plan-release-cycle
About
This Claude Skill helps developers plan structured software release cycles, supporting both calendar-based and feature-based strategies. It defines key milestones, feature freezes, release candidates, and go/no-go criteria to coordinate releases across teams. Use it when transitioning from ad-hoc processes, coordinating multi-component releases, or planning a project's first major public release.
Quick Install
Claude Code
Recommendednpx skills add pjt222/agent-almanac -a claude-code/plugin add https://github.com/pjt222/agent-almanacgit clone https://github.com/pjt222/agent-almanac.git ~/.claude/skills/plan-release-cycleCopy and paste this command in Claude Code to install this skill
Documentation
Plan Release Cycle
Plan a structured software release cycle by defining strategy (calendar-based or feature-based), setting milestones with target dates, establishing feature freeze criteria, managing release candidates, defining go/no-go checklists, and documenting rollback plans. Produces a RELEASE-PLAN.md artifact that guides the team from development through release.
适用场景
- Starting planning for a major or minor version release
- Transitioning from ad-hoc releases to a structured release cadence
- Coordinating a release across multiple teams or components
- Defining quality gates and release criteria for a regulated project
- Planning the first public release (v1.0.0) of a project
输入
- 必需: Target version number (e.g., v2.0.0)
- 必需: Desired release date or release window
- 必需: List of planned features or scope (backlog, roadmap, or description)
- 可选: Team size and availability
- 可选: Release strategy preference (calendar-based or feature-based)
- 可选: Regulatory or compliance requirements affecting release
- 可选: Previous release velocity or cycle duration data
步骤
第 1 步:Determine Release Strategy
Choose between two primary strategies:
Calendar-based (time-boxed):
- Release on a fixed schedule (e.g., every 4 weeks, quarterly)
- Features that are not ready are deferred to the next release
- Predictable for users and downstream projects
- Best for: libraries, frameworks, tools with external consumers
Feature-based (scope-driven):
- Release when a defined set of features is complete
- Date adjusts to accommodate scope
- Risk of scope creep and indefinite delays
- Best for: internal tools, first releases, major rewrites
For most projects, a hybrid approach works well: set a target date with a defined scope, but allow a 1-2 week buffer. If scope is not met by the buffer deadline, defer remaining features.
Document the strategy choice with rationale.
预期结果: Release strategy documented with rationale matching project context.
失败处理: If the team cannot agree on a strategy, default to calendar-based with a feature-priority list. Time-boxing forces prioritization decisions.
第 2 步:Define Milestones
Break the release cycle into phases with target dates:
## Release Plan: v2.0.0
### Timeline
| Phase | Start | End | Duration | Description |
|---|---|---|---|---|
| Development | 2026-02-17 | 2026-03-14 | 4 weeks | Active feature development |
| Feature Freeze | 2026-03-15 | 2026-03-15 | 1 day | No new features merged after this date |
| Stabilization | 2026-03-15 | 2026-03-21 | 1 week | Bug fixes, documentation, testing only |
| RC1 | 2026-03-22 | 2026-03-22 | 1 day | First release candidate tagged |
| RC Testing | 2026-03-22 | 2026-03-28 | 1 week | Community/team testing of RC |
| RC2 (if needed) | 2026-03-29 | 2026-03-29 | 1 day | Second RC if critical issues found |
| Go/No-Go | 2026-03-31 | 2026-03-31 | 1 day | Final decision meeting |
| Release | 2026-04-01 | 2026-04-01 | 1 day | Tag, publish, announce |
Typical phase durations:
- Development: 50-70% of total cycle
- Stabilization: 15-25% of total cycle
- RC testing: 10-20% of total cycle
预期结果: Milestone table with dates, durations, and descriptions for each phase.
失败处理: If the timeline is too compressed (stabilization < 1 week), either extend the release date or reduce scope. Never skip stabilization.
第 3 步:Set Feature Freeze Criteria
Define what "feature freeze" means for this release:
### Feature Freeze Criteria
After feature freeze (2026-03-15):
- **Allowed**: Bug fixes, test additions, documentation updates, dependency security patches
- **Not allowed**: New features, API changes, refactoring, dependency upgrades (non-security)
- **Exception process**: Feature freeze exceptions require written justification and approval from [release owner]
### Feature Priority List
| Priority | Feature | Status | Owner | Notes |
|---|---|---|---|---|
| P0 (must) | New export format | In progress | [Name] | Blocks release |
| P0 (must) | Security audit fixes | Not started | [Name] | Compliance requirement |
| P1 (should) | Performance optimization | In progress | [Name] | Defer if not ready |
| P2 (nice) | Dark mode support | Not started | [Name] | Defer to v2.1.0 if needed |
P0 features block the release. P1 features should be included if ready. P2 features are deferred without delay.
预期结果: Feature freeze rules documented with exception process and prioritized feature list.
失败处理: If P0 features are at risk of missing the freeze date, escalate immediately. Options: extend development phase, split the feature into a smaller deliverable, or defer to a point release (v2.0.1).
第 4 步:Plan Release Candidate Process
Define how release candidates are produced and tested:
### Release Candidate Process
1. **RC1 Tag**: Tag from the stabilization branch after all P0 features merged and CI green
```bash
git tag -a v2.0.0-rc.1 -m "Release candidate 1 for v2.0.0"
-
RC Distribution: Publish RC to staging/testing channel
- R:
install.packages("pkg", repos = "https://staging.r-universe.dev/user") - Node.js:
npm install pkg@next - Internal: Deploy to staging environment
- R:
-
RC Testing Period: 5-7 business days
- Run full test suite including integration tests
- Verify all P0 features work as documented
- Test upgrade path from previous version
- Check for regressions in existing functionality
-
RC Evaluation:
- No critical/high bugs: Proceed to release
- Critical bugs found: Fix, tag RC2, restart testing period
- More than 2 RCs needed: Revisit scope and timeline
-
RC2+ Tags: Only if critical issues found in previous RC
git tag -a v2.0.0-rc.2 -m "Release candidate 2 for v2.0.0"
**预期结果:** RC process documented with tagging convention, distribution method, testing checklist, and escalation criteria.
**失败处理:** If the RC process is skipped (pressure to release), document the risk. Untested releases have higher rollback probability.
### 第 5 步:Define Go/No-Go Checklist
Create the criteria that must be met before release approval:
```markdown
### Go/No-Go Checklist
#### Must Pass (release blocked if any fail)
- [ ] All CI checks passing on release branch
- [ ] Zero critical bugs open against this version
- [ ] Zero high-severity security vulnerabilities
- [ ] All P0 features verified and documented
- [ ] Changelog complete and reviewed
- [ ] Upgrade path tested from previous version (v1.x -> v2.0.0)
- [ ] License and attribution files up to date
#### Should Pass (release proceeds with documented risk)
- [ ] Zero high bugs open (non-critical)
- [ ] All P1 features included
- [ ] Performance benchmarks within acceptable range
- [ ] Documentation reviewed and spell-checked
- [ ] External dependencies at latest stable versions
#### Decision
- **Go**: All "Must Pass" items checked, majority of "Should Pass" items checked
- **No-Go**: Any "Must Pass" item unchecked
- **Conditional Go**: All "Must Pass" checked, significant "Should Pass" items unchecked — document accepted risks
预期结果: Go/no-go checklist with clear pass/fail criteria and decision rules.
失败处理: If the go/no-go meeting results in no-go, identify the blocking items, assign owners, set a new target date (typically 1-2 weeks later), and update the release plan.
第 6 步:Document Rollback Plan
Define how to roll back if the release causes critical issues in production:
### Rollback Plan
#### Rollback Triggers
- Critical bug affecting >10% of users
- Data corruption or loss
- Security vulnerability introduced by the release
- Breaking change not documented in changelog
#### Rollback Procedure
1. **Revert package registry**: Unpublish or yank the release
- R/CRAN: Contact CRAN maintainers (cannot self-unpublish)
- npm: `npm unpublish [email protected]` (within 72 hours)
- GitHub: Mark release as pre-release, publish point fix
2. **Communicate**: Notify users via GitHub issue, mailing list, or social channels
- Template: "v2.0.0 has been rolled back due to [issue]. Please use v1.x.y until a fix is released."
3. **Fix forward**: Prefer a v2.0.1 patch release over a full rollback when possible
4. **Post-mortem**: Conduct a post-mortem within 48 hours of rollback to identify process gaps
#### Point Release Policy
- v2.0.1 for critical bug fixes within 1 week of release
- v2.0.2 for additional fixes within 2 weeks
- Patch releases do not require full RC cycle but must pass CI and critical test suite
Write the complete release plan to RELEASE-PLAN.md or RELEASE-PLAN-v2.0.0.md.
预期结果: Rollback plan documented with triggers, procedure, communication template, and point release policy. Complete RELEASE-PLAN.md written.
失败处理: If rollback is not feasible (e.g., database migration already applied), document the forward-fix procedure instead. Every release should have a recovery path.
验证清单
- Release strategy (calendar/feature/hybrid) documented with rationale
- Milestone table includes all phases with dates: development, freeze, stabilization, RC, release
- Feature freeze criteria defined with allowed/disallowed change types
- Feature priority list categorized (P0 must / P1 should / P2 nice)
- RC process documented: tagging convention, distribution, testing period, escalation
- Go/no-go checklist has clear "must pass" and "should pass" sections
- Rollback plan includes triggers, procedure, and communication template
- RELEASE-PLAN.md (or equivalent) file created and saved
- Timeline is realistic (stabilization is at least 15% of total cycle)
常见问题
- No stabilization phase: Going directly from development to release. Even a 3-day stabilization period catches issues that active development masks.
- Scope creep after freeze: Allowing "just one more feature" after feature freeze. Every post-freeze addition resets testing and introduces regression risk.
- Ignoring P0 risks: Not escalating early when a P0 feature is at risk. The earlier scope is adjusted, the less disruption to the timeline.
- Skipping RC for "small" releases: Even minor releases benefit from at least one RC. A day of RC testing is cheaper than a post-release hotfix.
- No rollback plan: Assuming the release will succeed. Every release plan should answer "what if this goes wrong?" before publishing.
- Calendar pressure overriding quality: Releasing on a date because it was promised, despite failing go/no-go criteria. A delayed release is a minor inconvenience; a broken release is a trust violation.
相关技能
apply-semantic-versioning-- Determine the version number for the planned releasemanage-changelog-- Maintain the changelog that feeds into release notesplan-sprint-- Sprint planning within the development phase of the release cycledraft-project-charter-- Project charter may define the release roadmap and success criteriagenerate-status-report-- Track progress against release milestones
GitHub Repository
Related Skills
executing-plans
DesignUse the executing-plans skill when you have a complete implementation plan to execute in controlled batches with review checkpoints. It loads and critically reviews the plan, then executes tasks in small batches (default 3 tasks) while reporting progress between each batch for architect review. This ensures systematic implementation with built-in quality control checkpoints.
requesting-code-review
DesignThis skill dispatches a code-reviewer subagent to analyze code changes against requirements before proceeding. It should be used after completing tasks, implementing major features, or before merging to main. The review helps catch issues early by comparing the current implementation with the original plan.
connect-mcp-server
DesignThis skill provides a comprehensive guide for developers to connect MCP servers to Claude Code using HTTP, stdio, or SSE transports. It covers installation, configuration, authentication, and security for integrating external services like GitHub, Notion, and custom APIs. Use it when setting up MCP integrations, configuring external tools, or working with Claude's Model Context Protocol.
web-cli-teleport
DesignThis skill helps developers choose between Claude Code Web and CLI interfaces based on task analysis, then enables seamless session teleportation between these environments. It optimizes workflow by managing session state and context when switching between web, CLI, or mobile. Use it for complex projects requiring different tools at various stages.