关于

This skill provides essential construction industry domain knowledge, including key terminology and financial rules, to prevent naive product specifications. It guides architects and project managers when writing technical plans for construction software like bid-builders or project management tools. Use it during feature specification, task decomposition, and UI design for construction-related products.

快速安装

Claude Code

推荐
主要方式
npx skills add avelikiy/great_cto -a claude-code
插件命令备选方式
/plugin add https://github.com/avelikiy/great_cto
Git 克隆备选方式
git clone https://github.com/avelikiy/great_cto.git ~/.claude/skills/vertical-construction

在 Claude Code 中复制并粘贴此命令以安装该技能

技能文档

Vertical: construction — don't spec it naive

Construction has its own money physics. A spec that treats a contractor's billing like a SaaS invoice will ship something no contractor can use, because the cash flow it ignores (retainage held back, draws against a schedule of values, subs gated on lien waivers) is the thing the contractor is trying to manage. This skill gives architect and pm the vocabulary and the non-obvious rules so the four construction products are specced from domain reality, not intuition.

The four products and their incumbents:

ProductArchetypeWedge against
bid-buildermarketplace-liteExcel (small contractors estimate in spreadsheets)
project-mgmtcrudBuildertrend, Contractor Foreman
subcontractor-portalmarketplace-liteProcore, manual COI/payment tracking
field-docscrudProcore field tools, paper daily reports

Incumbents: Procore (enterprise, ~$375+/mo minimum — too expensive and heavy for small contractors; do not fight it head-on), Buildertrend (residential-focused), Contractor Foreman, Autodesk Construction Cloud (enterprise). The opening is small contractors priced and complexity'd out of these.

Domain vocabulary (use these terms exactly in specs)

  • Estimate — internal cost calculation (what the job will cost the contractor). Bid — the priced number submitted to win the job (estimate + markup). Proposal — the customer-facing document wrapping the bid with scope, terms, exclusions. Estimate → bid → proposal are three artifacts, not synonyms.
  • Takeoff (quantity takeoff) — counting/measuring quantities from plans (sq ft of drywall, linear ft of pipe) that feed the estimate. Garbage takeoff = garbage bid.
  • Unit cost + assembly — an estimate is built from line items priced per unit (e.g. $/sq ft). An assembly bundles several unit-cost items into one (a "door assembly" = door + frame + hardware + labor). Real estimating is assemblies, not freehand numbers.
  • Markup vs margin — markup is added on top of cost (cost × 1.20). Margin is the cut of the bid price (price − cost) / price. 20% markup ≠ 20% margin. Mixing them mis-prices the job. Spec which one a field means.
  • Change order (CO) — a contracted change to scope/price after the bid is signed. Untracked COs are where margin leaks and disputes start.
  • RFI (request for information) — formal question to the architect/owner about ambiguous plans; the answer can change scope (→ change order).
  • Submittal — contractor's proposed material/product samples sent for approval before install.
  • Draw schedule + progress billing — payment isn't lump-sum. The contractor bills in draws as work completes, against a schedule of values (the job broken into line items each with a contract value); each billing claims a % complete per line.
  • Retainage / retention — the owner withholds a slice (typically 5–10%) of each payment until the job is complete/accepted. It is owed money the contractor can't touch yet — a first-class concept, not a discount.
  • Lien / lien waiver — a mechanic's lien is a legal claim against the property for unpaid work; a lien waiver is the sub/supplier signing away that right in exchange for payment. Conditional (on payment clearing) vs unconditional (already paid).
  • AIA G702/G703 — the industry-standard pay-application forms. G702 is the summary (application + certificate for payment); G703 is the continuation sheet (the schedule of values with this-period / to-date / retainage columns). Many owners require these exact forms.
  • 1099 subcontractor — subs are typically 1099 contractors, not employees; the GC must collect a W-9 and issue a 1099 for tax reporting.
  • COI (certificate of insurance) — proof a sub carries required insurance; must be current (not expired) before the sub works or gets paid.
  • Daily log — the dated field record (crew on site, work done, weather, deliveries, delays). It is legal/dispute evidence, not a status update.
  • Punch list — the end-of-job list of defects/incomplete items to fix before final payment / retainage release.
  • Schedule of values (SOV) — the contract sum allocated across work items; the backbone of progress billing and G703.

Non-obvious domain rules (the ones that trip a naive spec)

  1. Procore is enterprise and expensive. Don't out-feature it for small contractors — undercut on price and simplicity. The wedge is "good enough, cheap, no onboarding consultant."
  2. Small contractors estimate in Excel. bid-builder's wedge is replacing the spreadsheet with real estimate math (unit costs + assemblies + markup). It's revenue-adjacent and low-switching — the easiest first sale.
  3. Retainage is core, not an edge case. 5–10% withheld until completion changes every billing number. A billing model that doesn't carry a retainage column is wrong.
  4. Progress billing runs through the schedule of values. You bill % complete per SOV line, not a flat invoice. Model the SOV first; billing falls out of it.
  5. Subs are gated on documents before payment. A sub can't be paid until COI is current and the lien waiver for the period is signed. Payment without that gate is a real-money liability for the GC.
  6. Untracked change orders eat margin and cause disputes. Every CO must adjust the contract sum and the SOV, with a signature trail.
  7. Daily logs are dispute evidence. Photo + timestamp + weather + crew make them hold up; a free-text note that "we worked today" does not.

What a naive build gets wrong

  • Estimating as a flat list of typed-in dollar amounts — no unit costs, no assemblies, no markup/margin distinction. Result: numbers nobody can defend or reuse.
  • Billing that ignores retainage — invoices the full amount, so the contractor's books don't match what the owner actually pays.
  • project-mgmt that ignores the draw schedule / progress billing — a generic task board that never connects to how money actually arrives.
  • Subcontractor payment with no lien-waiver / COI gate — pays subs without the documents that protect the GC from liens and uninsured-work liability.
  • No change-order flow — scope changes live in email; margin leaks; disputes have no paper trail.
  • Daily logs without photo + timestamp + weather — useless as evidence when a delay or defect claim arrives.

Must-model entities

Hand these to the data model in ARCH (and apply [[migration-ready-schema]] — contractors bring their job list and customer list from the incumbent).

  • Estimate — line items with unit_cost, quantity, and assemblies; carries a markup (and derived margin) → produces a Bid.
  • Bid / Proposal — the priced submission; references the Estimate it came from.
  • ChangeOrder — adjusts contract sum + SOV; has status + signature trail; linked to the Project.
  • Subcontractor — its own entity (not an inline field) with COI status + expiry, lien-waiver status (the payment gate), and 1099 / W-9 info.
  • Project — carries a Schedule of Values, a draw schedule, and a retainage percentage/balance.
  • DailyLog — photos, weather, crew, timestamp; append-only enough to serve as evidence.

Money in integer minor units (*_cents); retainage and SOV math must not float-drift.

Per-product notes

  • bid-builder (marketplace-lite) — Wedge: revenue-adjacent, low-switching replacement for the estimating spreadsheet. The one domain thing: real estimate math — unit costs + assemblies + the markup/margin distinction producing a defensible bid. Get this wrong and it's just a worse Excel.
  • project-mgmt (crud) — Wedge: lightweight project + daily-log tool vs heavy Buildertrend/Contractor Foreman. The one domain thing: draw schedule / progress billing off the schedule of values — don't ship a generic task board disconnected from billing.
  • subcontractor-portal (marketplace-lite) — Wedge: manage subs, docs, and payments without Procore. The one domain thing: lien-waiver + COI gating before payment — the portal's whole value is that a sub can't be paid until the documents are clean.
  • field-docs (crud) — Wedge: photo/daily-report/inspection capture vs paper and Procore's field module. The one domain thing: photo + timestamp + weather + crew on every entry so the record is dispute-grade evidence.

Compliance (light — flag, don't gold-plate)

  • Lien law is state-specific — preliminary notice deadlines and lien-waiver forms vary by state; treat waiver forms as state-configurable, not hardcoded.
  • Retainage law — many states cap the retainage % and regulate timing of release; surface it as a setting.
  • 1099 for subs — collect W-9, track payments, support 1099 reporting.
  • Prevailing wage — on public/government projects (Davis-Bacon), wage rates are mandated and certified payroll is required; flag if the product targets public work.
  • COI verification — verify current (non-expired) coverage before sub work/payment.
  • OSHA — relevant to field-docs (safety inspections, incident records) but keep light.

These pair with [[vertical-onboarding]] (importing the contractor's existing jobs, subs, and customers as the low-switching wedge) and [[lifecycle-messaging]] (COI-expiry reminders, lien-waiver requests, draw/payment notifications — the messages that make the money flow run).

GitHub 仓库

avelikiy/great_cto
路径: skills/vertical-construction
0
agentic-codingclaude-code-pluginclaude-code-skillsclaude-code-subagentscode-reviewcto
FAQ

Frequently asked questions

What is the vertical-construction skill?

vertical-construction is a Claude Skill by avelikiy. Skills package instructions and resources that Claude loads on demand, so Claude can perform vertical-construction-related tasks without extra prompting.

How do I install vertical-construction?

Use the install commands on this page: add vertical-construction to Claude Code as a plugin, or clone its repository into your skills directory, then restart Claude so it picks up the skill.

What category does vertical-construction belong to?

vertical-construction is in the Meta category, tagged ai and design.

Is vertical-construction free to use?

Yes. vertical-construction is listed on AIMCP and free to install. It runs inside Claude, so no separate service account is required to use the skill itself.

相关推荐技能

content-collections

Content Collections 是一个 TypeScript 优先的构建工具,可将本地 Markdown/MDX 文件转换为类型安全的数据集合。它专为构建博客、文档站和内容密集型 Vite+React 应用而设计,提供基于 Zod 的自动模式验证。该工具涵盖从 Vite 插件配置、MDX 编译到生产环境部署的完整工作流。

查看技能
polymarket

这个Claude Skill为开发者提供完整的Polymarket预测市场开发支持,涵盖API调用、交易执行和市场数据分析。关键特性包括实时WebSocket数据流,可监控实时交易、订单和市场动态。开发者可用它构建预测市场应用、实施交易策略并集成实时市场预测功能。

查看技能
creating-opencode-plugins

该Skill帮助开发者创建OpenCode插件,用于接入命令、文件、LSP等25+种事件。它提供了插件结构、事件API规范和JavaScript/TypeScript实现模式,适合需要拦截操作、扩展功能或自定义事件处理的场景。开发者可通过它快速构建响应式模块来增强OpenCode AI助手的能力。

查看技能
sglang

SGLang是一个专为LLM设计的高性能推理框架,特别适用于需要结构化输出的场景。它通过RadixAttention前缀缓存技术,在处理JSON、正则表达式、工具调用等具有重复前缀的复杂工作流时,能实现极速生成。如果你正在构建智能体或多轮对话系统,并追求远超vLLM的推理性能,SGLang是理想选择。

查看技能