decommission-validated-system
关于
This skill provides a structured process to decommission validated systems, ensuring compliance with data retention regulations and proper archival. It handles key technical steps like data migration validation, access revocation, and stakeholder notification. Use it when replacing or retiring a system due to end-of-life, discontinued support, consolidation, or regulatory changes.
快速安装
Claude Code
推荐npx skills add pjt222/agent-almanac -a claude-code/plugin add https://github.com/pjt222/agent-almanacgit clone https://github.com/pjt222/agent-almanac.git ~/.claude/skills/decommission-validated-system在 Claude Code 中复制并粘贴此命令以安装该技能
技能文档
Decommission Validated System
Plan and execute the controlled retirement of a validated computerized system while preserving data integrity and meeting regulatory retention requirements.
When to Use
- A validated system is being replaced by a new system
- A system is reaching end-of-life with no replacement (business process eliminated)
- Vendor discontinues support for a validated product
- Consolidation of multiple systems into a single platform
- Regulatory or business changes render a system obsolete
Inputs
- Required: System to be decommissioned (name, version, validation status)
- Required: Data retention requirements by regulation (21 CFR Part 11, GLP, GCP)
- Required: Replacement system (if applicable) and migration scope
- Optional: Current validation documentation package
- Optional: Data volume and format inventory
- Optional: Business owner and stakeholder list
Procedure
Step 1: Assess Data Retention Requirements
Determine how long data must be retained and in what form:
# Data Retention Assessment
## Document ID: DRA-[SYS]-[YYYY]-[NNN]
### Regulatory Retention Requirements
| Regulation | Data Type | Retention Period | Format Requirements |
|-----------|-----------|-----------------|-------------------|
| 21 CFR 211 (GMP) | Batch records, test results | 1 year past product expiry or 3 years after distribution | Readable, retrievable |
| 21 CFR 58 (GLP) | Study data and records | Duration of study + retention agreement | Original or certified copy |
| ICH E6 (GCP) | Clinical trial records | 2 years after last marketing approval or formal discontinuation | Accessible for inspection |
| 21 CFR Part 11 | Electronic records | Per predicate rule | Original format or validated migration |
| EU Annex 11 | Computerized system records | Per applicable GxP | Readable and available |
| Tax/financial | Financial records | 7-10 years (jurisdiction-dependent) | Readable |
### System Data Inventory
| Data Category | Volume | Format | Retention Required Until | Disposition |
|---------------|--------|--------|------------------------|-------------|
| [e.g., Batch records] | [e.g., 50,000 records] | [e.g., Database + PDF reports] | [Date] | Migrate / Archive / Destroy |
| [e.g., Audit trail] | [e.g., 2M entries] | [e.g., Database] | [Same as parent records] | Archive |
| [e.g., User data] | [e.g., 200 profiles] | [e.g., LDAP/Database] | [Employment + 2 years] | Anonymise and archive |
Got: Every data category has a defined retention period, format requirement, and planned disposition. If fail: If retention requirements are unclear, consult regulatory affairs and legal. Default to the longest applicable retention period.
Step 2: Plan Data Migration (If Applicable)
If data is migrating to a replacement system:
# Data Migration Plan
## Document ID: DMP-[SYS]-[YYYY]-[NNN]
### Migration Scope
| Source | Target | Data Category | Records | Migration Method |
|--------|--------|---------------|---------|-----------------|
| [Old system] | [New system] | [Category] | [Count] | ETL / Manual / API |
### Data Mapping
| Source Field | Source Format | Target Field | Target Format | Transformation |
|-------------|-------------|-------------|---------------|---------------|
| [e.g., test_result] | FLOAT(8,2) | [e.g., result_value] | DECIMAL(10,3) | Precision conversion |
| [e.g., operator_id] | VARCHAR(20) | [e.g., user_id] | UUID | Lookup table mapping |
### Validation Approach
| Check | Method | Acceptance Criteria |
|-------|--------|-------------------|
| Record count reconciliation | Source count vs target count | 100% match |
| Field-level comparison | Sample 5% of records, all fields | 100% match after transformation |
| Checksum verification | Hash source vs target for key fields | Checksums match |
| Business rule validation | Verify key calculations in target | Results match source |
| Audit trail continuity | Verify historical audit trail migrated | All entries present with original timestamps |
Got: Migration plan includes mapping, transformation rules, and validation checks that prove data integrity was maintained. If fail: If migration validation fails, do not proceed to decommission. Fix the migration issues and re-validate.
Step 3: Define Archival Strategy
For data that will be archived rather than migrated:
# Archival Strategy
### Archive Format
| Consideration | Decision | Rationale |
|--------------|----------|-----------|
| Format | [PDF/A, CSV, XML, database backup] | [Why this format survives the retention period] |
| Medium | [Network storage, cloud archive, tape, optical] | [Durability and accessibility] |
| Encryption | [Yes/No — method if yes] | [Security vs long-term accessibility trade-off] |
| Integrity verification | [SHA-256 checksums, periodic verification schedule] | [Prove archive is uncorrupted] |
### Archive Verification
- [ ] Archived data is readable without the source system
- [ ] All required data categories are included in the archive
- [ ] Checksums recorded at time of archival
- [ ] Archive can be searched and retrieved within [defined SLA, e.g., 5 business days]
- [ ] Periodic integrity checks scheduled (annually)
### Archive Access
| Role | Access Level | Authorisation |
|------|-------------|--------------|
| QA Director | Read access to all archived data | Standing authorisation |
| Regulatory Affairs | Read access for inspection support | Standing authorisation |
| System Owner (former) | Read access for business queries | Request-based |
| External auditors | Read access, supervised | Per audit plan |
Got: Archived data is readable, searchable, and verifiable without the original system. If fail: If data cannot be read independently of the source system, the archive is not compliant. Consider exporting to an open, standard format (PDF/A, CSV) before decommission.
Step 4: Execute Decommissioning
# Decommission Checklist
## Document ID: DC-[SYS]-[YYYY]-[NNN]
### Pre-Decommission
- [ ] All stakeholders notified of decommission date and data disposition
- [ ] Data migration completed and validated (if applicable)
- [ ] Data archive created and verified (if applicable)
- [ ] Final backup of complete system taken and stored separately
- [ ] All open change requests resolved or transferred
- [ ] All open CAPAs resolved or transferred to successor system
- [ ] All active users informed and redirected to replacement system (if applicable)
### Decommission Execution
- [ ] User access revoked for all accounts
- [ ] System removed from production environment
- [ ] Network connections disconnected
- [ ] Licenses returned or terminated
- [ ] System entry removed from active system inventory
- [ ] System moved to "Decommissioned" status in compliance architecture
### Post-Decommission
- [ ] Validation documentation archived (URS, VP, IQ/OQ/PQ, TM, VSR)
- [ ] SOPs retired or updated to remove references to decommissioned system
- [ ] Training records archived
- [ ] Change control records archived
- [ ] Audit trail archived
- [ ] Decommission report completed and approved
### Decommission Report
| Section | Content |
|---------|---------|
| System description | Name, version, purpose, GxP classification |
| Decommission rationale | Why the system is being retired |
| Data disposition summary | What data went where (migrated, archived, destroyed) |
| Validation evidence | Migration validation results, archive verification |
| Residual risk | Any ongoing data retention obligations |
| Approval | System owner, QA, IT signatures |
Got: Decommissioning is controlled, documented, and approved — not just "turn it off." If fail: If any checklist item cannot be completed, document the exception and obtain QA approval before proceeding.
Validation
- Data retention requirements assessed for all data categories
- Data migration validated with record counts, sampling, and checksums (if applicable)
- Archive created in a format readable without the source system
- Archive integrity verified with checksums
- All user access revoked
- Validation documentation archived with defined retention period
- SOPs updated to remove references to decommissioned system
- Decommission report approved by system owner, QA, and IT
Pitfalls
- Premature decommission: Turning off a system before data migration is validated risks permanent data loss. Complete all validation before pulling the plug.
- Unreadable archives: Storing data in a proprietary format that requires the original system to read defeats the purpose of archival. Use open formats.
- Forgotten audit trails: Archiving the data but not the audit trail means the data provenance cannot be demonstrated. Always archive audit trails with their parent records.
- Orphaned SOPs: SOPs that still reference a decommissioned system confuse users and create compliance gaps. Update or retire all affected SOPs.
- No periodic archive verification: Archives degrade. Without periodic integrity checks, data loss may go undetected until the data is needed for an inspection.
Related Skills
design-compliance-architecture— update the system inventory and compliance architecture after decommissionmanage-change-control— decommissioning is a major change requiring change controlwrite-validation-documentation— migration validation follows the same IQ/OQ methodologywrite-standard-operating-procedure— retire or update SOPs referencing the decommissioned systemprepare-inspection-readiness— archived data must remain accessible for regulatory inspections
GitHub 仓库
相关推荐技能
evaluating-llms-harness
测试该Skill通过60+个学术基准测试(如MMLU、GSM8K等)评估大语言模型质量,适用于模型对比、学术研究及训练进度追踪。它支持HuggingFace、vLLM和API接口,被EleutherAI等行业领先机构广泛采用。开发者可通过简单命令行快速对模型进行多任务批量评估。
cloudflare-cron-triggers
测试这个Claude Skill提供了关于Cloudflare Cron Triggers的完整知识库,用于通过cron表达式定时执行Workers。它支持配置周期性任务、维护作业和自动化工作流,并能处理常见的cron触发错误。开发者可以用它来设置定时任务、测试cron处理器,并集成Workflows和Green Compute功能。
webapp-testing
测试该Skill为开发者提供了基于Playwright的本地Web应用测试工具集,支持自动化测试前端功能、调试UI行为、捕获屏幕截图和查看浏览器日志。它包含管理服务器生命周期的辅助脚本,可直接作为黑盒工具运行而无需阅读源码。适用于需要快速验证本地Web应用界面和交互功能的开发场景。
finishing-a-development-branch
测试这个Skill用于开发分支完成后的集成决策,当代码实现完成且测试通过时,它会引导开发者选择合适的工作流。它首先验证测试状态,然后提供合并、创建PR或清理等结构化选项。核心价值在于确保代码质量的同时,标准化分支收尾流程。
