返回技能列表

manage-backlog

pjt222
更新于 2 days ago
7 次查看
17
2
17
在 GitHub 上查看
ai

关于

This Claude Skill helps developers create and maintain a prioritized product backlog, handling user story writing, MoSCoW prioritization, and backlog grooming. It's designed for converting project scope into actionable items, re-prioritizing after feedback, and splitting oversized work into implementable pieces. Use it when starting a project or during ongoing grooming before sprint planning.

快速安装

Claude Code

推荐
主要方式
npx skills add pjt222/agent-almanac -a claude-code
插件命令备选方式
/plugin add https://github.com/pjt222/agent-almanac
Git 克隆备选方式
git clone https://github.com/pjt222/agent-almanac.git ~/.claude/skills/manage-backlog

在 Claude Code 中复制并粘贴此命令以安装该技能

技能文档

Manage a Product Backlog

Create, prioritize, and maintain a backlog of work items that serves as the single source of truth for what needs to be done, applicable to both agile and classic project methodologies.

When to Use

  • Starting a new project and converting scope into actionable items
  • Ongoing backlog grooming before sprint planning
  • Re-prioritizing work after stakeholder feedback or scope changes
  • Splitting oversized items into implementable pieces
  • Reviewing and archiving completed or cancelled items

Inputs

  • Required: Project scope (from charter, WBS, or stakeholder input)
  • Optional: Existing backlog file (BACKLOG.md) to update
  • Optional: Prioritization framework preference (MoSCoW, value/effort, WSJF)
  • Optional: Estimation scale (story points, T-shirt sizes, person-days)
  • Optional: Sprint or iteration feedback requiring backlog updates

Procedure

Step 1: Create or Load Backlog Structure

If no backlog exists, create BACKLOG.md with standard columns. If one exists, read and validate structure.

# Product Backlog: [Project Name]
## Last Updated: [YYYY-MM-DD]

### Summary
- **Total Items**: [N]
- **Ready for Sprint**: [N]
- **In Progress**: [N]
- **Done**: [N]
- **Cancelled**: [N]

### Backlog Items
| ID | Title | Type | Priority | Estimate | Status | Sprint |
|----|-------|------|----------|----------|--------|--------|
| B-001 | [Title] | Feature | Must | 5 | Ready | — |
| B-002 | [Title] | Bug | Should | 2 | Ready | — |
| B-003 | [Title] | Task | Could | 3 | New | — |

### Item Details

#### B-001: [Title]
- **Type**: Feature | Bug | Task | Spike | Tech Debt
- **Priority**: Must | Should | Could | Won't
- **Estimate**: [Points or size]
- **Status**: New | Ready | In Progress | Done | Cancelled
- **Acceptance Criteria**:
  - [ ] [Criterion 1]
  - [ ] [Criterion 2]
- **Notes**: [Context, links, dependencies]

#### B-002: [Title]
...

Got: BACKLOG.md exists with valid structure and summary statistics.

If fail: If the file is malformed, restructure it preserving existing item data.

Step 2: Write or Refine Items

For each new item, write it as a user story or requirement:

  • User story format: "As a [role], I want [capability] so that [benefit]"
  • Requirement format: "[System/Component] shall [behavior] when [condition]"

Each item must have:

  • Unique ID (B-NNN, incrementing)
  • Clear title (imperative verb form)
  • Type classification
  • At least 2 acceptance criteria (testable, binary pass/fail)

Example:

#### B-005: Enable User Login with OAuth
- **Type**: Feature
- **Priority**: Must
- **Estimate**: 5
- **Status**: Ready
- **Acceptance Criteria**:
  - [ ] User can log in using GitHub OAuth
  - [ ] User session persists for 24 hours
  - [ ] Failed login shows clear error message
- **Notes**: Requires OAuth app registration in GitHub

Got: All items have titles, types, and acceptance criteria.

If fail: Items without acceptance criteria are marked Status: New (not Ready). They cannot enter a sprint.

Step 3: Prioritize Using MoSCoW or Value/Effort

Apply the chosen prioritization framework:

MoSCoW (default):

  • Must: Project fails without this. Non-negotiable.
  • Should: Important but project can succeed without it. Include if capacity allows.
  • Could: Nice to have. Include only if no impact on Must/Should items.
  • Won't: Explicitly excluded from current scope. Documented for future consideration.

Value/Effort Matrix (alternative):

Low EffortHigh Effort
High ValueDo First (Quick Wins)Do Second (Big Bets)
Low ValueDo Third (Fill-ins)Don't Do (Money Pits)

Sort the backlog table: Must items first (by value within Must), then Should, then Could.

Got: Every item has a priority. Backlog is sorted by priority.

If fail: If stakeholders disagree on priorities, escalate Must vs Should decisions to the project sponsor.

Step 4: Groom — Split, Estimate, and Refine

Review items for sprint-readiness. For each item:

  1. Split if estimate > 8 points (or > 1 week effort): decompose into 2-4 smaller items
  2. Estimate using the project's chosen scale
  3. Refine vague acceptance criteria into testable conditions
  4. Mark Ready when the item has title, acceptance criteria, estimate, and no blockers

Document splitting:

**Split**: B-003 split into B-003a, B-003b, B-003c (original archived)

#### B-003a: Set Up Database Schema
- **Type**: Task
- **Priority**: Must
- **Estimate**: 3
- **Status**: Ready
- **Acceptance Criteria**:
  - [ ] Users table created with email, name fields
  - [ ] Migrations run successfully on dev environment

#### B-003b: Implement User CRUD Operations
- **Type**: Task
- **Priority**: Must
- **Estimate**: 5
- **Status**: Ready
- **Acceptance Criteria**:
  - [ ] Create user endpoint returns 201 with user object
  - [ ] Update user endpoint validates required fields

Got: All Must and Should items are in Ready status.

If fail: Items that can't be estimated need a Spike (time-boxed research task) added to the backlog.

Step 5: Update Summary and Archive

Update the summary statistics. Move Done and Cancelled items to an archive section:

### Archive
| ID | Title | Status | Sprint | Completed |
|----|-------|--------|--------|-----------|
| B-001 | Enable User Login with OAuth | Done | S-003 | 2025-03-15 |
| B-004 | Add Dark Mode Theme | Cancelled | — | 2025-03-10 |

Update the summary by counting items in each status:

# Count Ready items
grep "| Ready |" BACKLOG.md | wc -l

# Count In Progress items
grep "| In Progress |" BACKLOG.md | wc -l

# Count Done items
grep "| Done |" BACKLOG.md | wc -l

Got: Summary statistics match actual item counts. Archive section contains all closed items.

If fail: If counts don't match, recount by grepping Status values and update the summary manually.

Validation

  • BACKLOG.md exists with standard structure
  • Every item has a unique ID, title, type, priority, and status
  • All Must and Should items have acceptance criteria
  • Items are sorted by priority (Must first, then Should, then Could)
  • No item estimated at > 8 points without being split
  • Summary statistics are accurate
  • Done/Cancelled items are archived

Pitfalls

  • No acceptance criteria: Items without criteria can't be verified as done. Every item needs at least 2 testable criteria.
  • Everything is Must priority: If >50% of items are Must, priorities are not real. Force-rank within Must.
  • Zombie items: Items sitting in the backlog for months without progress should be re-evaluated or cancelled.
  • Estimates without context: Story points are relative — a team must have a reference item (e.g., "B-001 is our 3-point reference").
  • Splitting creates fragments: When splitting, ensure each child item is independently deliverable and valuable.
  • Backlog as dumping ground: The backlog is not a wish list. Regularly prune items that no longer align with project goals.
  • Missing dependencies: Note blocking items in the Notes field. A blocked item should not be marked Ready.

Related Skills

  • draft-project-charter — charter scope feeds initial backlog creation
  • create-work-breakdown-structure — WBS work packages can become backlog items
  • plan-sprint — sprint planning selects from the top of the backlog
  • generate-status-report — backlog burn-down feeds status reports
  • conduct-retrospective — retrospective improvement items feed back into the backlog

GitHub 仓库

pjt222/agent-almanac
路径: i18n/caveman-lite/skills/manage-backlog
0
agentsagentskillsai-assisted-developmentclaude-codeskillsteams

相关推荐技能

content-collections

Content Collections 是一个 TypeScript 优先的构建工具,可将本地 Markdown/MDX 文件转换为类型安全的数据集合。它专为构建博客、文档站和内容密集型 Vite+React 应用而设计,提供基于 Zod 的自动模式验证。该工具涵盖从 Vite 插件配置、MDX 编译到生产环境部署的完整工作流。

查看技能

polymarket

这个Claude Skill为开发者提供完整的Polymarket预测市场开发支持,涵盖API调用、交易执行和市场数据分析。关键特性包括实时WebSocket数据流,可监控实时交易、订单和市场动态。开发者可用它构建预测市场应用、实施交易策略并集成实时市场预测功能。

查看技能

creating-opencode-plugins

该Skill帮助开发者创建OpenCode插件,用于接入命令、文件、LSP等25+种事件。它提供了插件结构、事件API规范和JavaScript/TypeScript实现模式,适合需要拦截操作、扩展功能或自定义事件处理的场景。开发者可通过它快速构建响应式模块来增强OpenCode AI助手的能力。

查看技能

sglang

SGLang是一个专为LLM设计的高性能推理框架,特别适用于需要结构化输出的场景。它通过RadixAttention前缀缓存技术,在处理JSON、正则表达式、工具调用等具有重复前缀的复杂工作流时,能实现极速生成。如果你正在构建智能体或多轮对话系统,并追求远超vLLM的推理性能,SGLang是理想选择。

查看技能