关于

This Claude Skill facilitates structured project or sprint retrospectives by analyzing status reports and metrics to identify successes and areas for improvement. It generates actionable follow-up items with assigned owners and due dates. Developers should use it after sprints, milestones, or significant events to systematically capture lessons learned.

快速安装

Claude Code

推荐
主要方式
npx skills add pjt222/agent-almanac -a claude-code
插件命令备选方式
/plugin add https://github.com/pjt222/agent-almanac
Git 克隆备选方式
git clone https://github.com/pjt222/agent-almanac.git ~/.claude/skills/conduct-retrospective

在 Claude Code 中复制并粘贴此命令以安装该技能

技能文档

Conduct a Retrospective

Facilitate a structured retrospective that reviews recent project execution, identifies what worked and what didn't, and produces actionable improvement items that feed back into project processes. This skill transforms raw project data into evidence-backed learnings with specific actions, owners, and due dates.

When to Use

  • End of a sprint (sprint retrospective)
  • End of a project phase or milestone
  • After a significant incident, failure, or success
  • Quarterly review of ongoing project processes
  • Before starting a similar project (lessons learned review)

Inputs

  • Required: Period under review (sprint number, date range, or milestone)
  • Optional: Status reports from the review period
  • Optional: Sprint velocity and completion data
  • Optional: Previous retrospective actions (to check closure)
  • Optional: Team feedback or survey results

Procedure

Step 1: Gather Retrospective Data

Read available artifacts from the review period:

  • STATUS-REPORT-*.md files for the period
  • SPRINT-PLAN.md for planned vs actual
  • BACKLOG.md for item flow and cycle times
  • Previous RETRO-*.md for open action items

Extract key facts:

  • Items planned vs completed
  • Velocity trend
  • Blockers encountered and resolution time
  • Unplanned work that entered the sprint
  • Open action items from previous retrospectives

Got: Data summary with quantitative metrics (velocity, completion %, blocker count).

If fail: If no artifacts exist, base the retrospective on qualitative observations.

Step 2: Structure "What Went Well"

List 3-5 things that worked well, with evidence:

## What Went Well
| # | Observation | Evidence |
|---|------------|---------|
| 1 | [Specific positive observation] | [Metric, example, or artifact reference] |
| 2 | [Specific positive observation] | [Metric, example, or artifact reference] |
| 3 | [Specific positive observation] | [Metric, example, or artifact reference] |

Focus on practices to continue, not only outcomes. "Daily standups kept blockers visible" is more actionable than "We delivered on time."

Got: 3-5 evidence-backed positive observations.

If fail: If nothing went well, look harder — even small wins matter. At minimum, the team completed the period.

Step 3: Structure "What Needs Improvement"

List 3-5 things that need improvement, with evidence:

## What Needs Improvement
| # | Observation | Evidence | Impact |
|---|------------|---------|--------|
| 1 | [Specific issue] | [Metric, example, or incident] | [Effect on delivery] |
| 2 | [Specific issue] | [Metric, example, or incident] | [Effect on delivery] |
| 3 | [Specific issue] | [Metric, example, or incident] | [Effect on delivery] |

Be specific and factual. "Estimation was off" is vague. "3 of 5 items exceeded estimates by >50%, adding 8 unplanned days" is actionable.

Got: 3-5 evidence-backed improvement areas with stated impact.

If fail: If the team claims everything is fine, compare planned vs actual metrics — gaps reveal issues.

Step 4: Generate Improvement Actions

For each improvement area, create an actionable item:

## Improvement Actions
| ID | Action | Owner | Due Date | Success Criteria | Source |
|----|--------|-------|----------|-----------------|--------|
| A-001 | [Specific action] | [Name] | [Date] | [How to verify success] | Improvement #1 |
| A-002 | [Specific action] | [Name] | [Date] | [How to verify success] | Improvement #2 |
| A-003 | [Specific action] | [Name] | [Date] | [How to verify success] | Improvement #3 |

Each action must be:

  • Specific (not "improve estimation" but "add estimation review step to grooming")
  • Owned (one person accountable)
  • Time-bound (due date within next 1-2 sprints)
  • Verifiable (success criteria defined)

Got: 2-4 improvement actions with owners and due dates.

If fail: If actions are too vague, apply the "how would you verify this was done?" test.

Step 5: Review Previous Actions and Write Report

Check previous retrospective actions for closure:

## Previous Action Review
| ID | Action | Owner | Status | Notes |
|----|--------|-------|--------|-------|
| A-prev-001 | [Action from last retro] | [Name] | Closed / Open / Recurring | [Outcome] |
| A-prev-002 | [Action from last retro] | [Name] | Closed / Open / Recurring | [Outcome] |

Flag recurring items (same issue appearing in 3+ retrospectives) — these need escalation or a different approach.

Write the complete retrospective:

# Retrospective: [Sprint N / Phase Name / Date Range]
## Date: [YYYY-MM-DD]
## Document ID: RETRO-[PROJECT]-[YYYY-MM-DD]

### Period Summary
- **Period**: [Sprint N / dates]
- **Planned**: [N items / N points]
- **Completed**: [N items / N points]
- **Velocity**: [N] (previous: [N])
- **Unplanned Work**: [N items]

### What Went Well
[From Step 2]

### What Needs Improvement
[From Step 3]

### Improvement Actions
[From Step 4]

### Previous Action Review
[From Step 5]

---
*Retrospective facilitated by: [Name/Agent]*

Save as RETRO-[YYYY-MM-DD].md.

Got: Complete retrospective document saved with actions, evidence, and previous action review.

If fail: If the retrospective has no improvement actions, it's not driving change — revisit Step 3.

Validation

  • Retrospective file created with date-stamped filename
  • Period summary includes quantitative metrics
  • "What Went Well" has 3-5 evidence-backed items
  • "What Needs Improvement" has 3-5 evidence-backed items
  • Improvement actions have owners, due dates, and success criteria
  • Previous retrospective actions reviewed for closure
  • Recurring issues flagged

Pitfalls

  • Blame game: Retrospectives review processes and practices, not people. Frame issues as systemic, not personal.
  • Actions without follow-through: The biggest retrospective failure. Always review previous actions before creating new ones.
  • Too many actions: 2-4 focused actions are better than 10 vague ones. The team can only absorb so many changes.
  • No evidence: "We feel estimation is bad" is opinion. "3 of 5 items exceeded estimates by 50%" is data. Always attach evidence.
  • Skipping the positives: Only discussing problems is demoralizing. Celebrating wins reinforces good practices.

Related Skills

  • generate-status-report — status reports provide the data for retrospectives
  • manage-backlog — improvement actions feed back into the backlog
  • plan-sprint — retrospective learnings improve sprint planning accuracy
  • draft-project-charter — review charter assumptions and risk accuracy
  • create-work-breakdown-structure — review estimation accuracy against WBS

GitHub 仓库

pjt222/agent-almanac
路径: i18n/caveman-lite/skills/conduct-retrospective
0
agentsagentskillsai-assisted-developmentclaude-codeskillsteams

相关推荐技能

content-collections

Content Collections 是一个 TypeScript 优先的构建工具,可将本地 Markdown/MDX 文件转换为类型安全的数据集合。它专为构建博客、文档站和内容密集型 Vite+React 应用而设计,提供基于 Zod 的自动模式验证。该工具涵盖从 Vite 插件配置、MDX 编译到生产环境部署的完整工作流。

查看技能

polymarket

这个Claude Skill为开发者提供完整的Polymarket预测市场开发支持,涵盖API调用、交易执行和市场数据分析。关键特性包括实时WebSocket数据流,可监控实时交易、订单和市场动态。开发者可用它构建预测市场应用、实施交易策略并集成实时市场预测功能。

查看技能

creating-opencode-plugins

该Skill帮助开发者创建OpenCode插件,用于接入命令、文件、LSP等25+种事件。它提供了插件结构、事件API规范和JavaScript/TypeScript实现模式,适合需要拦截操作、扩展功能或自定义事件处理的场景。开发者可通过它快速构建响应式模块来增强OpenCode AI助手的能力。

查看技能

sglang

SGLang是一个专为LLM设计的高性能推理框架,特别适用于需要结构化输出的场景。它通过RadixAttention前缀缓存技术,在处理JSON、正则表达式、工具调用等具有重复前缀的复杂工作流时,能实现极速生成。如果你正在构建智能体或多轮对话系统,并追求远超vLLM的推理性能,SGLang是理想选择。

查看技能