This skill facilitates the final "Test & Score" phase of a Design Sprint, consolidating feedback from customer interviews into a decisive artifact. It generates a structured report including observations, a scorecard, team insights, and a final Decider's recommendation. Use it on the sprint's last day to analyze prototype test results and determine the project's next step (build, iterate, pivot, or stop).
快速安装
Claude Code
推荐npx skills add product-on-purpose/pm-skills -a claude-code/plugin add https://github.com/product-on-purpose/pm-skillsgit clone https://github.com/product-on-purpose/pm-skills.git ~/.claude/skills/tool-design-sprint-test-and-score在 Claude Code 中复制并粘贴此命令以安装该技能
技能文档
Design Sprint Test and Score (Friday)
Friday is the sprint's payoff. 5 target-profile customers run the prototype while the team observes; the team synthesizes observations into a scorecard against the sprint questions; the Decider makes the build / iterate / pivot / stop call by end-of-day. The week's 35-40 person-days plus customer recruiting cost converts into one actionable decision.
Family contract: docs/reference/skill-families/design-sprint-skills-contract.md. This skill is a member of design-sprint-skills.
When to Use
- It is Day 5 of the Design Sprint and Thursday's prototype passed trial run.
- 5 confirmed participants are scheduled (canonical; or 4 if 1 cancelled-and-no-buffer; pause if below 4).
- The team can observe interviews live (in-person or via Zoom breakout room) and synthesize during the day.
- The Decider is present Friday PM for the post-interview review (canonically 14:00-18:00 PT window covering observation of slots 4-5 plus Decider review by 17:30 PT).
When NOT to Use
- Thursday prototype did not pass trial run. Re-run trial; if still failing at 19:00 PT Thursday, postpone Friday.
- Fewer than 3 customers confirmed. Per Ratified Decision 3, the canonical guidance is 5 customers; 3-4 or 6-7 gets a documented warning; below 3 or above 7 should trigger a re-decision (postpone or split testing). Note: the v0.1.0 family validator does NOT mechanically enforce these thresholds (cohort count is in the EXAMPLE artifact, not in frontmatter); enforcement is a v2.16 validator-expansion candidate.
- Decider unavailable for the post-interview review window. Without Decider, the day produces observations without a call.
- The team plans to use this skill to write the executive memo. Per Ratified Decision 4: exec memo authoring is delegated to
foundation-stakeholder-update(existing pm-skills foundation skill); this skill produces the Decider summary only.
What This Skill Produces
A single bundled artifact with six sections:
- Per-customer interview observation notes: one section per customer; covers Context (Act 2) reactions, Tasks (Act 4) behavior with timestamps, Debrief (Act 5) reactions including pricing. Captured live during the day's interviews.
- Best quotes: 5-15 verbatim customer quotes the team flags as most signal-bearing. Used in the Decider summary and in any downstream pitch or planning artifact.
- Scorecard grid: rows are the sprint questions (from Monday); columns are the 5 customers; each cell is Y / N / partial / unclear with a one-line note; rightmost column is the team's day-end decision per question (Validated / Invalidated / Inconclusive).
- Observed patterns: 4 buckets (worked, hesitated, broke trust, unexpected) with 2-4 patterns per bucket. Each pattern names how many customers showed it.
- Hot takes: one short paragraph per team member capturing their personal read on Friday before group synthesis biases the read. Written silently in parallel.
- Decider summary: the Decider's call (build / iterate / pivot / stop / reframe) plus the highest-confidence learning, the most important revision the team would make to the prototype direction, and the next artifact the team will produce (the post-sprint deliverable).
See references/TEMPLATE.md for the canonical structure and references/EXAMPLE.md for the Brainshelf book-catalog Friday artifact.
Friday Time Structure
Friday is the longest day: customer interviews start early (canonically 09:00 PT) and the Decider review concludes the day (canonically 17:30 PT).
- 09:00-16:30: 5 customer interviews of 50-60 minutes each at 09:00 / 10:30 / 12:00 / 14:00 / 15:30. Each slot: 10 min setup + 50-55 min interview + 5 min team huddle to capture observations before next customer.
- 13:00-14:00: Lunch (slot 3 wraps ~13:00; lunch overlaps the slot 3 to slot 4 buffer)
- 16:30-16:45: Last-customer wrap; observation note tidy
- 16:45-17:00: Team writes hot takes silently in parallel
- 17:00-17:30: Decider reviews scorecard + hot takes; makes the call
- 17:30-18:00: Decider summary captured; team begins post-sprint disposition (next-step calendar, downstream deliverable assignment)
This skill's 270-minute timebox covers the synthesis sections (scorecard, patterns, hot takes, Decider summary). The 5 interviews themselves (~5 hours of interview time) run in parallel with continuous observation capture.
Scorecard Mechanic
The scorecard is a 2-D grid. Rows are sprint questions from Monday's map-and-target (typically 3-7). Columns are the 5 customers (anonymized IDs). Each cell answers: did this customer's interview validate, invalidate, or leave inconclusive the row's question?
| C1 | C2 | C3 | C4 | C5 | Day-end decision | |
|---|---|---|---|---|---|---|
| Q1 | Y | Y | N | Y | partial | Validated (4 of 5) |
| Q2 | N | Y | unclear | N | N | Invalidated (3-of-5 N, 1 of 5 Y) |
| ... | ... | ... | ... | ... | ... | ... |
Day-end decision rules:
- Validated: 4 or 5 of 5 Y (strong signal); 3 of 5 Y with no N (directional). For 4-customer cohorts: 4 Y is Validated; 3 Y with no N is directional.
- Invalidated: 4 or 5 of 5 N. For 4-customer cohorts: 4 N is Invalidated; 3 N with no Y is directional.
- Inconclusive: all other patterns. Inconclusive questions get scheduled for follow-up (a smaller test, a quant experiment, or a second Design Sprint).
The Decider can override day-end decisions but should record reasoning.
Common Pitfalls
- Observation notes too narrative, not behavioral. "Customer seemed confused" is a narrative; "Customer hovered on the capture button for 4 seconds without tapping, then tapped twice in rapid succession" is behavior. Behavior is data; narrative is interpretation.
- Scorecard cells filled in by consensus. Each observer writes their cell read; differences are surfaced, not averaged. If C1's read on Q1 is split 2 Y vs 2 N across the team, the cell is "split" with an explanatory note.
- Hot takes written after group synthesis. Hot takes are written SILENTLY and in PARALLEL before group synthesis. Writing them after a group debrief produces consensus, not signal.
- Decider hesitating on the call because "we want more data." Friday's job is to produce a call with the data you have. If the call truly cannot be made, the call is "iterate" (re-sprint with adjustments). "Defer" is not an answer.
- Skipping the Decider summary because "we'll write it up Monday." The summary is captured Friday before the team leaves. Monday is too late; context decays fast.
- Treating "5 customers" as a soft target. Per the canonical research, 5 is where confidence about patterns crosses an inflection point. Fewer than 4 produces noisy signal; more than 7 produces synthesis-overload without much marginal signal.
Cross-Skill Usage
Prerequisites: tool-design-sprint-prototype-plan. Friday consumes the prototype and the interview script from Thursday. Without a working prototype that passed trial run, Friday cannot run.
This skill does NOT invoke tool-note-and-vote. Friday has no voting moment; the scorecard cells are individual reads and the Decider summary is the Decider's call.
This skill does NOT author an executive memo (per Ratified Decision 4). If the team wants an exec memo or stakeholder update, the next invocation is foundation-stakeholder-update, which consumes the Decider summary as input.
Downstream invocations after the sprint closes: deliver-prd (if Decider call is "build"); measure-experiment-design (if "iterate" requires a smaller follow-on experiment); iterate-pivot-decision (if "pivot" requires documenting the pivot rationale); foundation-stakeholder-update (if any of the above need stakeholder communication).
Canonical Sources
- Knapp, J., Zeratsky, J., and Kowitz, B. Sprint. Simon and Schuster, 2016. Friday chapter (Chapters 18-20).
- GV Design Sprint Guide. "Sprint Week Friday." https://www.gv.com/sprint/
- Character Capital. "Design Sprint Day 5." https://www.character.vc
- Google Design Sprint Kit. "Friday scorecard template + interview observation worksheet." https://designsprintkit.withgoogle.com/
- Nielsen, J. (2000). "Why You Only Need to Test with 5 Users." Nielsen Norman Group. https://www.nngroup.com/articles/why-you-only-need-to-test-with-5-users/ (canonical research for the 5-customer cohort size).
Decider Checkpoint
This skill ends with a Decider Checkpoint in references/TEMPLATE.md. The Decider's call (build / iterate / pivot / stop / reframe) IS the checkpoint; the sprint cannot close without it. The checkpoint also captures the next artifact the team owns producing (a PRD, a smaller experiment, a pivot memo, or a stakeholder update), which is what triggers Monday's post-sprint work to begin clean.
GitHub 仓库
相关推荐技能
content-collections
元Content Collections 是一个 TypeScript 优先的构建工具,可将本地 Markdown/MDX 文件转换为类型安全的数据集合。它专为构建博客、文档站和内容密集型 Vite+React 应用而设计,提供基于 Zod 的自动模式验证。该工具涵盖从 Vite 插件配置、MDX 编译到生产环境部署的完整工作流。
polymarket
元这个Claude Skill为开发者提供完整的Polymarket预测市场开发支持,涵盖API调用、交易执行和市场数据分析。关键特性包括实时WebSocket数据流,可监控实时交易、订单和市场动态。开发者可用它构建预测市场应用、实施交易策略并集成实时市场预测功能。
creating-opencode-plugins
元该Skill帮助开发者创建OpenCode插件,用于接入命令、文件、LSP等25+种事件。它提供了插件结构、事件API规范和JavaScript/TypeScript实现模式,适合需要拦截操作、扩展功能或自定义事件处理的场景。开发者可通过它快速构建响应式模块来增强OpenCode AI助手的能力。
sglang
元SGLang是一个专为LLM设计的高性能推理框架,特别适用于需要结构化输出的场景。它通过RadixAttention前缀缓存技术,在处理JSON、正则表达式、工具调用等具有重复前缀的复杂工作流时,能实现极速生成。如果你正在构建智能体或多轮对话系统,并追求远超vLLM的推理性能,SGLang是理想选择。