Renew the source domain for a long time, even if you're not using it.
Big-bang migration with no rollback plan. Something goes wrong. Now what? Plan rollback before cutover.
Cutover during a busy period. End of quarter, holiday season, big campaign. Bad timing. Pick a quiet period.
No comms. Users find their bookmarks broken with no warning. Some won't come back. Communicate.
Migration as a one-time event. It's not done at cutover. Monitor for 30-90 days. Fix what surfaces.
Treating migration as just a dev project. SEO, content, support, comms all need to be involved. Cross-functional from day one.
Output format
A migration plan document includes:
- Scope: what's in, what's out
- Inventory: the URL spreadsheet
- Audit decisions: keep, update, merge, redirect, delete
- URL map: old to new, with status codes
- Architecture: new platform setup, redirect implementation
- Cutover plan: the runbook for switch day
- Rollback plan: if it goes wrong
- Monitoring plan: what's watched, for how long
- Comms plan: internal and external
- Owners and timeline: who does what when
If required data is unavailable
This skill's output depends on data, measurements, or tool results it cannot generate on its own. When a required input, tool, or data source is unavailable or unverifiable, the sanctioned output is the deliverable with the gap stated: what was needed, what was actually obtained or verified, and which parts of the output are affected. Fabricating, estimating, or interpolating a required number to complete the deliverable is never sanctioned. A stated gap is a complete answer.
Reference files
references/migration-runbook.md: Step-by-step runbook for cutover day, including pre-flight checks, the actual switch, immediate verification, and the first 24 hours of monitoring.
GitHub 저장소
자주 묻는 질문
content-migration Skill이란 무엇인가요?
content-migration은(는) rampstackco이(가) 만든 Claude Skill입니다. Skill은 Claude가 필요할 때 불러오는 지침과 리소스를 묶어 추가 프롬프트 없이 content-migration 관련 작업을 수행할 수 있게 합니다.
content-migration은(는) 어떻게 설치하나요?
이 페이지의 설치 명령을 사용하세요. content-migration을(를) Claude Code 플러그인으로 추가하거나 저장소를 skills 디렉터리에 복제한 다음 Claude를 다시 시작해 Skill을 불러옵니다.
content-migration은(는) 어떤 카테고리에 속하나요?
content-migration은(는) 메타 카테고리에 속합니다.
content-migration은(는) 무료로 사용할 수 있나요?
네. content-migration은(는) AIMCP에 등록되어 있으며 무료로 설치할 수 있습니다.
연관 스킬
이 스킬은 콘텐츠 콜렉션(Content Collections)을 위한 프로덕션 검증된 설정을 제공합니다. 콘텐츠 콜렉션은 Markdown/MDX 파일을 Zod 검증이 포함된 타입 안전한 데이터 콜렉션으로 변환해주는 TypeScript 최우선 도구입니다. 블로그, 문서 사이트 또는 콘텐츠 중심의 Vite + React 애플리케이션을 구축할 때 타입 안전성과 자동 콘텐츠 검증을 보장하기 위해 사용하세요. Vite 플러그인 구성과 MDX 컴파일부터 배포 최적화 및 스키마 검증에 이르기까지 모든 것을 다룹니다.
이 스킬은 개발자들이 Polymarket 예측 시장 플랫폼을 활용한 애플리케이션을 구축할 수 있도록 지원하며, 거래 및 시장 데이터를 위한 API 통합 기능을 포함합니다. 또한 WebSocket을 통한 실시간 데이터 스트리밍을 제공하여 실시간 거래와 시장 활동을 모니터링할 수 있습니다. 이를 통해 거래 전략을 구현하거나 실시간 시장 업데이트를 처리하는 도구를 생성하는 데 활용할 수 있습니다.
이 스킬은 개발자들이 명령어, 파일, LSP 작업 등 25개 이상의 이벤트 유형에 연결되는 OpenCode 플러그인을 만들 수 있도록 돕습니다. JavaScript/TypeScript 모듈을 위한 플러그인 구조, 이벤트 API 명세, 구현 패턴을 제공합니다. OpenCode AI 어시스턴트의 라이프사이클을 사용자 정의 이벤트 기반 로직으로 가로채거나, 모니터링하거나, 확장해야 할 때 사용하세요.
SGLang은 RadixAttention 프리픽스 캐싱을 활용하여 JSON, 정규식, 에이전트 워크플로우를 위한 고속 구조화 생성에 특화된 고성능 LLM 서빙 프레임워크입니다. 특히 반복되는 프리픽스가 있는 작업에서 상당히 빠른 추론 속도를 제공하여 복잡한 구조화 출력 및 다중 턴 대화에 이상적입니다. 제약 디코딩이 필요하거나 광범위한 프리픽스 공유가 있는 애플리케이션을 구축할 때는 vLLM과 같은 대안보다 SGLang을 선택하십시오.
