This skill provides a structured process for decommissioning a validated computerized system at its end-of-life. It handles critical compliance tasks including regulatory data retention assessment, validated data migration, archival strategy, and access revocation. Use it when replacing a system, consolidating multiple systems, or when vendor support ends or regulatory changes occur.

快速安装

Claude Code

推荐
主要方式
npx skills add pjt222/agent-almanac -a claude-code
插件命令备选方式
/plugin add https://github.com/pjt222/agent-almanac
Git 克隆备选方式
git clone https://github.com/pjt222/agent-almanac.git ~/.claude/skills/decommission-validated-system

在 Claude Code 中复制并粘贴此命令以安装该技能

技能文档

驗證系統退役

計畫並執一已驗證之電腦化系統於生命末之控制退役,保資料完整性並合法規保留要求。

適用時機

  • 已驗證系統為新系統所替
  • 系統達生命末而無替代(業務程序除)
  • 供應商停對已驗證產品之支援
  • 多系統併入單一平台
  • 法規或業務改令系統過時

輸入

  • 必要:待退役之系統(名、版、驗證狀態)
  • 必要:按法規(21 CFR Part 11、GLP、GCP)之資料保留要求
  • 必要:替代系統(若適用)與遷移範圍
  • 選擇性:當前驗證文件包
  • 選擇性:資料量與格式清單
  • 選擇性:業務擁有者與相關者清單

步驟

步驟一:評資料保留要求

定資料須保留多久及以何形式:

# Data Retention Assessment
## Document ID: DRA-[SYS]-[YYYY]-[NNN]

### Regulatory Retention Requirements
| Regulation | Data Type | Retention Period | Format Requirements |
|-----------|-----------|-----------------|-------------------|
| 21 CFR 211 (GMP) | Batch records, test results | 1 year past product expiry or 3 years after distribution | Readable, retrievable |
| 21 CFR 58 (GLP) | Study data and records | Duration of study + retention agreement | Original or certified copy |
| ICH E6 (GCP) | Clinical trial records | 2 years after last marketing approval or formal discontinuation | Accessible for inspection |
| 21 CFR Part 11 | Electronic records | Per predicate rule | Original format or validated migration |
| EU Annex 11 | Computerized system records | Per applicable GxP | Readable and available |
| Tax/financial | Financial records | 7-10 years (jurisdiction-dependent) | Readable |

### System Data Inventory
| Data Category | Volume | Format | Retention Required Until | Disposition |
|---------------|--------|--------|------------------------|-------------|
| [e.g., Batch records] | [e.g., 50,000 records] | [e.g., Database + PDF reports] | [Date] | Migrate / Archive / Destroy |
| [e.g., Audit trail] | [e.g., 2M entries] | [e.g., Database] | [Same as parent records] | Archive |
| [e.g., User data] | [e.g., 200 profiles] | [e.g., LDAP/Database] | [Employment + 2 years] | Anonymise and archive |

預期: 各資料類皆有定之保留期、格式要求、計畫處置。 失敗時: 若保留要求不清,諮法規事務與法務。預設為最長適用保留期。

步驟二:計畫資料遷移(若適用)

若資料遷至替代系統:

# Data Migration Plan
## Document ID: DMP-[SYS]-[YYYY]-[NNN]

### Migration Scope
| Source | Target | Data Category | Records | Migration Method |
|--------|--------|---------------|---------|-----------------|
| [Old system] | [New system] | [Category] | [Count] | ETL / Manual / API |

### Data Mapping
| Source Field | Source Format | Target Field | Target Format | Transformation |
|-------------|-------------|-------------|---------------|---------------|
| [e.g., test_result] | FLOAT(8,2) | [e.g., result_value] | DECIMAL(10,3) | Precision conversion |
| [e.g., operator_id] | VARCHAR(20) | [e.g., user_id] | UUID | Lookup table mapping |

### Validation Approach
| Check | Method | Acceptance Criteria |
|-------|--------|-------------------|
| Record count reconciliation | Source count vs target count | 100% match |
| Field-level comparison | Sample 5% of records, all fields | 100% match after transformation |
| Checksum verification | Hash source vs target for key fields | Checksums match |
| Business rule validation | Verify key calculations in target | Results match source |
| Audit trail continuity | Verify historical audit trail migrated | All entries present with original timestamps |

預期: 遷移計畫含映射、轉換規則、證資料完整性已保之驗證檢查。 失敗時: 若遷移驗證敗,勿進至退役。修遷移問題並重驗。

步驟三:定歸檔策略

將歸檔而非遷移之資料:

# Archival Strategy

### Archive Format
| Consideration | Decision | Rationale |
|--------------|----------|-----------|
| Format | [PDF/A, CSV, XML, database backup] | [Why this format survives the retention period] |
| Medium | [Network storage, cloud archive, tape, optical] | [Durability and accessibility] |
| Encryption | [Yes/No — method if yes] | [Security vs long-term accessibility trade-off] |
| Integrity verification | [SHA-256 checksums, periodic verification schedule] | [Prove archive is uncorrupted] |

### Archive Verification
- [ ] Archived data is readable without the source system
- [ ] All required data categories are included in the archive
- [ ] Checksums recorded at time of archival
- [ ] Archive can be searched and retrieved within [defined SLA, e.g., 5 business days]
- [ ] Periodic integrity checks scheduled (annually)

### Archive Access
| Role | Access Level | Authorisation |
|------|-------------|--------------|
| QA Director | Read access to all archived data | Standing authorisation |
| Regulatory Affairs | Read access for inspection support | Standing authorisation |
| System Owner (former) | Read access for business queries | Request-based |
| External auditors | Read access, supervised | Per audit plan |

預期: 歸檔資料可讀、可搜、可驗而無需原始系統。 失敗時: 若資料不能獨於源系統讀,歸檔不合規。退役前考慮匯出為開放、標準格式(PDF/A、CSV)。

步驟四:執退役

# Decommission Checklist
## Document ID: DC-[SYS]-[YYYY]-[NNN]

### Pre-Decommission
- [ ] All stakeholders notified of decommission date and data disposition
- [ ] Data migration completed and validated (if applicable)
- [ ] Data archive created and verified (if applicable)
- [ ] Final backup of complete system taken and stored separately
- [ ] All open change requests resolved or transferred
- [ ] All open CAPAs resolved or transferred to successor system
- [ ] All active users informed and redirected to replacement system (if applicable)

### Decommission Execution
- [ ] User access revoked for all accounts
- [ ] System removed from production environment
- [ ] Network connections disconnected
- [ ] Licenses returned or terminated
- [ ] System entry removed from active system inventory
- [ ] System moved to "Decommissioned" status in compliance architecture

### Post-Decommission
- [ ] Validation documentation archived (URS, VP, IQ/OQ/PQ, TM, VSR)
- [ ] SOPs retired or updated to remove references to decommissioned system
- [ ] Training records archived
- [ ] Change control records archived
- [ ] Audit trail archived
- [ ] Decommission report completed and approved

### Decommission Report
| Section | Content |
|---------|---------|
| System description | Name, version, purpose, GxP classification |
| Decommission rationale | Why the system is being retired |
| Data disposition summary | What data went where (migrated, archived, destroyed) |
| Validation evidence | Migration validation results, archive verification |
| Residual risk | Any ongoing data retention obligations |
| Approval | System owner, QA, IT signatures |

預期: 退役為控制、有錄、已核——非單「關之」。 失敗時: 若任何清單項不能完,記例外並得 QA 核方續。

驗證

  • 所有資料類皆已評保留要求
  • 資料遷移以記錄計數、取樣、校驗和驗證(若適用)
  • 歸檔造於無需源系統可讀之格式
  • 歸檔完整性以校驗和驗
  • 所有用戶存取已撤
  • 驗證文件已歸檔,含定之保留期
  • SOP 已更以除對退役系統之引
  • 退役報告為系統擁有者、QA、IT 所核

常見陷阱

  • 早退役:資料遷移驗證前關系統險永資料失。拔插前完所有驗證
  • 不可讀之歸檔:存於需原系統方讀之專屬格式違歸檔之意。用開放格式
  • 忘之審計軌:歸檔資料而非審計軌令資料溯源不能示。恒與父記錄歸檔審計軌
  • 孤立之 SOP:仍引退役系統之 SOP 令用戶惑並生合規缺。更或退所有受影響之 SOP
  • 無週期性歸檔驗證:歸檔降。無週期性完整性察,資料失或不察直至檢查需資料

相關技能

  • design-compliance-architecture —— 退役後更系統清單與合規架構
  • manage-change-control —— 退役為需變更控制之大改
  • write-validation-documentation —— 遷移驗證循同 IQ/OQ 方法論
  • write-standard-operating-procedure —— 退或更引退役系統之 SOP
  • prepare-inspection-readiness —— 歸檔資料須續可為法規檢查所用

GitHub 仓库

pjt222/agent-almanac
路径: i18n/wenyan-lite/skills/decommission-validated-system
0
agentsagentskillsai-assisted-developmentclaude-codeskillsteams

相关推荐技能

evaluating-llms-harness

测试

该Skill通过60+个学术基准测试(如MMLU、GSM8K等)评估大语言模型质量,适用于模型对比、学术研究及训练进度追踪。它支持HuggingFace、vLLM和API接口,被EleutherAI等行业领先机构广泛采用。开发者可通过简单命令行快速对模型进行多任务批量评估。

查看技能

cloudflare-cron-triggers

测试

这个Claude Skill提供了关于Cloudflare Cron Triggers的完整知识库,用于通过cron表达式定时执行Workers。它支持配置周期性任务、维护作业和自动化工作流,并能处理常见的cron触发错误。开发者可以用它来设置定时任务、测试cron处理器,并集成Workflows和Green Compute功能。

查看技能

webapp-testing

测试

该Skill为开发者提供了基于Playwright的本地Web应用测试工具集,支持自动化测试前端功能、调试UI行为、捕获屏幕截图和查看浏览器日志。它包含管理服务器生命周期的辅助脚本,可直接作为黑盒工具运行而无需阅读源码。适用于需要快速验证本地Web应用界面和交互功能的开发场景。