Back to Skills

tool-foundation-sprint-readiness

product-on-purpose
Updated 2 days ago
7 views
238
33
238
View on GitHub
Designaidesign

About

This skill provides a 45-minute diagnostic to determine if a team is ready to run a two-day Foundation Sprint. It analyzes inputs like initiative description and team composition to output a Go, Conditional Go, or Wait verdict with a supporting diagnosis. Use this tool for a fast pre-commitment check to avoid wasting time on an unready sprint.

Quick Install

Claude Code

Recommended
Primary
npx skills add product-on-purpose/pm-skills -a claude-code
Plugin CommandAlternative
/plugin add https://github.com/product-on-purpose/pm-skills
Git CloneAlternative
git clone https://github.com/product-on-purpose/pm-skills.git ~/.claude/skills/tool-foundation-sprint-readiness

Copy and paste this command in Claude Code to install this skill

Documentation

<!-- PM-Skills | https://github.com/product-on-purpose/pm-skills | Apache 2.0 -->

Foundation Sprint Readiness

Assess whether a Foundation Sprint fits the team's current situation. Most sprints that fail were sprints that should not have been run. A 30-45 minute readiness diagnostic catches that failure mode before two days of facilitated work are spent.

Family contract: docs/reference/skill-families/foundation-sprint-skills-contract.md. This skill is a member of foundation-sprint-skills and conforms to the family frontmatter and Decider Checkpoint requirements.

When to Use

  • A team is considering starting a Foundation Sprint and needs a fast diagnosis before committing two days.
  • A founder or PM has a "should we run a Foundation Sprint?" question and wants structured input rather than a vibes check.
  • An existing sprint commitment is on the calendar and the team wants to validate that prerequisites are in place.
  • Re-running a Foundation Sprint after invalidated assumptions: use to confirm new context is ready.

When NOT to Use

  • The team has already decided to run the sprint and just needs the brief. Use tool-foundation-sprint-brief instead.
  • The team needs deep customer discovery: run customer research or problem framing first; the Foundation Sprint depends on existing customer knowledge.
  • The decision is small and a full Foundation Sprint is overkill. Use a lighter prioritization or decision tool.
  • No Decider is available and one cannot be appointed. Foundation Sprint requires fast strategic calls; without authority it produces options without commitment.

What This Skill Produces

A single bundled artifact with five sections:

  1. Readiness verdict: Go / Conditional Go / Wait
  2. Diagnosis: what is in place, what is missing, what is uncertain
  3. Recommended preconditions (when verdict is Wait or Conditional Go): the prerequisite work the team should do before the sprint
  4. Recommended attendee list (when verdict is Go or Conditional Go): the 3-5 people who should be in the room, with role expectations
  5. Pre-sprint activities (when verdict is Go): the prep work to complete in the days before Day 1

See references/TEMPLATE.md for the canonical structure and references/EXAMPLE.md for a worked example using the Brainshelf book-catalog thread.

Inference Inputs

The skill runs an inference pass over these inputs to produce the verdict:

InputWhat the skill does with it
Initiative descriptionDetermines whether a Foundation Sprint is the right tool (vs problem framing, customer research, or a Design Sprint)
Team composition draftChecks roster against the Foundation Sprint role requirements; flags missing roles
Decider name and availabilityConfirms Decider can attend both days; flags partial availability as Conditional Go risk
Existing customer/market knowledge level (self-assessed 1-10)Below 5 indicates deep discovery is needed first; 5-7 indicates Conditional Go with research prep; 8+ indicates Go
(Optional) Existing competitor and alternative knowledgeFlags gaps that can be closed by overnight prep
(Optional) Logistics constraintsConfirms two days can actually be cleared

If a load-bearing input is missing or low-confidence, the skill flags it explicitly and proposes how to close the gap before the sprint.

Readiness Criteria (8 Canonical Checks)

The skill evaluates the team against these eight criteria, drawn from Knapp/Zeratsky (Click) and Character Capital's Foundation Sprint guide:

  1. Initiative is named and concrete. The team can name the project, product area, or strategic question.
  2. The stakes are meaningful. A wrong starting direction would be costly.
  3. The team has existing knowledge. Real customer, market, competitor, or domain context to make informed choices.
  4. The Decider is available. Strategic calls can be made during the sprint.
  5. The team is small enough. No more than five core decision participants is preferred.
  6. Inputs are collected. Existing research, customer examples, competitor notes, metrics are ready.
  7. The output has a path to testing. The team can use a Design Sprint, experiment, customer research, or another validation method afterward.
  8. The organization tolerates explicit tradeoffs. Foundation Sprint forces choosing a top bet and a backup, not preserving every possibility.
PatternVerdict
All 8 criteria met cleanlyGo
1-2 criteria are "yellow flags" but addressable in evening prepConditional Go with documented prep
3 or more criteria fail, or any of 1-4 is a hard failWait with recommended prerequisite work

Treat the criteria as load-bearing, not a checklist to game. A team that papers over a real gap with "yes, technically" should get a Conditional Go with the gap surfaced.

Common Pitfalls

  • Skipping the diagnostic because "we're going to run it anyway." This is the most common cause of failed sprints. The diagnostic costs 45 minutes; the failed sprint costs 16 hours of team time plus opportunity cost.
  • Treating Conditional Go as Go without doing the prep. Conditional Go means "Go after closing these gaps." If the gaps are not closed by Day 1 morning, the sprint enters the failure mode the diagnostic was meant to prevent.
  • Confusing readiness assessment with problem framing. This skill assesses whether to run a Foundation Sprint, not whether the team has the right problem. If the problem is unclear, the verdict is Wait with "do problem framing first" as the precondition.
  • No Decider, no sprint. A team with no Decider available is not ready, full stop. Appointing a "Decider for the day" who lacks real authority does not solve this.
  • Cargo-cult readiness. Reading the criteria and answering yes to all eight without checking does not produce readiness. The skill's value is in the honest diagnosis.

Canonical Sources

  • Knapp, J., and Zeratsky, J. Click: How to Make What People Want. Foundation Sprint readiness guidance.
  • Character Capital. "Foundation Sprint guide." https://www.character.vc/guide/foundation-sprint
  • Design Sprint Academy. "Foundation Sprint readiness criteria for enterprise." Used for the enterprise-context adjustments to canonical readiness.

Cross-Skill Usage

This skill is the entry point of the foundation-sprint-skills family. It has no prerequisites (the metadata.prerequisites field is intentionally empty).

When the verdict is Go, the natural next invocation is tool-foundation-sprint-brief to set up the sprint logistics. When the verdict is Wait, the team typically does prerequisite work (problem framing, customer research) before re-invoking this skill.

tool-note-and-vote may be invoked once during the readiness conversation if the team disagrees on whether a Foundation Sprint is the right tool. In practice, this is rare; the diagnostic is usually conclusive.

Decider Checkpoint

This skill ends with a Decider Checkpoint in references/TEMPLATE.md. The Decider signs off on the verdict (Go / Conditional Go / Wait) and explicitly accepts the diagnosis. Without Decider sign-off, the verdict is advisory; with sign-off, it is the commitment that triggers (or postpones) the sprint.

GitHub Repository

product-on-purpose/pm-skills
Path: skills/tool-foundation-sprint-readiness
0
agent-skillsai-skillsclaude-codeclaude-desktopdesign-sprintfoundation-sprint

Related Skills

executing-plans

Design

Use the executing-plans skill when you have a complete implementation plan to execute in controlled batches with review checkpoints. It loads and critically reviews the plan, then executes tasks in small batches (default 3 tasks) while reporting progress between each batch for architect review. This ensures systematic implementation with built-in quality control checkpoints.

View skill

requesting-code-review

Design

This skill dispatches a code-reviewer subagent to analyze code changes against requirements before proceeding. It should be used after completing tasks, implementing major features, or before merging to main. The review helps catch issues early by comparing the current implementation with the original plan.

View skill

connect-mcp-server

Design

This skill provides a comprehensive guide for developers to connect MCP servers to Claude Code using HTTP, stdio, or SSE transports. It covers installation, configuration, authentication, and security for integrating external services like GitHub, Notion, and custom APIs. Use it when setting up MCP integrations, configuring external tools, or working with Claude's Model Context Protocol.

View skill

web-cli-teleport

Design

This skill helps developers choose between Claude Code Web and CLI interfaces based on task analysis, then enables seamless session teleportation between these environments. It optimizes workflow by managing session state and context when switching between web, CLI, or mobile. Use it for complex projects requiring different tools at various stages.

View skill