About

This skill manages the change control process for validated computerized systems in regulated environments. It handles triage, impact assessment, approval workflows, and post-change verification for software updates, patches, or configuration changes. Use it when modifications to a validated system require structured tracking and compliance documentation.

Quick Install

Claude Code

Recommended
Primary
npx skills add pjt222/agent-almanac -a claude-code
Plugin CommandAlternative
/plugin add https://github.com/pjt222/agent-almanac
Git CloneAlternative
git clone https://github.com/pjt222/agent-almanac.git ~/.claude/skills/manage-change-control

Copy and paste this command in Claude Code to install this skill

Documentation

Manage Change Control

Evaluate, approve, implement, and verify changes to validated computerized systems while maintaining their validated state.

When to Use

  • A validated system requires a software upgrade, patch, or configuration change
  • Infrastructure changes (server migration, OS upgrade, network change) affect validated systems
  • A CAPA or audit finding requires system modification
  • Business process changes require system reconfiguration
  • Emergency changes need expedited approval and retrospective documentation

Inputs

  • Required: Change description (what is changing and why)
  • Required: System(s) affected and their current validated state
  • Required: Change requestor and business justification
  • Optional: Vendor release notes or technical documentation
  • Optional: Related CAPA or audit finding references
  • Optional: Existing validation documentation for affected system(s)

Procedure

Step 1: Create and Classify the Change Request

# Change Request
## Document ID: CR-[SYS]-[YYYY]-[NNN]

### 1. Change Description
**Requestor:** [Name, Department]
**Date:** [YYYY-MM-DD]
**System:** [System name and version]
**Current State:** [Current configuration/version]
**Proposed State:** [Target configuration/version]

### 2. Justification
[Business, regulatory, or technical reason for the change]

### 3. Classification
| Type | Definition | Approval Path | Timeline |
|------|-----------|--------------|----------|
| **Emergency** | Urgent fix for safety, data integrity, or regulatory compliance | System owner + QA (retrospective CCB) | Implement immediately, document within 5 days |
| **Standard** | Planned change with potential impact on validated state | CCB approval before implementation | Per CCB schedule |
| **Minor** | Low-risk change with no impact on validated state | System owner approval | Documented before implementation |

**This change is classified as:** [Emergency / Standard / Minor]
**Rationale:** [Why this classification]

Got: Change request has a unique ID, clear description, and justified classification. If fail: If classification is disputed, default to Standard and let the CCB adjudicate.

Step 2: Perform Impact Assessment

Evaluate the change against all dimensions of the validated state:

# Impact Assessment
## Change Request: CR-[SYS]-[YYYY]-[NNN]

### Impact Matrix
| Dimension | Affected? | Details | Risk |
|-----------|-----------|---------|------|
| Software configuration | Yes/No | [Specific parameters changing] | [H/M/L] |
| Source code | Yes/No | [Modules, functions, or scripts affected] | [H/M/L] |
| Database schema | Yes/No | [Tables, fields, constraints changing] | [H/M/L] |
| Infrastructure | Yes/No | [Servers, network, storage affected] | [H/M/L] |
| Interfaces | Yes/No | [Upstream/downstream system connections] | [H/M/L] |
| User access/roles | Yes/No | [Role changes, new access requirements] | [H/M/L] |
| SOPs/work instructions | Yes/No | [Procedures requiring update] | [H/M/L] |
| Training | Yes/No | [Users requiring retraining] | [H/M/L] |
| Data migration | Yes/No | [Data transformation or migration needed] | [H/M/L] |
| Audit trail | Yes/No | [Impact on audit trail continuity] | [H/M/L] |

### Regulatory Impact
- [ ] Change affects 21 CFR Part 11 controls
- [ ] Change affects EU Annex 11 controls
- [ ] Change affects data integrity (ALCOA+)
- [ ] Change requires regulatory notification

Got: Every dimension is assessed with a clear yes/no and rationale. If fail: If impact cannot be determined without testing, classify the dimension as "Unknown — requires investigation" and mandate a sandbox evaluation before production change.

Step 3: Determine Revalidation Scope

Based on the impact assessment, define what validation activities are needed:

# Revalidation Determination

| Revalidation Level | Criteria | Activities Required |
|--------------------|----------|-------------------|
| **Full revalidation** | Core functionality changed, new GAMP category, or major version upgrade | URS review, RA update, IQ, OQ, PQ, TM update, VSR |
| **Partial revalidation** | Specific functions affected, configuration changes | Targeted OQ for affected functions, TM update |
| **Documentation only** | No functional impact, administrative changes | Update validation documents, change log entry |
| **None** | No impact on validated state (e.g., cosmetic change) | Change log entry only |

### Determination for CR-[SYS]-[YYYY]-[NNN]
**Revalidation level:** [Full / Partial / Documentation only / None]
**Rationale:** [Specific reasoning based on impact assessment]

### Required Activities
| Activity | Owner | Deadline |
|----------|-------|----------|
| [e.g., Execute OQ test cases TC-OQ-015 through TC-OQ-022] | [Name] | [Date] |
| [e.g., Update traceability matrix for URS-007] | [Name] | [Date] |
| [e.g., Update SOP-LIMS-003 section 4.2] | [Name] | [Date] |

Got: Revalidation scope is proportional to the change impact — no more, no less. If fail: If revalidation scope is contested, err on the side of more testing. Under-validation is a regulatory risk; over-validation is only a resource cost.

Step 4: Obtain Approval

Route the change through the appropriate approval workflow:

# Change Approval

### Approval for: CR-[SYS]-[YYYY]-[NNN]

| Role | Name | Decision | Signature | Date |
|------|------|----------|-----------|------|
| System Owner | | Approve / Reject / Defer | | |
| QA Representative | | Approve / Reject / Defer | | |
| IT Representative | | Approve / Reject / Defer | | |
| Validation Lead | | Approve / Reject / Defer | | |

### Conditions (if any)
[Any conditions attached to the approval]

### Planned Implementation Window
- **Start:** [Date/Time]
- **End:** [Date/Time]
- **Rollback deadline:** [Point of no return]

Got: All required approvers have signed before implementation begins (except emergency changes). If fail: For emergency changes, obtain verbal approval from system owner and QA, implement the change, and complete formal documentation within 5 business days.

Step 5: Implement and Verify

Execute the change and perform post-change verification:

# Implementation Record

### Pre-Implementation
- [ ] Backup of current system state completed
- [ ] Rollback procedure documented and tested
- [ ] Affected users notified
- [ ] Test environment validated (if applicable)

### Implementation
- **Implemented by:** [Name]
- **Date/Time:** [YYYY-MM-DD HH:MM]
- **Steps performed:** [Detailed implementation steps]
- **Deviations from plan:** [None / Description]

### Post-Change Verification
| Verification | Result | Evidence |
|--------------|--------|----------|
| System accessible and functional | Pass/Fail | [Screenshot/log reference] |
| Changed functionality works as specified | Pass/Fail | [Test case reference] |
| Unchanged functionality unaffected (regression) | Pass/Fail | [Test case reference] |
| Audit trail continuity maintained | Pass/Fail | [Audit trail screenshot] |
| User access controls intact | Pass/Fail | [Access review reference] |

### Closure
- [ ] All verification activities completed successfully
- [ ] Validation documents updated per revalidation determination
- [ ] SOPs updated and effective
- [ ] Training completed for affected users
- [ ] Change record closed in change control system

Got: Implementation matches the approved plan, and all verification activities pass. If fail: If verification fails, execute the rollback procedure immediately and document the failure as a deviation. Do not proceed without QA concurrence.

Validation

  • Change request has unique ID, description, and classification
  • Impact assessment covers all dimensions (software, data, infrastructure, SOPs, training)
  • Revalidation scope is defined with rationale
  • All required approvals obtained before implementation (or within 5 days for emergency)
  • Pre-implementation backup and rollback procedure documented
  • Post-change verification demonstrates the change works and nothing else broke
  • Validation documents updated to reflect the change
  • Change record formally closed

Pitfalls

  • Skipping impact assessment for "small" changes: Even minor changes can have unexpected impacts. A configuration toggle that seems harmless may disable an audit trail or change a calculation.
  • Emergency change abuse: If more than 10% of changes are classified as "emergency," the change process is being circumvented. Review and tighten the emergency criteria.
  • Incomplete rollback planning: Assuming rollback is "just restore the backup" ignores data created between backup and rollback. Define data disposition for every rollback scenario.
  • Approval after implementation: Retrospective approval (except for documented emergencies) is a compliance violation. The CCB must approve before work begins.
  • Missing regression testing: Verifying only the changed functionality is insufficient. Regression testing must confirm that existing validated functions remain unaffected.

Related Skills

  • design-compliance-architecture — defines the governance framework including change control board
  • write-validation-documentation — create the revalidation documentation triggered by changes
  • perform-csv-assessment — full CSV reassessment for major changes requiring full revalidation
  • write-standard-operating-procedure — update SOPs affected by the change
  • investigate-capa-root-cause — when changes are triggered by CAPAs

GitHub Repository

pjt222/agent-almanac
Path: i18n/caveman-lite/skills/manage-change-control
0
agentsagentskillsai-assisted-developmentclaude-codeskillsteams

Related Skills

evaluating-llms-harness

Testing

This Claude Skill runs the lm-evaluation-harness to benchmark LLMs across 60+ standardized academic tasks like MMLU and GSM8K. It's designed for developers to compare model quality, track training progress, or report academic results. The tool supports various backends including HuggingFace and vLLM models.

View skill

cloudflare-cron-triggers

Testing

This skill provides comprehensive knowledge for implementing Cloudflare Cron Triggers to schedule Workers using cron expressions. It covers setting up periodic tasks, maintenance jobs, and automated workflows while handling common issues like invalid cron expressions and timezone problems. Developers can use it for configuring scheduled handlers, testing cron triggers, and integrating with Workflows and Green Compute.

View skill

webapp-testing

Testing

This Claude Skill provides a Playwright-based toolkit for testing local web applications through Python scripts. It enables frontend verification, UI debugging, screenshot capture, and log viewing while managing server lifecycles. Use it for browser automation tasks but run scripts directly rather than reading their source code to avoid context pollution.

View skill

finishing-a-development-branch

Testing

This skill helps developers complete finished work by verifying tests pass and then presenting structured integration options. It guides the workflow for merging, creating PRs, or cleaning up branches after implementation is done. Use it when your code is ready and tested to systematically finalize the development process.

View skill