SKILL·333880

decommission-validated-system

pjt222
更新于 1 month ago
9 次查看
26
3
26
在 GitHub 上查看
其他general

关于

This skill guides developers through decommissioning a validated computer system at its end-of-life, ensuring regulatory compliance. It handles data retention assessment, validated data migration, archival strategies, access decommissioning, and stakeholder notification. Use it when replacing a system, consolidating systems, ending support, or when regulatory changes make a system obsolete.

快速安装

Claude Code

推荐
主要方式
npx skills add pjt222/agent-almanac -a claude-code
插件命令备选方式
/plugin add https://github.com/pjt222/agent-almanac
Git 克隆备选方式
git clone https://github.com/pjt222/agent-almanac.git ~/.claude/skills/decommission-validated-system

在 Claude Code 中复制并粘贴此命令以安装该技能

技能文档


name: decommission-validated-system description: > Validiertes computergestuetztes System am Ende seines Lebenszyklus ausser Betrieb nehmen. Umfasst Datenaufbewahrungsbewertung nach Vorschrift, Datenmigrations-Validierung (Mapping, Transformation, Abgleich), Archivierungsstrategie, Zugangssperrung, Dokumentenarchivierung und Benachrichtigung der Stakeholder. Anzuwenden wenn ein validiertes System ersetzt wird, ohne Ersatz das Lebensende erreicht, der Anbieterssupport eingestellt wird, mehrere Systeme konsolidiert werden oder regulatorische Aenderungen ein System obsolet machen. locale: de source_locale: en source_commit: 6f65f316 translator: claude-opus-4-6 translation_date: 2026-03-16 license: MIT allowed-tools: Read Write Edit Bash Grep Glob metadata: author: Philipp Thoss version: "1.0" domain: compliance complexity: intermediate language: multi tags: gxp, decommission, data-retention, migration, archival, compliance

Validiertes System ausser Betrieb nehmen

Die kontrollierte Ausserbetriebnahme eines validierten computergestuetzten Systems planen und durchfuehren, waehrend Datenintegritaet erhalten und regulatorische Aufbewahrungsanforderungen erfuellt werden.

Wann verwenden

  • Ein validiertes System wird durch ein neues System ersetzt
  • Ein System erreicht das Lebensende ohne Ersatz (Geschaeftsprozess eingestellt)
  • Anbieter stellt Support fuer ein validiertes Produkt ein
  • Konsolidierung mehrerer Systeme zu einer einzigen Plattform
  • Regulatorische oder geschaeftliche Aenderungen machen ein System obsolet

Eingaben

  • Erforderlich: Ausser Betrieb zu nehmendes System (Name, Version, Validierungsstatus)
  • Erforderlich: Datenaufbewahrungsanforderungen nach Vorschrift (21 CFR Part 11, GLP, GCP)
  • Erforderlich: Ersatzsystem (falls zutreffend) und Migrationsumfang
  • Optional: Aktuelles Validierungsdokumentationspaket
  • Optional: Inventar zu Datenvolumen und Datenformat
  • Optional: Geschaeftseigentuemer und Stakeholder-Liste

Vorgehensweise

Schritt 1: Datenaufbewahrungsanforderungen beurteilen

Bestimmen, wie lange Daten aufbewahrt werden muessen und in welcher Form:

# Data Retention Assessment
## Document ID: DRA-[SYS]-[YYYY]-[NNN]

### Regulatory Retention Requirements
| Regulation | Data Type | Retention Period | Format Requirements |
|-----------|-----------|-----------------|-------------------|
| 21 CFR 211 (GMP) | Batch records, test results | 1 year past product expiry or 3 years after distribution | Readable, retrievable |
| 21 CFR 58 (GLP) | Study data and records | Duration of study + retention agreement | Original or certified copy |
| ICH E6 (GCP) | Clinical trial records | 2 years after last marketing approval or formal discontinuation | Accessible for inspection |
| 21 CFR Part 11 | Electronic records | Per predicate rule | Original format or validated migration |
| EU Annex 11 | Computerized system records | Per applicable GxP | Readable and available |
| Tax/financial | Financial records | 7-10 years (jurisdiction-dependent) | Readable |

### System Data Inventory
| Data Category | Volume | Format | Retention Required Until | Disposition |
|---------------|--------|--------|------------------------|-------------|
| [e.g., Batch records] | [e.g., 50,000 records] | [e.g., Database + PDF reports] | [Date] | Migrate / Archive / Destroy |
| [e.g., Audit trail] | [e.g., 2M entries] | [e.g., Database] | [Same as parent records] | Archive |
| [e.g., User data] | [e.g., 200 profiles] | [e.g., LDAP/Database] | [Employment + 2 years] | Anonymise and archive |

Erwartet: Jede Datenkategorie hat eine definierte Aufbewahrungsfrist, Formatanforderung und geplante Disposition. Bei Fehler: Sind Aufbewahrungsanforderungen unklar, Regulatory Affairs und Rechtsabteilung konsultieren. Standardmaessig die laengste anwendbare Aufbewahrungsfrist verwenden.

Schritt 2: Datenmigration planen (falls zutreffend)

Wenn Daten in ein Ersatzsystem migriert werden:

# Data Migration Plan
## Document ID: DMP-[SYS]-[YYYY]-[NNN]

### Migration Scope
| Source | Target | Data Category | Records | Migration Method |
|--------|--------|---------------|---------|-----------------|
| [Old system] | [New system] | [Category] | [Count] | ETL / Manual / API |

### Data Mapping
| Source Field | Source Format | Target Field | Target Format | Transformation |
|-------------|-------------|-------------|---------------|---------------|
| [e.g., test_result] | FLOAT(8,2) | [e.g., result_value] | DECIMAL(10,3) | Precision conversion |
| [e.g., operator_id] | VARCHAR(20) | [e.g., user_id] | UUID | Lookup table mapping |

### Validation Approach
| Check | Method | Acceptance Criteria |
|-------|--------|-------------------|
| Record count reconciliation | Source count vs target count | 100% match |
| Field-level comparison | Sample 5% of records, all fields | 100% match after transformation |
| Checksum verification | Hash source vs target for key fields | Checksums match |
| Business rule validation | Verify key calculations in target | Results match source |
| Audit trail continuity | Verify historical audit trail migrated | All entries present with original timestamps |

Erwartet: Migrationsplan enthaelt Mapping, Transformationsregeln und Validierungspruefungen, die belegen, dass die Datenintegritaet erhalten wurde. Bei Fehler: Schlaegt die Migrationsvalidierung fehl, nicht mit der Ausserbetriebnahme fortfahren. Migrationsprobleme beheben und erneut validieren.

Schritt 3: Archivierungsstrategie definieren

Fuer Daten, die archiviert statt migriert werden:

# Archival Strategy

### Archive Format
| Consideration | Decision | Rationale |
|--------------|----------|-----------|
| Format | [PDF/A, CSV, XML, database backup] | [Why this format survives the retention period] |
| Medium | [Network storage, cloud archive, tape, optical] | [Durability and accessibility] |
| Encryption | [Yes/No — method if yes] | [Security vs long-term accessibility trade-off] |
| Integrity verification | [SHA-256 checksums, periodic verification schedule] | [Prove archive is uncorrupted] |

### Archive Verification
- [ ] Archived data is readable without the source system
- [ ] All required data categories are included in the archive
- [ ] Checksums recorded at time of archival
- [ ] Archive can be searched and retrieved within [defined SLA, e.g., 5 business days]
- [ ] Periodic integrity checks scheduled (annually)

### Archive Access
| Role | Access Level | Authorisation |
|------|-------------|--------------|
| QA Director | Read access to all archived data | Standing authorisation |
| Regulatory Affairs | Read access for inspection support | Standing authorisation |
| System Owner (former) | Read access for business queries | Request-based |
| External auditors | Read access, supervised | Per audit plan |

Erwartet: Archivierte Daten sind ohne das urspruengliche System lesbar, durchsuchbar und verifizierbar. Bei Fehler: Koennen Daten ohne das Quellsystem nicht gelesen werden, ist das Archiv nicht konform. Vor der Ausserbetriebnahme in ein offenes Standardformat (PDF/A, CSV) exportieren.

Schritt 4: Ausserbetriebnahme ausfuehren

# Decommission Checklist
## Document ID: DC-[SYS]-[YYYY]-[NNN]

### Pre-Decommission
- [ ] All stakeholders notified of decommission date and data disposition
- [ ] Data migration completed and validated (if applicable)
- [ ] Data archive created and verified (if applicable)
- [ ] Final backup of complete system taken and stored separately
- [ ] All open change requests resolved or transferred
- [ ] All open CAPAs resolved or transferred to successor system
- [ ] All active users informed and redirected to replacement system (if applicable)

### Decommission Execution
- [ ] User access revoked for all accounts
- [ ] System removed from production environment
- [ ] Network connections disconnected
- [ ] Licenses returned or terminated
- [ ] System entry removed from active system inventory
- [ ] System moved to "Decommissioned" status in compliance architecture

### Post-Decommission
- [ ] Validation documentation archived (URS, VP, IQ/OQ/PQ, TM, VSR)
- [ ] SOPs retired or updated to remove references to decommissioned system
- [ ] Training records archived
- [ ] Change control records archived
- [ ] Audit trail archived
- [ ] Decommission report completed and approved

### Decommission Report
| Section | Content |
|---------|---------|
| System description | Name, version, purpose, GxP classification |
| Decommission rationale | Why the system is being retired |
| Data disposition summary | What data went where (migrated, archived, destroyed) |
| Validation evidence | Migration validation results, archive verification |
| Residual risk | Any ongoing data retention obligations |
| Approval | System owner, QA, IT signatures |

Erwartet: Ausserbetriebnahme ist kontrolliert, dokumentiert und genehmigt — nicht einfach "abschalten". Bei Fehler: Kann ein Checklisten-Element nicht abgeschlossen werden, die Ausnahme dokumentieren und QA-Genehmigung einholen, bevor weitergemacht wird.

Validierung

  • Datenaufbewahrungsanforderungen fuer alle Datenkategorien bewertet
  • Datenmigration mit Datensatzzaehlung, Stichproben und Pruefsummen validiert (falls zutreffend)
  • Archiv in einem Format erstellt, das ohne das Quellsystem lesbar ist
  • Archivintegritaet mit Pruefsummen verifiziert
  • Alle Benutzerzugaenge gesperrt
  • Validierungsdokumentation mit definierter Aufbewahrungsfrist archiviert
  • SOPs aktualisiert um Referenzen auf das ausser Betrieb genommene System zu entfernen
  • Ausserbetriebnahmebericht von Systemeigentuemer, QA und IT genehmigt

Haeufige Stolperfallen

  • Vorzeitige Ausserbetriebnahme: Ein System ausschalten, bevor die Datenmigration validiert ist, riskiert dauerhaften Datenverlust. Alle Validierungen abschliessen, bevor abgeschaltet wird.
  • Nicht lesbare Archive: Daten in einem proprietaeren Format zu speichern, das das urspruengliche System zum Lesen benoetigt, macht den Archivierungszweck zunichte. Offene Formate verwenden.
  • Vergessene Auditpfade: Daten zu archivieren aber nicht den Auditpfad bedeutet, dass die Datenprovenienz nicht nachgewiesen werden kann. Auditpfade immer mit ihren uebergeordneten Aufzeichnungen archivieren.
  • Verwaiste SOPs: SOPs, die noch auf ein ausser Betrieb genommenes System verweisen, verwirren Nutzer und erzeugen Compliance-Luecken. Alle betroffenen SOPs aktualisieren oder ausser Kraft setzen.
  • Keine regelmaessige Archivverifizierung: Archive verschlechtern sich. Ohne regelmaessige Integritaetspruefungen kann Datenverlust unbemerkt bleiben, bis die Daten fuer eine Inspektion benoetigt werden.

Verwandte Skills

  • design-compliance-architecture — Systeminventar und Compliance-Architektur nach der Ausserbetriebnahme aktualisieren
  • manage-change-control — Ausserbetriebnahme ist eine wesentliche Aenderung, die Aenderungskontrolle erfordert
  • write-validation-documentation — Migrationsvalidierung folgt derselben IQ/OQ-Methodik
  • write-standard-operating-procedure — SOPs, die auf das ausser Betrieb genommene System verweisen, ausser Kraft setzen oder aktualisieren
  • prepare-inspection-readiness — archivierte Daten muessen fuer Behoerdeninspektionen zugaenglich bleiben

GitHub 仓库

pjt222/agent-almanac
路径: i18n/de/skills/decommission-validated-system
0
agentsagentskillsai-assisted-developmentclaude-codeskillsteams
FAQ

Frequently asked questions

What is the decommission-validated-system skill?

decommission-validated-system is a Claude Skill by pjt222. Skills package instructions and resources that Claude loads on demand, so Claude can perform decommission-validated-system-related tasks without extra prompting.

How do I install decommission-validated-system?

Use the install commands on this page: add decommission-validated-system to Claude Code as a plugin, or clone its repository into your skills directory, then restart Claude so it picks up the skill.

What category does decommission-validated-system belong to?

decommission-validated-system is in the Other category, tagged general.

Is decommission-validated-system free to use?

Yes. decommission-validated-system is listed on AIMCP and free to install. It runs inside Claude, so no separate service account is required to use the skill itself.

相关推荐技能

llamaguard
其他

LlamaGuard是Meta推出的7-8B参数内容审核模型,专门用于过滤LLM的输入和输出内容。它能检测六大安全风险类别(暴力/仇恨、性内容、武器、违禁品、自残、犯罪计划),准确率达94-95%。开发者可通过HuggingFace、vLLM或Sagemaker快速部署,并能与NeMo Guardrails集成实现自动化安全防护。

查看技能
cost-optimization
其他

这个Claude Skill帮助开发者优化云成本,通过资源调整、标记策略和预留实例来降低AWS、Azure和GCP的开支。它适用于减少云支出、分析基础设施成本或实施成本治理策略的场景。关键功能包括提供成本可视化、资源规模调整指导和定价模型优化建议。

查看技能
sports-betting-analyzer
其他

该Skill为开发者提供体育博彩数据分析工具,可分析盘口、大小球和特殊投注,识别价值投注机会。它整合历史数据和情景统计,生成包含时间戳的结构化Markdown报告。适用于需要快速获取博彩市场洞察的娱乐或教育类应用开发。

查看技能
quantizing-models-bitsandbytes
其他

这个Skill使用bitsandbytes库量化大语言模型,能在GPU内存有限时通过8位或4位量化减少50-75%内存占用,同时保持精度损失最小。它支持INT8、NF4、FP4等多种量化格式,可与HuggingFace Transformers无缝集成,适用于需要部署更大模型或加速推理的场景。还提供QLoRA训练和8位优化器支持,让开发者能轻松实现高效模型压缩。

查看技能