decommission-validated-system
정보
이 기술은 검증된 전산 시스템을 수명 주기 종료 시 폐기하는 과정을 개발자에게 안내합니다. 여기에는 규제 데이터 보존 평가, 검증된 데이터 이전, 아카이빙 전략, 접근 권한 해지, 이해관계자 알림 등이 포함됩니다. 시스템 교체, 플랫폼 통합, 공급업체 지원 중단, 규제적 폐기 대응 시 사용하십시오.
빠른 설치
Claude Code
추천npx skills add pjt222/agent-almanac -a claude-code/plugin add https://github.com/pjt222/agent-almanacgit clone https://github.com/pjt222/agent-almanac.git ~/.claude/skills/decommission-validated-systemClaude Code에서 이 명령을 복사하여 붙여넣어 스킬을 설치하세요
문서
name: decommission-validated-system description: > Dar de baja un sistema informatizado validado al final de su vida útil. Cubre la evaluación de la retención de datos según la regulación, la validación de la migración de datos (mapeo, transformación, conciliación), la estrategia de archivado, la revocación de acceso, el archivado de documentación y la notificación a las partes interesadas. Usar cuando un sistema validado está siendo reemplazado, cuando alcanza su fin de vida útil sin reemplazo, cuando el soporte del proveedor es discontinuado, cuando múltiples sistemas se consolidan, o cuando los cambios regulatorios hacen obsoleto un sistema. locale: es source_locale: en source_commit: 6f65f316 translator: claude-sonnet-4-6 translation_date: 2026-03-16 license: MIT allowed-tools: Read Write Edit Bash Grep Glob metadata: author: Philipp Thoss version: "1.0" domain: compliance complexity: intermediate language: multi tags: gxp, decommission, data-retention, migration, archival, compliance
Dar de Baja un Sistema Validado
Planificar y ejecutar el retiro controlado de un sistema informatizado validado preservando la integridad de los datos y cumpliendo los requisitos regulatorios de retención.
Cuándo Usar
- Un sistema validado está siendo reemplazado por un nuevo sistema
- Un sistema alcanza su fin de vida útil sin reemplazo (proceso de negocio eliminado)
- El proveedor discontinúa el soporte de un producto validado
- Consolidación de múltiples sistemas en una única plataforma
- Los cambios regulatorios o de negocio hacen obsoleto un sistema
Entradas
- Requerido: Sistema a dar de baja (nombre, versión, estado de validación)
- Requerido: Requisitos de retención de datos según la regulación (21 CFR Parte 11, GLP, GCP)
- Requerido: Sistema de reemplazo (si aplica) y alcance de la migración
- Opcional: Paquete actual de documentación de validación
- Opcional: Inventario de volumen y formato de datos
- Opcional: Propietario del negocio y lista de partes interesadas
Procedimiento
Paso 1: Evaluar los Requisitos de Retención de Datos
Determinar cuánto tiempo deben retenerse los datos y en qué forma:
# Data Retention Assessment
## Document ID: DRA-[SYS]-[YYYY]-[NNN]
### Regulatory Retention Requirements
| Regulation | Data Type | Retention Period | Format Requirements |
|-----------|-----------|-----------------|-------------------|
| 21 CFR 211 (GMP) | Batch records, test results | 1 year past product expiry or 3 years after distribution | Readable, retrievable |
| 21 CFR 58 (GLP) | Study data and records | Duration of study + retention agreement | Original or certified copy |
| ICH E6 (GCP) | Clinical trial records | 2 years after last marketing approval or formal discontinuation | Accessible for inspection |
| 21 CFR Part 11 | Electronic records | Per predicate rule | Original format or validated migration |
| EU Annex 11 | Computerized system records | Per applicable GxP | Readable and available |
| Tax/financial | Financial records | 7-10 years (jurisdiction-dependent) | Readable |
### System Data Inventory
| Data Category | Volume | Format | Retention Required Until | Disposition |
|---------------|--------|--------|------------------------|-------------|
| [e.g., Batch records] | [e.g., 50,000 records] | [e.g., Database + PDF reports] | [Date] | Migrate / Archive / Destroy |
| [e.g., Audit trail] | [e.g., 2M entries] | [e.g., Database] | [Same as parent records] | Archive |
| [e.g., User data] | [e.g., 200 profiles] | [e.g., LDAP/Database] | [Employment + 2 years] | Anonymise and archive |
Esperado: Cada categoría de datos tiene un período de retención definido, un requisito de formato y una disposición planificada. En caso de fallo: Si los requisitos de retención no están claros, consultar a asuntos regulatorios y asesoría legal. Por defecto, usar el período de retención aplicable más largo.
Paso 2: Planificar la Migración de Datos (Si Aplica)
Si los datos se migran a un sistema de reemplazo:
# Data Migration Plan
## Document ID: DMP-[SYS]-[YYYY]-[NNN]
### Migration Scope
| Source | Target | Data Category | Records | Migration Method |
|--------|--------|---------------|---------|-----------------|
| [Old system] | [New system] | [Category] | [Count] | ETL / Manual / API |
### Data Mapping
| Source Field | Source Format | Target Field | Target Format | Transformation |
|-------------|-------------|-------------|---------------|---------------|
| [e.g., test_result] | FLOAT(8,2) | [e.g., result_value] | DECIMAL(10,3) | Precision conversion |
| [e.g., operator_id] | VARCHAR(20) | [e.g., user_id] | UUID | Lookup table mapping |
### Validation Approach
| Check | Method | Acceptance Criteria |
|-------|--------|-------------------|
| Record count reconciliation | Source count vs target count | 100% match |
| Field-level comparison | Sample 5% of records, all fields | 100% match after transformation |
| Checksum verification | Hash source vs target for key fields | Checksums match |
| Business rule validation | Verify key calculations in target | Results match source |
| Audit trail continuity | Verify historical audit trail migrated | All entries present with original timestamps |
Esperado: El plan de migración incluye mapeo, reglas de transformación y verificaciones de validación que demuestran que se mantuvo la integridad de los datos. En caso de fallo: Si la validación de la migración falla, no proceder a dar de baja el sistema. Corregir los problemas de migración y revalidar.
Paso 3: Definir la Estrategia de Archivado
Para los datos que se archivarán en lugar de migrarse:
# Archival Strategy
### Archive Format
| Consideration | Decision | Rationale |
|--------------|----------|-----------|
| Format | [PDF/A, CSV, XML, database backup] | [Why this format survives the retention period] |
| Medium | [Network storage, cloud archive, tape, optical] | [Durability and accessibility] |
| Encryption | [Yes/No — method if yes] | [Security vs long-term accessibility trade-off] |
| Integrity verification | [SHA-256 checksums, periodic verification schedule] | [Prove archive is uncorrupted] |
### Archive Verification
- [ ] Archived data is readable without the source system
- [ ] All required data categories are included in the archive
- [ ] Checksums recorded at time of archival
- [ ] Archive can be searched and retrieved within [defined SLA, e.g., 5 business days]
- [ ] Periodic integrity checks scheduled (annually)
### Archive Access
| Role | Access Level | Authorisation |
|------|-------------|--------------|
| QA Director | Read access to all archived data | Standing authorisation |
| Regulatory Affairs | Read access for inspection support | Standing authorisation |
| System Owner (former) | Read access for business queries | Request-based |
| External auditors | Read access, supervised | Per audit plan |
Esperado: Los datos archivados son legibles, consultables y verificables sin el sistema original. En caso de fallo: Si los datos no pueden leerse independientemente del sistema fuente, el archivo no es conforme. Considerar exportar a un formato estándar abierto (PDF/A, CSV) antes de dar de baja el sistema.
Paso 4: Ejecutar la Baja del Sistema
# Decommission Checklist
## Document ID: DC-[SYS]-[YYYY]-[NNN]
### Pre-Decommission
- [ ] All stakeholders notified of decommission date and data disposition
- [ ] Data migration completed and validated (if applicable)
- [ ] Data archive created and verified (if applicable)
- [ ] Final backup of complete system taken and stored separately
- [ ] All open change requests resolved or transferred
- [ ] All open CAPAs resolved or transferred to successor system
- [ ] All active users informed and redirected to replacement system (if applicable)
### Decommission Execution
- [ ] User access revoked for all accounts
- [ ] System removed from production environment
- [ ] Network connections disconnected
- [ ] Licenses returned or terminated
- [ ] System entry removed from active system inventory
- [ ] System moved to "Decommissioned" status in compliance architecture
### Post-Decommission
- [ ] Validation documentation archived (URS, VP, IQ/OQ/PQ, TM, VSR)
- [ ] SOPs retired or updated to remove references to decommissioned system
- [ ] Training records archived
- [ ] Change control records archived
- [ ] Audit trail archived
- [ ] Decommission report completed and approved
### Decommission Report
| Section | Content |
|---------|---------|
| System description | Name, version, purpose, GxP classification |
| Decommission rationale | Why the system is being retired |
| Data disposition summary | What data went where (migrated, archived, destroyed) |
| Validation evidence | Migration validation results, archive verification |
| Residual risk | Any ongoing data retention obligations |
| Approval | System owner, QA, IT signatures |
Esperado: La baja del sistema es controlada, documentada y aprobada — no simplemente "apagarlo". En caso de fallo: Si algún elemento de la lista de verificación no puede completarse, documentar la excepción y obtener la aprobación de Aseguramiento de Calidad antes de proceder.
Validación
- Requisitos de retención de datos evaluados para todas las categorías de datos
- Migración de datos validada con conteos de registros, muestreo y sumas de verificación (si aplica)
- Archivo creado en un formato legible sin el sistema fuente
- Integridad del archivo verificada con sumas de verificación
- Todo el acceso de usuarios revocado
- Documentación de validación archivada con período de retención definido
- SOPs actualizados para eliminar referencias al sistema dado de baja
- Informe de baja del sistema aprobado por el propietario del sistema, Aseguramiento de Calidad y TI
Errores Comunes
- Baja prematura: Apagar un sistema antes de que la migración de datos esté validada arriesga la pérdida permanente de datos. Completar toda la validación antes de apagar el sistema.
- Archivos ilegibles: Almacenar datos en un formato propietario que requiere el sistema original para leerlos derrota el propósito del archivado. Usar formatos abiertos.
- Registro de auditoría olvidado: Archivar los datos pero no el registro de auditoría significa que la procedencia de los datos no puede demostrarse. Siempre archivar los registros de auditoría junto con sus registros padre.
- SOPs huérfanos: Los SOPs que aún hacen referencia a un sistema dado de baja confunden a los usuarios y crean brechas de cumplimiento. Actualizar o retirar todos los SOPs afectados.
- Sin verificación periódica del archivo: Los archivos se degradan. Sin verificaciones periódicas de integridad, la pérdida de datos puede pasar desapercibida hasta que los datos sean necesarios para una inspección.
Habilidades Relacionadas
design-compliance-architecture— actualizar el inventario de sistemas y la arquitectura de cumplimiento tras la bajamanage-change-control— dar de baja un sistema es un cambio importante que requiere control de cambioswrite-validation-documentation— la validación de la migración sigue la misma metodología IQ/OQwrite-standard-operating-procedure— retirar o actualizar los SOPs que hacen referencia al sistema dado de bajaprepare-inspection-readiness— los datos archivados deben permanecer accesibles para inspecciones regulatorias
GitHub 저장소
연관 스킬
executing-plans
디자인executing-plans 스킬은 검토 체크포인트가 포함된 통제된 배치로 실행할 완전한 구현 계획이 있을 때 사용합니다. 이 스킬은 계획을 불러와 비판적으로 검토한 후, 소규모 배치(기본값 3개 작업)로 작업을 실행하면서 각 배치 사이에 진행 상황을 아키텍트 검토를 위해 보고합니다. 이를 통해 내재된 품질 관리 체크포인트를 갖춘 체계적인 구현이 보장됩니다.
requesting-code-review
디자인이 스킬은 코드 변경 사항을 요구 사항에 따라 분석하기 위해 코드 리뷰어 하위 에이전트를 호출합니다. 작업 완료 후, 주요 기능 구현 후, 또는 메인 브랜치에 병합하기 전에 사용해야 합니다. 이 리뷰는 현재 구현체와 원래 계획을 비교하여 문제를 조기에 발견하는 데 도움이 됩니다.
connect-mcp-server
디자인이 스킬은 개발자들이 HTTP, stdio 또는 SSE 전송 방식을 통해 MCP 서버를 Claude Code에 연결하는 포괄적인 가이드를 제공합니다. GitHub, Notion 및 사용자 정의 API와 같은 외부 서비스를 통합하기 위한 설치, 구성, 인증 및 보안을 다룹니다. MCP 통합 설정, 외부 도구 구성 또는 Claude의 모델 컨텍스트 프로토콜 작업 시 활용하세요.
web-cli-teleport
디자인이 스킬은 작업 분석을 기반으로 개발자가 Claude Code 웹 인터페이스와 CLI 인터페이스 중 선택할 수 있도록 돕고, 두 환경 간 원활한 세션 텔레포트를 가능하게 합니다. 웹, CLI 또는 모바일 환경 전환 시 세션 상태와 컨텍스트를 관리하여 워크플로를 최적화합니다. 다양한 단계에서 서로 다른 도구가 필요한 복잡한 프로젝트에 사용하세요.
