Back to Skills

tool-foundation-sprint-brief

product-on-purpose
Updated 2 days ago
7 views
238
33
238
View on GitHub
Designgeneral

About

This skill generates a one-page, pre-sprint brief to define and lock the scope, key decision, roles, and logistics for a Foundation Sprint. It is used after a readiness check and before the sprint begins, producing a signed artifact that serves as the team's contract. Key outputs include the initiative statement, the critical decision to unlock, and assigned team roles.

Quick Install

Claude Code

Recommended
Primary
npx skills add product-on-purpose/pm-skills -a claude-code
Plugin CommandAlternative
/plugin add https://github.com/product-on-purpose/pm-skills
Git CloneAlternative
git clone https://github.com/product-on-purpose/pm-skills.git ~/.claude/skills/tool-foundation-sprint-brief

Copy and paste this command in Claude Code to install this skill

Documentation

<!-- PM-Skills | https://github.com/product-on-purpose/pm-skills | Apache 2.0 -->

Foundation Sprint Brief

Produce the one-page brief that aligns the team on scope, decision target, participants, logistics, and success criteria before Day 1 begins. A well-built brief prevents Day 1 from opening with re-litigation of why-are-we-here; a missing or vague brief almost guarantees it.

Family contract: docs/reference/skill-families/foundation-sprint-skills-contract.md. This skill is a member of foundation-sprint-skills.

When to Use

  • The readiness verdict from tool-foundation-sprint-readiness is Go (or Conditional Go with preconditions cleared).
  • The sprint has dates blocked on calendars and you need the artifact that names what the sprint is for.
  • The team has prep activities scheduled and you need a written reference for what to bring.
  • A skeptical exec wants to know "what is the team doing for two days?" and you need an answer that fits on one page.

When NOT to Use

  • The sprint has already started. The brief is a prep artifact, not an in-sprint deliverable. If Day 1 is happening, run tool-foundation-sprint-basics instead.
  • The readiness verdict is Wait. The brief cannot fix an unready team; close the preconditions first, then re-run readiness, then invoke this skill.
  • The team wants a strategy document. The brief is internal prep, not a stakeholder deliverable. If a stakeholder document is needed, that is a downstream artifact.
  • The brief threatens to become a multi-page strategic document. Stop and reframe: the canonical brief is one page.

What This Skill Produces

A single bundled artifact with six sections:

  1. Initiative statement and stakes: one paragraph naming what the team is sprinting on and why a wrong direction would be costly.
  2. Decision the sprint must unlock: the open strategic question the sprint resolves. Single sentence.
  3. Team roster with role assignments: who is in the room and what role each person plays per section of the sprint.
  4. Logistics plan: dates, hours, location, format (in-person, remote, hybrid), tools, daily rhythm.
  5. Existing inputs to bring: the research, customer examples, competitor notes, metrics, and constraints the team should reference during the sprint.
  6. Readiness reaffirmation: a final check that the Go verdict from tool-foundation-sprint-readiness still holds.

See references/TEMPLATE.md for the canonical structure and references/EXAMPLE.md for the Brainshelf book-catalog brief.

Inference Inputs

InputWhat the skill does with it
Readiness verdict and recommendations (from tool-foundation-sprint-readiness)Pulls the recommended attendees, preconditions, and pre-sprint activities into the brief; flags any precondition that has not been closed
Initiative descriptionCompresses into one paragraph for the Initiative Statement section
Team rosterMaps people to the required Foundation Sprint roles (Decider, Facilitator, PM, Design, Engineering, Customer Expert)
Logistics constraintsProduces the dates/hours/location/format/tools matrix; flags any constraint that would force the sprint to extend beyond two days
(Optional) Skeptical-exec talking pointsTightens the Stakes paragraph to address why-now and why-this concerns

Brief Length Discipline

The brief MUST fit on one page (or one screen). The skill enforces this through structural choices, not raw character counts:

  • Initiative Statement: one paragraph, four sentences maximum.
  • Decision the sprint must unlock: one sentence.
  • Team Roster: table with one row per person.
  • Logistics: table.
  • Inputs to Bring: bulleted list, five items maximum.
  • Readiness Reaffirmation: checklist.

If the brief expands beyond this scope, the sprint is being over-engineered before it starts. The fix is not a longer brief; the fix is a clearer decision target.

Common Pitfalls

  • Over-engineering the brief. The brief is a prep artifact, not a strategy doc. If it has an executive summary, an appendix, or a "background" section longer than one paragraph, it has drifted.
  • Treating the brief as a deliverable to stakeholders. Stakeholders do not read the brief; they read the Founding Hypothesis at the end. The brief is for the team. Sharing it publicly invites pre-sprint debate, which the sprint is supposed to resolve.
  • Vague decision target. "We will figure out our strategy" is not a decision. "We will commit to a top bet between [option A] and [option B]" is.
  • Logistics drift. "We'll figure out dates" or "we'll meet hybrid sometimes" telegraphs that the team has not actually committed to the sprint. Either dates and format are locked, or the readiness verdict was wrong.
  • Skipping readiness reaffirmation. The readiness verdict was a snapshot. If a precondition has slipped or the Decider's availability has changed since readiness, the brief needs to surface that, not paper over it.

Canonical Sources

  • Character Capital. "Foundation Sprint guide." Section on pre-sprint preparation and team scoping.
  • Knapp, J., and Zeratsky, J. Click: How to Make What People Want. Pre-sprint prep recommendations.
  • pm-skills foundation-meeting-brief precedent: brief-structure pattern adapted for the strategic context of a Foundation Sprint rather than a meeting.

Cross-Skill Usage

Prerequisites: tool-foundation-sprint-readiness. The brief expects the readiness output as its primary input. When prerequisites is honored, the brief inherits the readiness verdict, attendee recommendations, and pre-sprint activities; the skill then refines and commits them.

If the team has done equivalent prep without running the readiness skill explicitly (e.g., experienced sprint facilitator who knows the readiness criteria), the brief skill can be invoked directly. In that case, the skill body prompts the team to confirm the readiness criteria are met before generating the brief.

Next invocation in the sprint: tool-foundation-sprint-basics on Day 1 morning.

Decider Checkpoint

This skill ends with a Decider Checkpoint in references/TEMPLATE.md. The Decider signs off on scope (the decision target), team (the roster and role assignments), success criteria (what makes the sprint successful or not), and the explicit tradeoff that the sprint will force a top bet rather than preserve all directions. Without sign-off, the brief is advisory; with sign-off, it is the contract for the next two days.

GitHub Repository

product-on-purpose/pm-skills
Path: skills/tool-foundation-sprint-brief
0
agent-skillsai-skillsclaude-codeclaude-desktopdesign-sprintfoundation-sprint

Related Skills

executing-plans

Design

Use the executing-plans skill when you have a complete implementation plan to execute in controlled batches with review checkpoints. It loads and critically reviews the plan, then executes tasks in small batches (default 3 tasks) while reporting progress between each batch for architect review. This ensures systematic implementation with built-in quality control checkpoints.

View skill

requesting-code-review

Design

This skill dispatches a code-reviewer subagent to analyze code changes against requirements before proceeding. It should be used after completing tasks, implementing major features, or before merging to main. The review helps catch issues early by comparing the current implementation with the original plan.

View skill

connect-mcp-server

Design

This skill provides a comprehensive guide for developers to connect MCP servers to Claude Code using HTTP, stdio, or SSE transports. It covers installation, configuration, authentication, and security for integrating external services like GitHub, Notion, and custom APIs. Use it when setting up MCP integrations, configuring external tools, or working with Claude's Model Context Protocol.

View skill

web-cli-teleport

Design

This skill helps developers choose between Claude Code Web and CLI interfaces based on task analysis, then enables seamless session teleportation between these environments. It optimizes workflow by managing session state and context when switching between web, CLI, or mobile. Use it for complex projects requiring different tools at various stages.

View skill