Design Sprint Decide and Storyboard (Wednesday)
Wednesday is the most decision-heavy day of the Design Sprint. The skill runs the art museum layout (sketches posted anonymously on the wall), heat map (silent dot-vote stickers on promising parts), speed critique (3 minutes per sketch summarizing what the team sees), straw poll (each team member's top choice), and the Decider's supervote (the call that triggers the storyboard). Then the team decides whether to rumble (storyboard two sketches as competing prototypes) or all-in-one (storyboard one). The day ends with a 5-15 step storyboard that drives Thursday's build.
Family contract: docs/reference/skill-families/design-sprint-skills-contract.md. This skill is a member of design-sprint-skills.
When to Use
- It is Day 3 of the Design Sprint and Tuesday's sketches are collected, attribution-stripped, and uploaded to the shared workspace.
- The Decider is present for the full morning (heat map plus critique plus straw poll plus supervote happen 09:00-12:30 canonically).
- The team has accepted that the supervote is the Decider's call, not a consensus average.
- Thursday's prototype build needs a storyboard by Wednesday end-of-day or the build cannot start clean Thursday morning.
When NOT to Use
- Tuesday is not closed. Return to
tool-design-sprint-sketch; without independent sketches, the heat-map is meaningless. - Sketcher attribution leaked into Wednesday morning. The Facilitator must re-strip before the heat-map begins; voting on sketchers contaminates the day.
- The Decider is absent. Wednesday's supervote cannot be delegated; without the Decider, the day produces a recommendation, not a decision.
- The team is treating the supervote as advisory. The supervote is the call. Re-litigating it Thursday morning is sprint failure.
What This Skill Produces
A single bundled artifact with seven sections:
- Art museum layout: how sketches are arranged for viewing (typically wall or shared Figma board); attribution stripped; sketches labeled A / B / C / D / etc. in randomized order.
- Heat map: silent dot-vote stickers (typically 3 small dots per voter) placed on the most compelling PARTS of any sketch; voters can stack dots on the same element.
- Speed critique notes: 3-minute structured walkthrough per sketch by the Facilitator (or rotated team member) summarizing what the team sees; the sketcher does NOT explain their own sketch; concerns are captured as "what would worry me" notes.
- Straw poll results: each team member places one larger sticker (typically 1 large dot per voter) on the sketch they would pick if it were their call. Non-binding; informs the Decider.
- Supervote: the Decider places their supervote sticker (typically 3 large dots or a distinctively-colored sticker). The supervote is the decision. The Decider can place multiple supervotes on different sketches if running a rumble.
- Rumble vs all-in-one decision: the Decider chooses to storyboard one sketch (all-in-one; default) or two sketches as competing prototypes (rumble; chosen when the supervotes split clearly across two distinct approaches).
- Storyboard: 5-15 step storyboard derived from the supervoted sketch(es); each panel shows what the customer sees and what they do; specific enough that Thursday's build can begin without re-debating the design.
See references/TEMPLATE.md for the canonical structure and references/EXAMPLE.md for the Brainshelf book-catalog Wednesday artifact.
Wednesday Time Structure
The full Wednesday workshop is approximately 7 hours (09:00-12:30 + 13:30-17:00). The skill's bundled artifact emerges across the day:
- 09:00-09:15: Welcome + Tuesday recap + Wednesday agenda
- 09:15-09:30: Art museum setup; Facilitator confirms sketches are attribution-stripped and labeled A/B/C/D
- 09:30-09:45: Heat map (silent; 15 minutes; team places dot stickers on compelling parts)
- 09:45-10:45: Speed critique (3 min per sketch; sketchers silent during their own sketch's critique)
- 10:45-11:00: Break
- 11:00-11:15: Straw poll (silent; each person places 1 large dot on their pick)
- 11:15-11:30: Decider's supervote and rumble vs all-in-one call
- 11:30-12:30: Storyboard framing (which panels matter most; which map steps to cover; storyboard scope)
- 12:30-13:30: Lunch
- 13:30-16:30: Storyboard build (Facilitator drives; team contributes panel content; storyboard reaches 5-15 panels)
- 16:30-17:00: Day-end review; Thursday build kickoff prep (who builds, who supports, what tools, what gets prebuilt overnight)
This skill's 210-minute timebox covers the Facilitator-led portions (heat map setup, critique, straw poll, supervote, storyboard build).
Common Pitfalls
- Consensus drift instead of Decider supervote. The most common failure: the team votes, the Facilitator averages, and the Decider rubber-stamps the average. The Decider's call is the Decider's call; the straw poll is input, not result.
- Storyboard too vague. "User captures a book" is not a storyboard panel; "user opens camera surface, points at book held at arm's length, sees recognized cover appear in bottom card within 1.5 seconds, taps the card to commit" is. Vague storyboards force Thursday's builders to re-debate design.
- Skipping critique to save time. Critique surfaces concerns the storyboard must address. Skipping it produces a storyboard that hits Thursday and immediately re-surfaces every concern that should have been addressed Wednesday.
- Sketcher explaining their own sketch. During critique, the sketcher is silent. The point is to test whether the sketch communicates without the artist. If the team can't read the sketch, that's data, not a bug.
- Rumble chosen when all-in-one was right (or vice versa). Rumble is appropriate when 2 distinct supervoted approaches are both worth testing AND the team has Thursday capacity to build 2 prototypes. Default is all-in-one. Rumble is exception, not norm.
- Storyboard scope too broad. 5-15 panels, not 50. The storyboard covers the target moment (from Monday) plus 1-2 panels of setup and 1-2 panels of outcome; it does NOT cover the full product.
Cross-Skill Usage
Prerequisites: tool-design-sprint-sketch. Decide and Storyboard consumes Tuesday's sketches as input. Without independent sketches, this skill has no material to heat-map.
This skill invokes tool-note-and-vote twice during the morning: once for the heat-map (small-dot voting) and once for the straw poll (large-dot voting). The supervote itself is the Decider's call after seeing both vote distributions; it does NOT delegate to note-and-vote.
Next invocation in the sprint: tool-design-sprint-prototype-plan Thursday morning.
Canonical Sources
- Knapp, J., Zeratsky, J., and Kowitz, B. Sprint. Simon and Schuster, 2016. Wednesday chapter (Chapters 11-13).
- GV Design Sprint Guide. "Sprint Week Wednesday." https://www.gv.com/sprint/
- Character Capital. "Design Sprint Day 3." https://www.character.vc
- Google Design Sprint Kit. "Wednesday agenda template + storyboard worksheet." https://designsprintkit.withgoogle.com/
Decider Checkpoint
This skill ends with a Decider Checkpoint in references/TEMPLATE.md. The Decider's supervote earlier in the day is the substantive decision; the end-of-day checkpoint confirms the storyboard is build-ready (specific enough; covers the target moment plus setup plus outcome panels; no remaining hand-waving). Without sign-off, Thursday's build begins with ambiguity and Friday's test risks being a test of the wrong artifact.
GitHub 저장소
연관 스킬
content-collections
메타이 스킬은 콘텐츠 콜렉션(Content Collections)을 위한 프로덕션 검증된 설정을 제공합니다. 콘텐츠 콜렉션은 Markdown/MDX 파일을 Zod 검증이 포함된 타입 안전한 데이터 콜렉션으로 변환해주는 TypeScript 최우선 도구입니다. 블로그, 문서 사이트 또는 콘텐츠 중심의 Vite + React 애플리케이션을 구축할 때 타입 안전성과 자동 콘텐츠 검증을 보장하기 위해 사용하세요. Vite 플러그인 구성과 MDX 컴파일부터 배포 최적화 및 스키마 검증에 이르기까지 모든 것을 다룹니다.
polymarket
메타이 스킬은 개발자들이 Polymarket 예측 시장 플랫폼을 활용한 애플리케이션을 구축할 수 있도록 지원하며, 거래 및 시장 데이터를 위한 API 통합 기능을 포함합니다. 또한 WebSocket을 통한 실시간 데이터 스트리밍을 제공하여 실시간 거래와 시장 활동을 모니터링할 수 있습니다. 이를 통해 거래 전략을 구현하거나 실시간 시장 업데이트를 처리하는 도구를 생성하는 데 활용할 수 있습니다.
creating-opencode-plugins
메타이 스킬은 개발자들이 명령어, 파일, LSP 작업 등 25개 이상의 이벤트 유형에 연결되는 OpenCode 플러그인을 만들 수 있도록 돕습니다. JavaScript/TypeScript 모듈을 위한 플러그인 구조, 이벤트 API 명세, 구현 패턴을 제공합니다. OpenCode AI 어시스턴트의 라이프사이클을 사용자 정의 이벤트 기반 로직으로 가로채거나, 모니터링하거나, 확장해야 할 때 사용하세요.
sglang
메타SGLang은 RadixAttention 프리픽스 캐싱을 활용하여 JSON, 정규식, 에이전트 워크플로우를 위한 고속 구조화 생성에 특화된 고성능 LLM 서빙 프레임워크입니다. 특히 반복되는 프리픽스가 있는 작업에서 상당히 빠른 추론 속도를 제공하여 복잡한 구조화 출력 및 다중 턴 대화에 이상적입니다. 제약 디코딩이 필요하거나 광범위한 프리픽스 공유가 있는 애플리케이션을 구축할 때는 vLLM과 같은 대안보다 SGLang을 선택하십시오.