SKILL·1C9230

launch-runbook

rampstackco
更新于 7 days ago
2 次查看
910
126
910
在 GitHub 上查看
元design

关于

This skill helps developers create and execute a structured launch runbook for website or product deployments. It coordinates the entire go-live process, including pre-launch checks, DNS cutover, live procedures, monitoring, and rollback plans. Use it when planning any major production launch, cutover, or deployment day checklist.

快速安装

Claude Code

推荐
主要方式
npx skills add rampstackco/claude-skills -a claude-code
插件命令备选方式
/plugin add https://github.com/rampstackco/claude-skills
Git 克隆备选方式
git clone https://github.com/rampstackco/claude-skills.git ~/.claude/skills/launch-runbook

在 Claude Code 中复制并粘贴此命令以安装该技能

技能文档

Launch Runbook

Plan and execute the launch of a website, product, or major release. The runbook is the document everyone uses on launch day. Stack-agnostic.

This skill is for the launch event. For pre-launch QA, use qa-testing. For post-launch incident handling, use incident-response.


When to use

  • Launching a new website or major redesign
  • Migrating from one platform to another
  • Releasing a major product or feature
  • Coordinating cross-team launches
  • Building a runbook for a recurring deploy

When NOT to use

  • Pre-launch testing (use qa-testing)
  • Post-launch incident response (use incident-response)
  • After-launch retrospective (use after-action-report)

Required inputs

  • The launch scope (what's being launched)
  • The launch window (date, time, duration)
  • The team (roles, on-call rotation)
  • The rollback criteria (when to abort)
  • The communication plan (who tells whom what, when)

The framework: 4 phases

A launch has four phases. The runbook covers all four.

Phase 1: Pre-launch (T-30 days to T-1 hour)

Verify everything is ready before the launch window.

T-30 days:

  • Final scope locked
  • Cross-team commitments confirmed
  • Pre-launch QA scheduled
  • Comms plan drafted

T-7 days:

  • Pre-launch QA complete
  • All critical and major issues resolved
  • Performance baseline measured
  • Rollback procedures documented and tested
  • DNS TTL lowered (if DNS change is part of launch)

T-1 day:

  • Final go/no-go meeting
  • Roles confirmed
  • Communication channels set up
  • Backup of current production state

T-1 hour:

  • Team assembled in shared communication channel
  • Tools and access verified
  • Final smoke test on staging

Phase 2: Cutover (T-0)

The actual launch. Sequenced steps with owners and verifications.

Standard cutover steps:

  1. Announce start to internal team
  2. Enable maintenance mode (if applicable)
  3. Run final database migrations (if applicable)
  4. Deploy code to production
  5. Verify deploy completed without errors
  6. Run smoke tests on production
  7. DNS cutover (if applicable)
  8. Verify DNS propagation
  9. Disable maintenance mode
  10. Run full smoke tests on production
  11. Announce launch to internal team
  12. Begin monitoring window

Each step has:

  • Owner
  • Pre-conditions
  • Action
  • Verification
  • Time estimate
  • Rollback procedure

Phase 3: Verification (T+0 to T+24 hours)

Confirm the launch is healthy.

Within first hour:

  • Critical user flows working (checkout, signup, login)
  • No spike in error rates
  • Performance within expected ranges
  • Analytics tracking firing
  • Email and notifications working

Within first 24 hours:

  • No regression in key business metrics
  • No accumulating error patterns
  • Core Web Vitals stable
  • Search Console showing no critical issues (if SEO-relevant)

Phase 4: Stabilization (T+24 hours to T+7 days)

Monitor the long tail.

  • Track error rates day over day
  • Track performance day over day
  • Track key business metrics vs baseline
  • Address any non-blocking issues identified
  • Plan the AAR (after-action report)

Roles and responsibilities

A launch has clear role assignments. Ambiguity here is the most common cause of launch chaos.

RoleResponsibility
Launch leadOwns the runbook. Calls go/no-go. Calls rollback.
Deploy operatorExecutes the technical deploy steps.
QA leadRuns verification tests and confirms each milestone.
Comms leadPosts internal updates, manages external messaging.
On-call engineerAvailable for issues during and after launch.
Stakeholder repApproves on behalf of business stakeholders.

For small teams, one person may fill multiple roles. Each role's responsibilities should still be explicit.


Rollback criteria

Define before the launch. Decisions are easier to make pre-emptively than under pressure.

Automatic rollback triggers:

  • Error rate exceeds X percent of normal
  • Critical user flow (defined) is broken
  • Database integrity issue
  • Security vulnerability discovered post-deploy

Discretionary rollback triggers:

  • Performance degradation beyond Y percent
  • Significant degradation in key business metric
  • Customer-facing error patterns

Decision authority: The launch lead calls rollback. Pre-define who acts as deputy if launch lead is unavailable.


Communication plan

Internal channels

  • Primary launch channel: Real-time chat for the launch team only
  • Status channel: Broader internal updates
  • War room: Optional video call for high-stakes launches

Update cadence during launch

  • Every 15 minutes during cutover
  • Every hour during verification phase
  • Daily during stabilization phase

External communication

  • Customer-facing announcement: Pre-drafted, scheduled to publish at confirmed-success milestone
  • Status page: Updated proactively if any user impact
  • Support team: Briefed in advance on what's launching, common questions, escalation path

Workflow

  1. Build the runbook 30 days out. Scope, sequence, roles, rollback criteria, comms plan.
  2. Test the rollback procedure. Untested rollback is hope, not procedure.
  3. Run a tabletop exercise. Walk through the runbook with the full team. Find gaps.
  4. Lower DNS TTL 48 to 72 hours before launch (if DNS change is part of launch).
  5. Day-of: Run the runbook step by step. Verify each step before moving to next.
  6. Monitor. First hour, first day, first week. Document anything noteworthy.
  7. Schedule the AAR within 1 to 2 weeks of launch.

Failure patterns

  • Runbook written by one person, not reviewed. Single perspective misses scenarios.
  • No tested rollback. Discovering rollback is broken at the moment you need it.
  • Vague step descriptions. "Deploy to production" without specifying which tool, which command, which environment.
  • No verification step after each action. Errors propagate.
  • Communication gaps. Team doesn't know launch is happening, or doesn't know it succeeded.
  • Launching at end of day Friday. Or before a holiday. Reduce the time available to respond.
  • Skipping pre-launch QA to hit a date. The bugs appear on launch day instead.
  • Launch fatigue. Long launches without breaks lead to errors. Plan rest cycles for multi-day launches.
  • No on-call for first 24 hours. Someone must be reachable.

Output format

Default output: a markdown runbook at launch-runbook-[project].md plus supporting checklists.

Structure:

  1. Launch metadata (what, when, who)
  2. Roles and responsibilities
  3. Pre-launch checklist (T-30, T-7, T-1, T-1hr)
  4. Cutover sequence (numbered steps, owners, verifications)
  5. Rollback procedure
  6. Rollback criteria (automatic and discretionary)
  7. Communication plan
  8. Verification checklist (first hour, first day)
  9. Stabilization plan (first week)
  10. Contacts (escalation paths, on-call)

Reference files

GitHub 仓库

rampstackco/claude-skills
路径: dist/codex/.agents/skills/launch-runbook
0
agent-skillsai-agentsanthropicclaudeclaude-aiclaude-code
FAQ

常见问题

什么是 launch-runbook Skill?

launch-runbook 是一个 Claude Skill,作者为 rampstackco。Skill 将 Claude 按需加载的说明和资源打包,让 Claude 无需额外提示即可执行与 launch-runbook 相关的任务。

如何安装 launch-runbook?

使用本页的安装命令:将 launch-runbook 作为插件添加到 Claude Code,或将其仓库克隆到 skills 目录,然后重启 Claude 以加载该 Skill。

launch-runbook 属于哪个分类?

launch-runbook 属于元分类。

launch-runbook 可以免费使用吗?

可以。launch-runbook 已收录在 AIMCP,可免费安装。

相关推荐技能

content-collections
元

Content Collections 是一个 TypeScript 优先的构建工具,可将本地 Markdown/MDX 文件转换为类型安全的数据集合。它专为构建博客、文档站和内容密集型 Vite+React 应用而设计,提供基于 Zod 的自动模式验证。该工具涵盖从 Vite 插件配置、MDX 编译到生产环境部署的完整工作流。

查看技能
polymarket
元

这个Claude Skill为开发者提供完整的Polymarket预测市场开发支持,涵盖API调用、交易执行和市场数据分析。关键特性包括实时WebSocket数据流,可监控实时交易、订单和市场动态。开发者可用它构建预测市场应用、实施交易策略并集成实时市场预测功能。

查看技能
creating-opencode-plugins
元

该Skill帮助开发者创建OpenCode插件,用于接入命令、文件、LSP等25+种事件。它提供了插件结构、事件API规范和JavaScript/TypeScript实现模式,适合需要拦截操作、扩展功能或自定义事件处理的场景。开发者可通过它快速构建响应式模块来增强OpenCode AI助手的能力。

查看技能
sglang
元

SGLang是一个专为LLM设计的高性能推理框架,特别适用于需要结构化输出的场景。它通过RadixAttention前缀缓存技术,在处理JSON、正则表达式、工具调用等具有重复前缀的复杂工作流时,能实现极速生成。如果你正在构建智能体或多轮对话系统,并追求远超vLLM的推理性能,SGLang是理想选择。

查看技能