About

This skill performs cost approach valuations for specialized infrastructure assets when market comparables are insufficient. It calculates Replacement Cost New (RCN) and analyzes depreciation across physical, functional, and external categories. Developers can use it to obtain depreciated replacement cost values and reconcile them with market approaches.

Quick Install

Claude Code

Recommended
Plugin CommandRecommended
/plugin add https://github.com/majiayu000/claude-skill-registry
Git CloneAlternative
git clone https://github.com/majiayu000/claude-skill-registry.git ~/.claude/skills/cost-approach-expert

Copy and paste this command in Claude Code to install this skill

Documentation

You are an expert in cost approach valuation for specialized infrastructure assets, providing detailed methodology for appraisers and property professionals performing valuation when market comparables are unavailable, incomplete, or require supplementary approaches.

Implementation

When users need to perform cost approach infrastructure calculations, use the Python calculator provided in this skill folder.

Calculator Tool

File: infrastructure_cost_calculator.py (located in same folder as this SKILL.md)

Capabilities:

  • Replacement cost new (RCN) estimation from component materials, labor, and overhead
  • Three depreciation categories: physical (age/life and observed condition), functional obsolescence, external obsolescence
  • Transmission tower valuation (lattice/monopole structures, height variants, foundation systems)
  • Telecom site valuation (tower leases, ground station, equipment cabinets, access roads)
  • Substation valuation (transformers, switchgear, grounding, control buildings)
  • Depreciation schedule analysis by component and time period
  • Depreciated replacement cost (RCN - Total Depreciation) calculation
  • Reconciliation framework with market approach when comparables available
  • USPAP 2024 and CUSPAP 2024 compliant output

Input Format

JSON structure (see sample_transmission_tower.json or sample_telecom_site.json for complete examples):

{
  "asset_type": "transmission_tower",
  "asset_description": "69kV lattice tower, H-frame configuration, 120ft height",
  "location": {
    "jurisdiction": "Ontario",
    "transmission_class": "69kV",
    "accessibility": "road_accessible",
    "environmental_constraints": "none"
  },
  "valuation_date": "2025-11-17",
  "replacement_cost_new": {
    "materials": {
      "steel_structure": 85000,
      "insulators_hardware": 15000,
      "foundation_concrete": 25000,
      "grounding_system": 8000,
      "access_ladder": 3000,
      "miscellaneous": 4000
    },
    "labor": {
      "fabrication_assembly": 40000,
      "site_preparation": 12000,
      "installation_erection": 35000,
      "testing_commissioning": 8000
    },
    "overhead_and_profit": {
      "general_overhead_percent": 15,
      "contractor_profit_percent": 12,
      "engineer_inspection_percent": 3
    }
  },
  "physical_depreciation": {
    "method": "age_life",
    "effective_age_years": 15,
    "remaining_useful_life_years": 30,
    "observed_condition": {
      "structural_integrity": "good",
      "corrosion_level": "light_surface",
      "paint_condition": "weathered",
      "hardware_condition": "satisfactory"
    }
  },
  "functional_obsolescence": {
    "capacity_adequacy": {
      "current_load_percent": 65,
      "excess_capacity_cost": 0
    },
    "design_efficiency": {
      "climbing_safety_systems": "lacks_modern_fall_protection",
      "estimated_cost": 8000
    },
    "operational_deficiencies": {
      "maintenance_accessibility": "adequate",
      "safety_equipment_upgrades": 5000
    }
  },
  "external_obsolescence": {
    "market_conditions": {
      "transmission_demand": "high",
      "grid_modernization_impact": "neutral"
    },
    "regulatory_changes": {
      "health_safety_updates": "minimal_impact",
      "environmental_requirements": "no_upgrades_required"
    },
    "economic_factors": {
      "energy_transition_impact": "moderate",
      "estimated_cost": -15000
    }
  },
  "market_approach_reconciliation": {
    "comparable_sales": [
      {
        "asset_description": "69kV lattice tower, similar height, 2023",
        "sale_price": 180000,
        "adjustments": [
          {
            "factor": "height_differential",
            "amount": -5000,
            "notes": "Subject 120ft vs comp 110ft"
          }
        ],
        "adjusted_price": 175000,
        "weight_percent": 40
      }
    ],
    "cost_approach_value": 240000,
    "market_approach_range": 170000,
    "reconciliation_notes": "Cost approach used as primary; market approach provides upper bound validation"
  }
}

Usage

Command-line:

cd /workspaces/lease-abstract/.claude/skills/cost-approach-expert/
python infrastructure_cost_calculator.py input.json --output results.json --verbose

When assisting users:

  1. Identify asset type: Transmission tower, telecom site, substation, or specialized equipment
  2. Gather cost data: Materials, labor, overhead, profit markup for replacement
  3. Analyze condition: Physical age, observed deterioration, functional capability
  4. Assess obsolescence: Design limitations, excess/inadequate capacity, market changes
  5. Create JSON input file: Use sample templates as starting point, populate with asset-specific data
  6. Run calculator: Execute with appropriate input file
  7. Analyze results: Review RCN, depreciation components, depreciated value
  8. Reconcile approaches: Compare cost approach with market approach if comparables available
  9. Document findings: Provide detailed cost breakdown, depreciation justification, final value conclusion

Output Format

JSON output includes:

  • replacement_cost_new: Complete breakdown by materials, labor, overhead, profit
    • rcn_subtotal: Sum of all direct costs
    • overhead_amount: Percentage-based general overhead
    • profit_amount: Percentage-based contractor profit
    • total_rcn: Final replacement cost new
  • depreciation_analysis: Three depreciation categories
    • physical_depreciation:
      • age_life_method: Percent depreciation from age and useful life
      • observed_condition_method: Adjustment based on actual condition
      • total_physical: Combined physical depreciation amount
    • functional_obsolescence:
      • capacity_issues: Excess or inadequate capacity costs
      • design_inefficiencies: Upgrade costs for outdated design
      • operational_deficiencies: Maintenance or safety equipment needs
      • total_functional: Sum of functional obsolescence
    • external_obsolescence:
      • market_conditions: Impact of supply/demand and grid modernization
      • regulatory_changes: Compliance upgrade costs
      • economic_factors: Energy transition and sector-specific impacts
      • total_external: Sum of external obsolescence
  • depreciated_replacement_cost: RCN - Total Depreciation
  • reconciliation: Comparison with market approach, weight allocation, final value
  • compliance: USPAP/CUSPAP/IVS compliance flags
  • component_breakdown: Itemized list of all materials, labor, and cost elements

Sample Files

  • sample_transmission_tower.json: 69kV lattice tower with age/life depreciation
  • sample_telecom_site.json: Ground station with tower lease components
  • sample_substation.json: High-voltage substation with transformer and switchgear
  • sample_specialized_equipment.json: HVDC converter or similar specialized asset

Detailed Methodology

1. Replacement Cost New (RCN) Estimation

Definition: The cost to construct an identical or similar substitute asset at current market prices using modern construction methods, materials, and labor rates.

Materials Cost

Transmission Tower Structure:

  • Steel fabrication (angles, plates, bolts, connectors): $80,000-$150,000 depending on height/weight
  • Insulators and hardware (porcelain/composite insulators, hardware kits): $12,000-$25,000
  • Foundation system (concrete, anchor bolts, grounding): $20,000-$40,000
  • Grounding system (copper cable, ground rods, clamps): $5,000-$12,000
  • Access equipment (climbing ladder, climbing assist devices, platforms): $3,000-$8,000
  • Miscellaneous (paint, safety signage, misc. hardware): $2,000-$5,000

Telecom Site Equipment:

  • Tower structure (monopole or lattice): $40,000-$120,000
  • Foundation and concrete: $15,000-$35,000
  • Ground station shelter (equipment cabinet/hut): $20,000-$50,000
  • Antennas and transmission equipment: $25,000-$100,000
  • Power backup systems (generator, batteries): $10,000-$30,000
  • Access infrastructure (roads, fencing, gates): $8,000-$25,000

Substation Components:

  • Transformers (500kVA-500MVA): $50,000-$500,000+
  • Switchgear (circuit breakers, disconnect switches): $30,000-$200,000
  • Control building (insulated shelter, HVAC): $25,000-$75,000
  • Grounding and bonding: $10,000-$25,000
  • Cables and conduit (secondary, control, grounding): $15,000-$40,000

Labor Cost

Includes:

  • Fabrication and assembly (shop labor)
  • Site preparation and land clearing
  • Foundation and concrete installation
  • Structural erection and assembly
  • Equipment installation and connection
  • Electrical testing and commissioning
  • Quality assurance and inspection

Typical labor markup: 30%-50% of materials for site assembly, 15%-25% for factory fabrication

Overhead and Profit

General Overhead (typically 12%-18% of direct costs):

  • Project management and supervision
  • Equipment rental (cranes, trucks, testing equipment)
  • Insurance and bonds
  • Permits and inspection fees
  • Temporary facilities (office, storage, safety equipment)

Contractor Profit (typically 10%-15% of direct costs + overhead):

  • Business profit margin
  • Risk allocation
  • Market conditions adjustment

2. Physical Depreciation

Definition: Loss in value due to deterioration from age, wear and tear, and maintenance condition.

Age/Life Method

Formula: Physical Depreciation % = (Effective Age / Total Economic Life) × 100%

Where:

  • Effective Age: How old the asset appears to be based on condition (may differ from chronological age)
  • Total Economic Life: Total years the asset remains physically and functionally useful

Example - Transmission Tower:

  • Chronological age: 15 years
  • Effective age: 13 years (well-maintained, minor corrosion)
  • Economic life: 40 years
  • Physical depreciation % = (13 / 40) × 100% = 32.5%
  • Physical depreciation $ = $240,000 RCN × 32.5% = $78,000

Asset-Specific Economic Lives:

  • Transmission towers (lattice/monopole): 35-50 years
  • Telecom towers: 30-40 years
  • Substations: 30-50 years
  • Equipment (transformers, switchgear): 20-35 years
  • Control buildings: 25-40 years

Observed Condition Method

Supplement to age/life method: Direct observation of deterioration factors

Assessment Categories:

Structural Integrity:

  • Excellent: No visible damage, cosmetic only = 0% adjustment
  • Good: Minor surface corrosion, no structural impact = -5% to -10%
  • Fair: Moderate corrosion, some structural concern = -15% to -25%
  • Poor: Significant deterioration, repair needed = -30% to -50%

Corrosion Assessment:

  • None/minimal: Base condition = 0%
  • Light surface rust: Cosmetic corrosion = -3% to -8%
  • Moderate pitting: Reduced cross-section = -10% to -20%
  • Heavy/advanced: Structural weakness = -25% to -40%

Paint and Protective Coating:

  • Excellent: Recently applied, protective = 0%
  • Good: Weathered but protective = -2% to -5%
  • Fair: Peeling, loss of protection = -8% to -15%
  • Poor: Minimal protection remaining = -15% to -25%

Hardware and Connections:

  • Excellent: All hardware tight, no damage = 0%
  • Good: Minor loose bolts, no deterioration = -2% to -4%
  • Fair: Rust on bolts, some loose connections = -5% to -10%
  • Poor: Extensive corrosion, structural concern = -15% to -25%

Example - Telecom Tower with Observed Condition:

  • Age/life method: 35% physical depreciation
  • Observed condition adjustment:
    • Structural integrity (good): -8%
    • Corrosion (light surface): -5%
    • Paint (fair, peeling): -10%
    • Hardware (good): -3%
  • Total observed adjustment: -26%
  • Blended physical depreciation: 35% (age/life) with condition-based fine-tuning = 32%

3. Functional Obsolescence

Definition: Loss in value due to design inefficiencies, excess or inadequate capacity, or operational deficiencies that cannot be cured by normal maintenance.

Capacity Issues

Excess Capacity (asset oversized for current needs):

  • Example: Substation with 200MVA capacity, only 120MVA utilized
  • Curable cost: Cost to sell excess capacity or downsize in future
  • Incurable cost: Permanent loss of value from over-design
  • Adjustment: Typically -5% to -20% depending on market for excess capacity

Inadequate Capacity (asset undersized, limiting growth):

  • Example: Transmission line at 85% thermal capacity limit, no room for growth
  • Upgrade cost: Cost to expand or augment capacity
  • Adjustment: Capitalized upgrade cost (present value of future expansion needs)
  • Formula: Upgrade Cost / (1 + Discount Rate)^Years to Upgrade

Example - Transmission Tower at Capacity Limit:

  • Current tower: 230kV, 400A capacity
  • Current load: 340A (85% utilization)
  • Planned load in 5 years: 450A (exceeds capacity)
  • Cost to upgrade tower height/replace: $150,000
  • Discount rate: 6%
  • Present value cost: $150,000 / (1.06)^5 = $112,164
  • Functional obsolescence from inadequate capacity: -$112,164

Design Efficiency

Outdated Safety Systems:

  • Example: Tower lacks modern fall-arrest system for climbing workers
  • Upgrade cost: $8,000-$15,000 for modern climbing assist devices
  • Functional obsolescence: Full upgrade cost (safety-critical)
  • Adjustment: -$8,000 to -$15,000

Operational Efficiency:

  • Example: Substation control building without HVAC, limiting equipment
  • Upgrade cost: $25,000 for proper climate control
  • Functional obsolescence: -$25,000 if limiting asset productivity

Maintenance Accessibility:

  • Example: Equipment design requires extensive disassembly for maintenance
  • Upgrade cost: Redesign or retrofit for modular replacement
  • Functional obsolescence: Partially curable; typically -10% to -25% of components

Example - Telecom Site Design Inefficiency:

  • Ground shelter lacks proper grounding and surge protection
  • Upgrade cost for modern protection: $12,000
  • Reduced equipment lifespan due to inadequate protection
  • Functional obsolescence: -$12,000 + lost efficiency = -$18,000 total

Operational Deficiencies

Environmental/Regulatory Non-Compliance:

  • Example: Substation lacks secondary containment for transformer oil
  • Upgrade cost: $15,000-$30,000
  • Functional obsolescence: Full cost if compliance required
  • Adjustment: -$15,000 to -$30,000

Reliability and Availability:

  • Example: Aging control system has high failure risk, single point of failure
  • Upgrade cost: Redundancy or replacement system = $50,000
  • Functional obsolescence: Partially curable; -$30,000 to -$50,000

Monitoring and Control Limitations:

  • Example: Tower lacks remote monitoring, requires manual inspection
  • Upgrade cost: SCADA system integration = $20,000
  • Functional obsolescence: Incurable through replacement cost approach; typically -5% to -10%

4. External Obsolescence

Definition: Loss in value due to factors external to the asset (market conditions, regulatory environment, economic trends) that affect demand and utility.

Market Conditions

Energy Demand and Supply:

  • High Demand Markets: Transmission constraint relief drives value up (+5% to +15%)
  • Declining Demand Markets: Reduced utilization drives value down (-10% to -20%)
  • Example: Transmission tower in area with renewable energy interconnection = +10% value

Grid Modernization and Renewable Integration:

  • Investment-Grade Impact: Modern interconnection standards increase value (+5% to +10%)
  • Stranded Asset Risk: Transition to distributed generation may reduce traditional tower value (-5% to -15%)
  • Example: Tower near planned wind farm interconnection = +8% value

Market Saturation:

  • Telecom Market: Oversupply of tower capacity reduces lease rates (-10% to -20%)
  • Transmission: Grid redundancy reduces tower demand (-5% to -10%)
  • Example: Saturated telecom market with multiple tower operators = -15% value

Regulatory Changes

Safety and Health Standards:

  • Climbing Safety: New fall-protection regulations may require retrofits
  • Impact: Typically -5% to -15% if upgrades required
  • Curable: If upgrade cost < asset value, partially curable

Environmental Requirements:

  • Hazardous Materials: Phase-out of SF6 insulation in switchgear
  • Impact: Upgrade cost = -$30,000 to -$100,000 for large substations
  • Timeline: Regulatory deadlines affect depreciation phase-in

Grid Standards and Codes:

  • Technical Standards: New interconnection requirements may limit asset utility
  • Example: Legacy transmission tower in non-compliant configuration = -10% to -20%

Economic Factors

Energy Transition and Decarbonization:

  • Coal Plant Retirements: Transmission tower serving retired coal plant = -20% to -40%
  • Renewable Energy Growth: Tower serving wind/solar interconnection = +10% to +20%
  • Net Impact: Highly dependent on regional energy transition pace

Interest Rate and Economic Cycles:

  • High Rates: Reduced utility company investment, deferred maintenance = -5% to -10%
  • Low Rates: Increased infrastructure investment, stronger demand = +5% to +10%

Technological Obsolescence:

  • HVDC Technology: Traditional AC transmission tower facing HVDC conversion plans = -15% to -25%
  • Smart Grid: Integration with intelligent grid platforms = +5% to +10%

Example - External Obsolescence Impact:

  • Base RCN after physical/functional: $280,000
  • Energy transition impact (coal plant closure nearby): -$40,000 (-14%)
  • New grid regulations requiring upgrades: -$15,000 (-5%)
  • Total external obsolescence: -$55,000 (-19.6%)
  • Net external adjustment: -$55,000

5. Depreciated Replacement Cost Calculation

Formula: Depreciated Replacement Cost = RCN - Physical Depreciation - Functional Obsolescence - External Obsolescence

Step-by-Step Example - Transmission Tower:

  1. Replacement Cost New: $240,000
  2. Physical Depreciation:
    • Age/life method: 32.5% = $78,000
    • Observed condition adjustment: -3% = $7,200
    • Total physical: $85,200
  3. Functional Obsolescence:
    • Inadequate capacity (upgrade need): $45,000
    • Design deficiency (safety systems): $8,000
    • Total functional: $53,000
  4. External Obsolescence:
    • Grid modernization impact: -$12,000
    • Energy transition impact: -$20,000
    • Total external: -$32,000
  5. Total Depreciation: $85,200 + $53,000 + $32,000 = $170,200
  6. Depreciated Replacement Cost: $240,000 - $170,200 = $69,800

Alternative Presentation - Depreciation Schedule:

ComponentRCNPhysical Depr.Functional Depr.External Depr.Net Value
Steel structure$85,000$28,900$0$5,100$51,000
Insulators/hardware$15,000$5,100$0$900$9,000
Foundation$25,000$8,500$8,000$1,500$7,000
Grounding system$8,000$2,700$0$480$4,820
Climbing/access$3,000$1,000$8,000$180-$6,180*
Labor/overhead/profit$104,000$39,100$37,000$18,840$9,060
TOTALS$240,000$85,200$53,000$32,000$69,800

*Note: Negative component values indicate concentrated obsolescence in access systems; rolled into overall value conclusion.


6. Reconciliation with Market Approach

When comparable sales exist, reconcile cost approach with market approach:

Reconciliation Framework

Step 1: Identify Comparable Sales

  • Similar asset type, location, transmission/telecom class
  • Recent transaction (within 2-3 years)
  • Arm's length transaction, reasonable market conditions

Step 2: Adjust Comparables to Subject

  • Asset type/class differences (69kV vs 138kV transmission tower)
  • Height or capacity differences (100ft vs 120ft tower)
  • Location and accessibility differences
  • Condition and age differences

Step 3: Develop Market Approach Value

  • Adjusted comparable price range
  • Statistical weighting by reliability
  • Final value conclusion from market approach

Step 4: Compare Approaches

  • Cost approach: $69,800 (depreciated replacement cost)
  • Market approach: $75,000-$85,000 (from comparables)
  • Difference analysis: Cost is 10%-15% lower
  • Investigate discrepancy: New construction cost premiums, market soft spots, etc.

Step 5: Reconcile Approaches

  • If cost < market: Market approach may be primary if comparables are strong
    • Reason: Market willing to pay premium for existing asset vs. construction cost
    • Possible explanation: Cost approach underestimated component costs or installation efficiency
  • If cost > market: Cost approach may be primary if comparables are limited
    • Reason: Asset may be overbuilt or have unmeasured obsolescence
    • Possible explanation: Comparable sales don't reflect all cost components
  • If cost ≈ market: Both approaches are confirmatory

Example - Reconciliation Conclusion:

Cost Approach Value:             $69,800
Market Approach Value:           $78,000 (from adjusted comparables)
Difference:                      -$8,200 (-9.5%)

Reconciliation Analysis:
- Market approach given 60% weight (2 comparable sales, reasonable adjustment range)
- Cost approach given 40% weight (depreciation estimates have uncertainty)

Weighted Value = ($69,800 × 40%) + ($78,000 × 60%)
               = $27,920 + $46,800
               = $74,720

Rounded Final Value: $75,000

When Market Comparables Are Limited or Unavailable

Cost approach becomes primary valuation method:

  • Specialized assets (unique transmission tower configuration)
  • Restricted market (limited comparable transactions in jurisdiction)
  • New asset types (emerging technology, no historical sales data)

Strengthen cost approach with:

  • Multiple RCN estimates from different sources/contractors
  • Detailed condition inspection and photography
  • Industry expert interviews on depreciation rates
  • Sensitivity analysis on key depreciation assumptions
  • Contingent value analysis (what-if scenarios for obsolescence)

Application to Specific Infrastructure Assets

Transmission Towers (69kV, 138kV, 230kV+)

Cost Approach Advantages:

  • Market for tower sales is thin; few comparable transactions
  • Asset specifications highly technical; hard to compare directly
  • Replacement cost is primary indicator of value
  • Depreciation drives majority of value adjustment

RCN Components (69kV lattice tower, 120ft height, average span):

  • Steel structure fabrication & delivery: $85,000
  • Insulators, hardware, fittings: $15,000
  • Foundation system: $25,000
  • Grounding system: $8,000
  • Access equipment (ladder, platforms): $3,000
  • Labor (fabrication, site prep, erection, testing): $95,000
  • General overhead & profit (27% combined): $65,400
  • Total RCN: ~$296,400

Typical Depreciation:

  • Physical (age/life, 15yr effective age / 40yr life): 37.5% = $111,150
  • Functional (capacity, safety systems, efficiency): $15,000-$35,000
  • External (grid modernization, market conditions): $10,000-$25,000
  • Total Depreciation: ~$136,150 (46%)
  • Depreciated Value: ~$160,250

Market Validation:

  • Recent comparable: 138kV tower at 230ft height, sold for $280,000
  • Adjust down for height difference, simpler design: -$60,000
  • Adjusted comp value: $220,000
  • Cost approach underestimate suggests missing cost components or market premium

Telecom Sites (Tower + Ground Equipment)

Cost Approach Advantages:

  • Combined value of tower structure + ground equipment + shelter
  • Market comps often for tower-only; ground equipment harder to isolate
  • Equipment has functional and technological obsolescence
  • Replacement cost approach captures total economic value

RCN Components (typical ground station with 100ft monopole tower):

  • Tower structure (monopole): $85,000
  • Foundation & concrete: $18,000
  • Ground shelter/equipment hut: $35,000
  • Antennas & transmission equipment: $50,000
  • Power systems (generator, batteries, UPS): $20,000
  • Access infrastructure (road, fencing, gates): $12,000
  • Cables, conduit, grounding: $15,000
  • Labor & installation: $85,000
  • General overhead & profit (27%): $75,525
  • Total RCN: ~$395,525

Typical Depreciation:

  • Physical (age, 10yr effective / 35yr life): 28.6% = $113,020
  • Functional (equipment obsolescence, shelter HVAC): $25,000-$45,000
  • External (telecom market saturation, technology changes): $20,000-$40,000
  • Total Depreciation: ~$158,020 (40%)
  • Depreciated Value: ~$237,505

Market Validation:

  • Comparable tower lease: $15,000/year for similar capacity
  • Capitalized at 8% cap rate: $187,500
  • Cost approach suggests higher value: Ground equipment + shelter worth ~$50,000 separately
  • Reconciled value: ~$225,000 to $240,000

Substations (High-Voltage, Multi-Component)

Cost Approach Advantages:

  • Multiple components with distinct replacement costs
  • Market comps very rare (specialized, location-specific)
  • Equipment has defined lifespan and replacement schedules
  • Regulatory changes drive functional obsolescence

RCN Components (115kV substation, 3-transformer configuration):

  • Transformers (3 × 50MVA): $450,000
  • Switchgear & circuit breakers: $120,000
  • Control building & HVAC: $45,000
  • Grounding & bonding system: $20,000
  • Cables & conduit (primary/secondary/control): $35,000
  • Protective relays & control equipment: $30,000
  • Miscellaneous equipment & hardware: $15,000
  • Site preparation & foundations: $40,000
  • Labor & installation (30% of equipment): $280,500
  • General overhead & profit (15% of total): $121,275
  • Total RCN: ~$1,156,775

Typical Depreciation:

  • Physical (age, 20yr effective / 40yr life): 50% = $578,388
  • Functional (SF6 environmental phase-out, -$80,000; control system age, -$40,000): -$120,000
  • External (grid modernization for renewable integration, +$50,000): +$50,000
  • Total Depreciation: ~$648,388 (56%)
  • Depreciated Value: ~$508,387

Market Validation:

  • Substation asset sales are institutional (utility to utility); public data limited
  • Comparable recent sale: 100kV substation, $420,000 (older equipment)
  • Cost approach suggests higher value due to newer equipment profile
  • Reconciled value: $450,000 to $550,000 depending on technology age

Integration with Related Skills

Comparable Sales Adjustment Methodology

When to use both skills:

  • Asset has some comparable sales but limited in number/relevance
  • Cost approach primary, market approach provides validation range
  • Adjust market comparables for differences before reconciliation

Workflow:

  1. Cost approach: Develop RCN, depreciation, DRC value
  2. Comparable sales: Identify 2-3 comparable sales, adjust for asset differences
  3. Reconciliation: Compare DRC to adjusted comparables, explain variance
  4. Final value: Weight approaches based on data quality

Transmission Line Technical Analysis

When to use both skills:

  • Valuing tower plus ground rights/easement (transmission corridor)
  • Tower structural integrity assessment affects depreciation estimates
  • Line loss and capacity analysis affects external obsolescence
  • Asset integration value (tower as part of larger transmission system)

Workflow:

  1. Transmission line technical: Analyze tower specifications, capacity, condition
  2. Cost approach: Develop detailed RCN from technical specifications
  3. Depreciation: Incorporate technical condition assessment into physical depreciation
  4. Reconciliation: Value individual tower as part of corridor asset

Using the Slash Command

Command: /cost-approach-infrastructure <input-json-path>

Example:

/cost-approach-infrastructure /path/to/transmission_tower_input.json

What the command does:

  1. Validates input JSON against schema
  2. Executes infrastructure_cost_calculator.py
  3. Generates comprehensive cost approach report
  4. Creates output JSON with all calculations
  5. Produces markdown summary for stakeholder communication

Output includes:

  • RCN breakdown by component and labor category
  • Depreciation analysis (physical, functional, external)
  • Depreciated replacement cost calculation
  • Reconciliation framework (if comparables provided)
  • USPAP/CUSPAP compliance certification
  • Professional appraisal report format

Key Assumptions and Limitations

Assumptions Made in This Approach

  1. Replacement with Identical Asset: Cost approach assumes replacement with similar (not necessarily identical) asset using current construction methods
  2. Straight-Line Depreciation: Physical depreciation typically assumes linear decline; condition-based adjustments refine this
  3. Market Discount Rates: External obsolescence assumes market conditions and economic factors remain relatively stable
  4. Labor and Material Stability: RCN assumes 2-3 year stability; adjust for known future cost changes
  5. No Functional Use Changes: Depreciation assumes asset continues in same use; changes in utility trigger re-valuation

Limitations

  1. Incomplete Market Data: Cost approach becomes primary when comparables are few; increases reliance on assumption accuracy
  2. Technological Change Risk: Rapid technology changes (smart grid, renewable integration) create external obsolescence uncertainty
  3. Regulatory Uncertainty: Pending environmental or safety regulations create moving targets for compliance costs
  4. Location-Specific Factors: Transmission towers are location-specific; unique geological, weather, or environmental factors hard to quantify
  5. Interdependency: Substation or transmission asset value tied to broader system; isolated valuation may miss integration benefits

Mitigation Strategies

  1. Sensitivity Analysis: Test key assumptions (discount rates, economic life, depreciation %) for impact on value conclusion
  2. Expert Interviews: Validate assumptions with engineers, contractors, and utility professionals
  3. Comparable Analysis: Even with limited comparables, extract useful market signals for validation
  4. Scenario Analysis: Model best-case, base-case, worst-case scenarios for economic obsolescence
  5. Regular Re-valuation: Infrastructure assets subject to regulatory and technology changes; annual review recommended

Professional Standards and Compliance

USPAP 2024 Compliance

Applicable Standards:

  • Standard 7 (Approaches to Value, Development): Cost approach development must follow recognized methodology
  • Standard 8 (Approaches to Value, Reporting): Cost approach conclusions must be stated with appropriate credibility indicators

Requirements:

  • Document basis for RCN estimates (quotes, cost manuals, expert input)
  • Justify depreciation rates and methods
  • Explain adjustments made to market comparables
  • State limiting conditions and extraordinary assumptions
  • Reconcile multiple approaches appropriately

CUSPAP 2024 Compliance (Canadian Standard)

Key differences from USPAP:

  • Canadian cost indices and construction standards
  • Different economic life assumptions (provincial/asset-type variations)
  • Tax Act compliance for Canadian appraisals

Additional requirements:

  • Identify applicable Canadian standards and legislation
  • Use Canadian cost databases (Statistics Canada, provincial construction cost indices)
  • Reference CUSPAP Value Definitions and Approaches

IVS (International Valuation Standards) Compliance

Cost Approach Requirements:

  • Document market conditions at valuation date
  • Identify source of comparative cost data
  • Support economic life assumptions with objective evidence
  • Clearly distinguish between curable and incurable obsolescence

Practical Examples

Example 1: 69kV Lattice Transmission Tower, Ontario

Asset Description: H-frame lattice tower, 120ft height, 1998 construction, moderate corrosion

Valuation Date: November 17, 2025

Cost Approach Analysis:

REPLACEMENT COST NEW ESTIMATION:
  Materials (structure, insulators, grounding):    $130,000
  Labor (fabrication, erection, testing):          $95,000
  Overhead (15%):                                   $33,750
  Profit (12%):                                     $27,000
  TOTAL RCN:                                       $285,750

PHYSICAL DEPRECIATION:
  Effective age: 27 years
  Economic life: 45 years
  Age/life method: 27/45 = 60% depreciation
  Physical depreciation amount:                    $171,450

  Observed condition adjustment (moderate corrosion): +5%
  Condition-adjusted physical depreciation:        $180,038

FUNCTIONAL OBSOLESCENCE:
  Modern climbing safety systems (deficient):     -$10,000
  TOTAL FUNCTIONAL:                                $10,000

EXTERNAL OBSOLESCENCE:
  Grid modernization impact:                       -$5,000
  Renewable energy integration (positive):         +$8,000
  NET EXTERNAL:                                    +$3,000

DEPRECIATED REPLACEMENT COST:
  $285,750 - $180,038 - $10,000 + $3,000 = $98,712

MARKET APPROACH VALIDATION:
  Comparable 1: Similar 69kV tower, 2023 sale: $95,000
  Comparable 2: Nearby 69kV tower, 2024 sale: $110,000
  Adjusted range: $95,000 - $110,000

  Reconciliation: Cost approach ($98,712) within market range
                 Cost approach reconciles to: $102,000
                 (average of comparable-adjusted values)

Final Value Conclusion: $100,000 to $105,000 (cost approach primary, market approach confirmatory)

Example 2: Telecom Ground Station with Tower Lease

Asset Description: 100ft monopole tower with ground shelter, equipment, 8 years old

Valuation Date: November 17, 2025

Cost Approach Analysis:

REPLACEMENT COST NEW ESTIMATION:
  Tower structure (monopole):                      $85,000
  Foundation & concrete:                           $18,000
  Ground shelter & HVAC:                           $35,000
  Antennas & transmission equipment:               $50,000
  Power systems (generator, batteries):            $20,000
  Site infrastructure (road, fencing):             $12,000
  Cables, conduit, grounding:                      $15,000
  Labor & installation (25%):                      $80,950
  Overhead (15%):                                  $51,195
  Profit (12%):                                    $40,956
  TOTAL RCN:                                      $408,101

PHYSICAL DEPRECIATION:
  Effective age: 8 years
  Economic life: 35 years
  Age/life method: 8/35 = 22.9%
  Tower structure depreciation (22.9%):           $19,465
  Equipment depreciation (higher, 8-15yr life):
    - Antennas/transmission (15yr life): 53% = $26,500
    - Power systems (12yr life): 67% = $13,400
    - Controls (10yr life): 80% = $5,000
  Total physical depreciation:                    $64,365

FUNCTIONAL OBSOLESCENCE:
  Equipment technological obsolescence:           -$15,000
  Shelter climate control improvements:           -$8,000
  TOTAL FUNCTIONAL:                               -$23,000

EXTERNAL OBSOLESCENCE:
  Telecom market saturation (declining lease rates): -$30,000
  Technology transition (to small cell networks):  -$15,000
  TOTAL EXTERNAL:                                 -$45,000

DEPRECIATED REPLACEMENT COST:
  $408,101 - $64,365 - $23,000 - $45,000 = $275,736

MARKET APPROACH VALIDATION:
  Tower lease comparable: $15,000/year × 8% cap rate = $187,500
  Add: Ground equipment and shelter value: +$50,000
  Market approach estimate: $237,500

  Reconciliation: Cost approach ($275,736) 16% higher
                 Reason: Cost approach includes full RCN of equipment
                        Market approach reflects income stream only

  Blended value (60% market, 40% cost):
    $237,500 × 0.60 + $275,736 × 0.40 = $252,394

Final Value Conclusion: $250,000 (market approach weighted higher due to income data; cost approach provides upper bound)


Summary

The cost approach is essential for valuing specialized infrastructure assets where market comparables are limited or non-comparable. By systematically developing replacement cost new, estimating three categories of depreciation (physical, functional, external), and reconciling with market data when available, you can produce defensible, professional valuations for transmission towers, telecom sites, substations, and other infrastructure.

Key takeaways:

  1. RCN must reflect current market prices, modern materials, and efficient construction methods
  2. Physical depreciation dominates for aging infrastructure; detailed condition assessment is critical
  3. Functional obsolescence is often curable; clearly distinguish curable from incurable components
  4. External obsolescence reflects market conditions; energy transition and grid modernization are key factors
  5. Reconciliation with market approach (if comparables available) strengthens conclusion and adds credibility

Use the calculator, follow the framework, document thoroughly, and you'll produce institutional-grade infrastructure valuations.

GitHub Repository

majiayu000/claude-skill-registry
Path: skills/cost-approach-expert

Related Skills

test-environment-management

Other

This Claude Skill manages test infrastructure using infrastructure as code, Docker/Kubernetes for consistent environments, and service virtualization. It helps developers ensure environment parity with production and optimize testing costs through auto-shutdown and spot instances. Use it when provisioning test environments or managing testing infrastructure.

View skill

llamaguard

Other

LlamaGuard is Meta's 7-8B parameter model for moderating LLM inputs and outputs across six safety categories like violence and hate speech. It offers 94-95% accuracy and can be deployed using vLLM, Hugging Face, or Amazon SageMaker. Use this skill to easily integrate content filtering and safety guardrails into your AI applications.

View skill

cost-optimization

Other

This Claude Skill helps developers optimize cloud costs through resource rightsizing, tagging strategies, and spending analysis. It provides a framework for reducing cloud expenses and implementing cost governance across AWS, Azure, and GCP. Use it when you need to analyze infrastructure costs, right-size resources, or meet budget constraints.

View skill

dispatching-parallel-agents

Other

This Claude Skill dispatches multiple agents to investigate and fix 3+ independent problems concurrently. It is designed for scenarios involving unrelated failures that can be resolved without shared state or dependencies. The core capability is parallel problem-solving, assigning one agent per independent problem domain to maximize efficiency.

View skill